Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212B896 + (13:00:20, 5 December 2024)
- ML20212B894 + (13:00:21, 5 December 2024)
- ML20212B892 + (13:00:22, 5 December 2024)
- ML20212B890 + (13:00:22, 5 December 2024)
- ML20212B889 + (13:00:23, 5 December 2024)
- ML20212B885 + (13:00:26, 5 December 2024)
- ML20212B884 + (13:00:27, 5 December 2024)
- ML20212B881 + (13:00:30, 5 December 2024)
- NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With + (13:00:31, 5 December 2024)
- ML20212B879 + (13:00:32, 5 December 2024)
- ML20212B878 + (13:00:32, 5 December 2024)
- ML20212B876 + (13:00:33, 5 December 2024)
- ML20212B877 + (13:00:33, 5 December 2024)
- ML20212B874 + (13:00:34, 5 December 2024)
- PNO-III-86-075, on 860731,village of Seneca,Il Filed Suit Against NRC to Prevent Resumption of Facility Operation.Suit Cites Alleged Shortcomings in Emergency Planning Activities & Troubled Performance Record + (13:00:35, 5 December 2024)
- 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept + (14:14:59, 5 December 2024)
- ML20212B869 + (15:07:33, 5 December 2024)
- ML20212B867 + (01:33:15, 6 December 2024)
- ML20212B866 + (01:33:17, 6 December 2024)
- ML20212B864 + (01:33:18, 6 December 2024)
- ML20212B865 + (01:33:18, 6 December 2024)
- ST-HL-AE-1938, Forwards Annotated Revs to FSAR Pages 9.1-6,9.1-7,9.1-8 & 9.1-31,deleting Refs to Location of Skimmer Strainer Assembly in Fuel Transfer Canal.Changes Will Be Incorporated in FSAR Amend 58 + (01:33:19, 6 December 2024)
- ML20212B858 + (01:33:24, 6 December 2024)
- ML20212B857 + (01:33:27, 6 December 2024)
- ML20212B856 + (01:33:28, 6 December 2024)
- ML20212B855 + (01:33:29, 6 December 2024)
- ML20212B854 + (01:33:30, 6 December 2024)
- ML20212B852 + (01:33:30, 6 December 2024)
- ML20212B849 + (01:33:31, 6 December 2024)
- ML20212B846 + (01:33:35, 6 December 2024)
- RBG-24090, Ro:On 860624,Div III Diesel Generator Failed During Surveillance Testing.Caused by Timing Error.No Corrective Actions Noted + (01:33:37, 6 December 2024)
- ML20212B845 + (01:33:37, 6 December 2024)
- ML20212B842 + (01:33:38, 6 December 2024)
- ML20212B840 + (01:33:39, 6 December 2024)
- B12130, Forwards Listed Summaries to Isap Topics,Including Isap 1.04, Seismic Qualification of Safety-Related Piping, in Response to 850731 Request.Public Safety Impact Scores Preliminary Since Analysis of Isap Not Completed + (01:33:39, 6 December 2024)
- NPL-97-0596, Informs That Reference Paragraph Submitted in 950127 Relief Request RR-2-20,is Incorrect.Correct Reference to Code of Federal Regulations for Relief Request RR-2-20 Is 10CFR50.55a(g)(6)(ii)(A)(5) + (01:33:40, 6 December 2024)
- ML20212B835 + (01:33:41, 6 December 2024)
- ML20212B832 + (01:33:49, 6 December 2024)
- ML20212B828 + (01:33:50, 6 December 2024)
- ML20212B827 + (01:33:51, 6 December 2024)
- IR 05000341/1986021 + (01:33:52, 6 December 2024)
- SVP-97-237, Informs That New Due Date of 971202 Has Been Assigned to Completion of Revised App R Conformance Safe Shutdown Rept, Originally Committed to Complete by 970928.Extension Is Due to Significant Effort Required to Complete App R Project + (01:33:52, 6 December 2024)
- U-600662, Provides Justification for Deleting Berm Height Requirement to Divert Flood Water Runoff from Entering Excavation,Per FSAR Section 2.5.4.14.4 & Sser 2 (NUREG-0853).As-built Berm Satisfactory & Will Be Included in Next FSAR Rev + (01:33:54, 6 December 2024)
- ML20212B820 + (01:33:54, 6 December 2024)
- PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph + (01:33:55, 6 December 2024)
- ML20212B817 + (01:33:56, 6 December 2024)
- ML20212B816 + (01:33:56, 6 December 2024)
- ML20212B814 + (01:33:57, 6 December 2024)
- PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph + (01:33:58, 6 December 2024)
- ML20212B807 + (01:34:03, 6 December 2024)
- ML20212B804 + (01:34:04, 6 December 2024)
- ML20212B801 + (01:34:05, 6 December 2024)