Text
,--------
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 31, 1992 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO GENERIC LETTER 91-11 Serial No.
NO/ETS Docket Nos.
License Nos.91-456 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Generic Letter (GL) 91-11, entitled "Resolution of Generic Issues 48, "LCOs FOR CLASS 1 E VITAL INSTRUMENT BUSES," AND 49,"INTERLOCKS AND LCOs FOR CLASS 1 E TIE BREAKERS" requests certification that appropriate procedures have been implemented to fultili the following requirements:
- Limit the time that a plant is in possible violation of the single failure criterion with regard to the Class 1 E vital instrument buses and tie breakers, Require surveillances of these components, and Ensure that, for the times covered in the first item, the plant is operating in an electrical configuration consistent with the regulations and its design.
Both Surry and North Anna have the necessary controls to meet the intent of Generic Letter 91-11 for operation and surveillance of vital buses, inverters and Class 1 E tie breakers.
North Anna's controls are applied through Technical Specification requirements and procedures.
Surry has implemented the requirements through administrative controls and procedures.
This information is true and accurate to the best of my knowledge. Should you have any questions please contact us.
Very truly yours,
~Lsb W. L. Stewart Senior Vice President - Nuclear 9202060060 920131 PDR ADOCK 05000280 p
cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. M.. Lesser NRC Senior Resident Inspector North Anna Power Station
=:._=--=----~----
- ___ ~
e
, a 4
COMMONWEAL TH OF VIRGINIA )
)
COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President - Nuclear, of Virginia Electric and Power Company.
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 3/ ~T day of My Commission Expires:
( Jl/~ 3/ ~
, 199.l:_.
, 19Pi...
_a_ ~JiiJ.il -
Notar{Tublic (SEAL)