ENCLOSURE 1 NOTICE OF* VIOLATION Virginia Electric and Power Company Surry Unit 1 Docket No *. 50-280 License No. DPR-32 During the Nuclear Regulatory Corrmission (NRC) inspection conducted on December 1, 1991, through January 4, 1992, a violation of NRC requirements was identified.
In accordance with the *General Statement of Policy and Procedure for NRC Enforcement Actions,* 10 CFR Part 2, Appendix C (1991), the violation is listed below:
10 CFR 50.55a(g){6)(i) states in part that the Corrvnission will evaluate determinations of Code impracticality and may grant relief and may impose alternate requirements.
Contrary to the above, on December 20, 1991, the licensee returned the Unit 1 letdown system to service without repairing a leak on a weld of the Class 2 letdown 1 ine.
This leak did not meet the Code requirements in IWA-5250 of Section XI of the ASME Code and the licensee did not submit requests for evaluation and relief from the Code requirements.
This is a Severity Level IV violation {Supplement I).
Pur~uant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory COITlnission, ATTN: Document Control Desk, Washington, O.C.
20555 with a copy to the Regional Administrator, Region II, a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice of Violation {Notice).
Thi.s reply should be clearly marked as a *Reply to a Notice of Violation* and should include for each vfolation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the-results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified. in this Notice, an order or a demand for information may be issued as to why the license should not be modified, suspended, or revoked,. or why such other action as may be proper should not be taken.
Where good cause is shown, ~onsideration will be given to extending the response time.
Dated at Atlanta, Georgia this 29th day of January 1992 9203090256 920203 PDR ADOCK 05000280 G