Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M72146 + (23:45:55, 5 January 2025)
- ML18153C938 + (23:45:57, 5 January 2025)
- ML18153C936 + (23:45:58, 5 January 2025)
- ML18153C934 + (23:45:59, 5 January 2025)
- ML18153C932 + (23:46:00, 5 January 2025)
- ML18153C929 + (23:46:01, 5 January 2025)
- ML18153C930 + (23:46:01, 5 January 2025)
- ML18153C927 + (23:46:02, 5 January 2025)
- IR 05000280/1991033 + (23:46:03, 5 January 2025)
- IR 05000280/1992002 + (23:46:05, 5 January 2025)
- 05000280/LER-1992-003-01, :on 920214,incomplete Engineered Safety Features Testing Due to Procedure Deficiency.Testing Procedures Were Changed & Actuation Testing of Low RCS Average Temp Relays Performed Satisfactorily + (23:46:07, 5 January 2025)
- ML18153C923 + (23:46:09, 5 January 2025)
- ML18153C922 + (23:46:10, 5 January 2025)
- ML18153C920 + (23:46:11, 5 January 2025)
- ML18153C919 + (23:46:12, 5 January 2025)
- ML18153C917 + (23:46:13, 5 January 2025)
- ML18153C916 + (23:46:14, 5 January 2025)
- ML18153C915 + (23:46:15, 5 January 2025)
- ML18153C914 + (23:46:16, 5 January 2025)
- ML18153C912 + (23:46:17, 5 January 2025)
- ML18153C913 + (23:46:17, 5 January 2025)
- IR 05000280/1992001 + (23:46:24, 5 January 2025)
- ML18153C909 + (23:46:26, 5 January 2025)
- ML18153C907 + (23:46:27, 5 January 2025)
- 05000281/LER-1992-001-03, :on 920130,charging Pump 2-CH-P-1A Declared Inoperable Due to Oil Leak & Ventilation Damper for Charging Pump B Cubicle Failed to Open.Caused by Mechanical Failure/Personnel Error.Pump Repaired + (23:46:29, 5 January 2025)
- ML18153C904 + (23:46:30, 5 January 2025)
- ML18153C903 + (23:46:31, 5 January 2025)
- 05000281/LER-1991-014, :on 910724,determined That Scaling for Main Steam Flow Transmitters Incorrect,Resulting in Setpoints in Excess of Max Allowed Value of 110%.Caused by Use of Incorrect Methodology.Scaling Program Underway + (23:46:32, 5 January 2025)
- ML18153C901 + (23:46:34, 5 January 2025)
- ML18153C900 + (23:46:35, 5 January 2025)
- ML18153C899 + (23:46:35, 5 January 2025)
- ML18153C898 + (23:46:36, 5 January 2025)
- ML18153C897 + (23:46:37, 5 January 2025)
- 05000280/LER-1992-002, On 920106,4160 Volt Transfer Buses D,E & F UV Relay Trip Setpoints Set Below TS Limits.Caused by Calibr Process Error.Relays Recalibr & Set to More Conservative Values than Required + (23:46:38, 5 January 2025)
- 05000280/LER-1992-001, :on 920102,during Control Rod Freedom of Movement Test,Rod H-2 Dropped Due to Personnel Error.Control Rod H-2 Verified to Be in Core by Observing Skewed Core Power Distribution + (23:46:40, 5 January 2025)
- ML18153C894 + (23:46:45, 5 January 2025)
- IR 05000280/1991035 + (23:46:46, 5 January 2025)
- IR 05000280/1991036 + (23:46:48, 5 January 2025)
- ML18153C890 + (23:46:50, 5 January 2025)
- ML18153C887 + (23:46:51, 5 January 2025)
- ML18153C888 + (23:46:51, 5 January 2025)
- ML18153C885 + (23:46:52, 5 January 2025)
- ML18153C882 + (23:46:53, 5 January 2025)
- ML18153C884 + (23:46:53, 5 January 2025)
- ML18153C881 + (23:46:55, 5 January 2025)
- ML18153C880 + (23:46:56, 5 January 2025)
- IR 05000280/1991032 + (23:46:57, 5 January 2025)
- IR 05000280/1991024 + (23:46:58, 5 January 2025)
- ML18153C877 + (23:47:03, 5 January 2025)
- ML18153C875 + (23:47:04, 5 January 2025)
- ML18153C874 + (23:47:05, 5 January 2025)