Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19254D714 + (11:53:10, 4 January 2025)
- ML19254D712 + (11:53:12, 4 January 2025)
- ML19254D711 + (11:53:13, 4 January 2025)
- ML19254D709 + (11:53:17, 4 January 2025)
- ML19254D708 + (11:53:18, 4 January 2025)
- ML19254D707 + (11:53:19, 4 January 2025)
- ML19254D706 + (11:53:20, 4 January 2025)
- ML19254D705 + (11:53:22, 4 January 2025)
- 05000271/LER-1979-027-03, /03L-0:on 790925,mainsteam Safety/Relief Valves Sin 67HH13 Had Setpoint of 1,088 Psig,Greater than Tech Spec Max.Caused by Setpoint Drift.Valve Adjusted to Proper Setpoint + (11:53:52, 4 January 2025)
- 05000271/LER-1979-027, Forwards LER 79-027/03L-0 + (11:54:16, 4 January 2025)
- 05000278/LER-1979-031-01, /01T-0:on 791003,rigid angle-iron Hanger Bolts Found Detached & Hanger Nonfunctional.Caused by Improper Installation.Two Anchor Bolts Were Replaced w/wedge-type Anchor Bolts + (11:54:42, 4 January 2025)
- ML19254D698 + (11:54:46, 4 January 2025)
- 05000278/LER-1979-031, Forwards LER 79-031/01T-0 + (11:54:55, 4 January 2025)
- 05000333/LER-1979-079-01, /01T-0:on 791010,pipe Support Associated W/Emergency Svc Water Sys B Was Considered Inoperable Per Tech Specs.Cause Not Stated.Existing Support Was Upgraded + (11:55:09, 4 January 2025)
- ML19254D693 + (11:55:13, 4 January 2025)
- ML19254D692 + (11:55:14, 4 January 2025)
- ML19254D689 + (11:55:15, 4 January 2025)
- 05000333/LER-1979-079, Forwards LER 79-079/01T-0 + (11:55:22, 4 January 2025)
- ML19254D687 + (11:55:25, 4 January 2025)
- ML19254D685 + (11:55:26, 4 January 2025)
- ML19254D684 + (11:55:28, 4 January 2025)
- ML19254D682 + (11:55:30, 4 January 2025)
- ML19254D680 + (11:55:32, 4 January 2025)
- ML19254D679 + (11:55:39, 4 January 2025)
- ML19254D678 + (11:55:42, 4 January 2025)
- ML19254D677 + (11:55:44, 4 January 2025)
- 05000333/LER-1979-081, Forwards LER 79-081/01T-0 + (11:55:48, 4 January 2025)
- 05000317/LER-1979-053-03, /03L-0:on 790928,actuator Arm for Shutdown Cooling Heat Exchanger Outlet Valve 11 Was Found Broken,Rendering Exchanger Inoperable.Caused by Failed Actuator Vane Arm Disconnecting Actuator from Valve Stem + (11:55:52, 4 January 2025)
- ML19254D672 + (11:55:56, 4 January 2025)
- ML19254D671 + (11:55:59, 4 January 2025)
- ML19254D670 + (11:56:00, 4 January 2025)
- 05000317/LER-1979-053, Forwards LER 79-053/03L-0 + (11:56:03, 4 January 2025)
- ML19254D663 + (11:56:15, 4 January 2025)
- ML19254D660 + (11:56:16, 4 January 2025)
- ML19254D658 + (11:56:30, 4 January 2025)
- ML19254D657 + (11:56:32, 4 January 2025)
- ML19254D655 + (11:56:34, 4 January 2025)
- ML19254D654 + (11:56:40, 4 January 2025)
- 05000366/LER-1979-108-03, /03L-0:on 790926,instruments 2/C71-N002A,C & D Were Found to Exceed Tech Spec Limit During High Drywell Pressure Functional Test & Calibr.Caused by Setpoint Drift. Instruments Were Recalibr & Returned to Svc + (11:56:44, 4 January 2025)
- 05000366/LER-1979-108, Forwards LER 79-108/03L-0 + (11:56:49, 4 January 2025)
- ML19254D650 + (11:56:51, 4 January 2025)
- ML19254D649 + (11:56:54, 4 January 2025)
- ML19254D648 + (11:56:55, 4 January 2025)
- ML19254D647 + (11:56:57, 4 January 2025)
- ML19254D646 + (11:57:02, 4 January 2025)
- ML19254D644 + (11:57:04, 4 January 2025)
- ML19254D642 + (11:57:05, 4 January 2025)
- ML19254D641 + (11:57:08, 4 January 2025)
- ML19254D640 + (11:57:10, 4 January 2025)
- ML19254D639 + (11:57:11, 4 January 2025)
- ML19254D638 + (11:57:16, 4 January 2025)