U. 3. NUCIIAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900248/79-02 Program No. 51300 Company:
Union Pump Company 87 Capitol Avenue Battle Creek, Michigan Inspection Conducted: July 9-13, 1979 e
f Inspector:
C
)
11AA_
k3 L. E. Ellershaw, Contjactor Inspected Date
/
ComponentsSection II Vendor Inspection Branch e
r Approved by:
\\/
G/LB (L
b [3 - ) 9 5
' Date "I
D. M. Hunnicutt*, ChieI k
ComponentsSection II Vendor Inspection Branch m.
Summary
\\
Inspection conducted July 9-13, 1979 (99900248/79-02)
Areas Inspected:
Implementation of 10 CFR 50 Appendix B Criteria, and applicable codes and standards including: previous inspection findings; nonconformances and corrective action; internal audits; qualification of personnel - nondestructive examination; manufacturing process control; o.d quality assurance records. The inspection involved thirty (30) inspector-hours on site.
Results:
In the six (6) areas inspected, three (3) deviations from commitment were identified, and one previous inspection finding remains open.
Deviations:
Internal Audits - the semi-annual management audits performed by the QA manager do not encompass the complete QC Program (Notice of Deviation, Item A.); Qualification of Personnel - Nondestructive Examination - qualifica-tions of personnel performing subcontracted magnetic particle examinations, were not on file at Union Pump Company (Notice of Deviation, Item B.1.);
Manufacturing Process Control - required visual inspection reports, documenting results of visual inspections of ASME Section III, Class NF welds, have not been filled out (Notice of Deviation, Item B.2.).
1221 051 7910290 Z57
3 DETAILS SECTION A.
Persons Contacted W. Bakkila, Quality Control Coordinator
- T. Blanke, Quality Control Coordinator
- W. Bramble, Inspection Supervisor
- R. 5. Clift, Assistant Manager, Quality Control
- P. D. Kivin, Quality Control Coordinator
- R. A. Sheeler, Quality Control Coordinator
- P. D. Woods, Manager, Quality Control
- Denotes those attending exit interview (see paragraph H.)
B.
Action on Previous Inspection Findings 1.
(Closed) Deviatiot No. A. (Report No. 79-01): This item dealt with weld procedure specifications (WPSs) not addressing all ASME required essential and nonessential variables.
Union Pump Company (UPC) has implemented their committed corrective actions in that WPSs have been reviewed, revised, and requalified where necessary.
2.
(0 pen) Deviation No. B. (Report No. 79-01): This Mtem dealt with components receiving postweld heat treatment, in edcess of that which was allowed by the WPS.
Union Pump Company's (UPC) letters of corrective action dated May 4, 1979, and June 8,1979, address requalification of specific weld procedure specifications (WPSs) requiring postweld heat treatment.
These included a UPC WPS and a WPS f.om each of two (2) foundry subcontractors.
In addition, the customer's response to UPC inquiry, (attachments to the letter of corrective action) states in part,
. you prepare and submit a DDR (Deviation Disposition Request) to dispose of this deviation after yc. have requalified the weld procedure for the intended eighteen-hour PWHT time."
At the time of this inspection, the following conditions existed:
One foundry subcontractor (Empire Steel Castings, Inc.) had a.
not requalified their WPS.
I22i 052 b
-.a.
4 b.
UFC is contractually obligated to submit procedures and specifications, including requalified LTSs to their customer for review and approval.
UPC had requalified and submitted their kTS, however, they had not yet received approval. A DDR had not been submitted to the customer, for it is to be based upon the customer approved LTS.
C.
Noncertformances and Corrective Action 1.
Obj ect.1 vy The objectives of this area of the inspection were to verify that.
UFC had implemented the requirements for the control of nonconfor-mances and corrective actions in accordance with the QA Manual and applica' ale NRC and ASPI Code requirements.
- i..
Method of Accompli hment The preceding objectives were accomplished by:
a.
Review of QA Manual Section 10, "Non-Conformities and Corrective Ac tiori, Revision 0.
b.
Review of Non-Conformity Report (NCR) Log.
c.,
Observation of nonconforming parts, as identified by the NCR Log, to verify identificetion.
d.
Observation of Nuclear Hold Area and verification of identity of parts located therein.
e.
Review of Material Review Board (MRB) activities and verifica-tion of disposition submittal to the Authorized Nuclear Inspector (ANI) for concurrence, when required.
f.
Discussions with cognizant personnel.
3.
Findings a.
Deviation from Commitments None.
~
1221 053
5 b.
Unresolved Item None.
D.
Internal Audits 1.
Objectives The objectives of this area of the inspection were to verify that UFC had inplemented the requirements for scheduling and implementing internal audits in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objectives were accomplished by:
Review of QA Manual Section 20, " Internal Audits", Revision O.
e.
b.
Review of completed internal audits in light of scheduling, completion, responses (where required), and follow-up.
c.
Review of QCR-0301 0,
" Internal Audit Checklist", to assure covergge of the complete QC Program.
d.
Discussions with cognizant personnel.
3.,
Findings
'\\
a.'
Deviation from Commitment See Notice of Deviation, Item A.
b.
Unresolved Item None.
E.
Qualification of Personnel - Nondestructive Examination (NDE) 1.
Objectives The objectives of this area of the inspection were to verify that UPC had implemented the requ'rements for qualification of NDE personnel and the maintenance of the resultant qualification records in accordance with the QA Manual and applicable NRC and ASME Code requirements.
I22i OS4
6 2.
Method of Accomplishment The preceding objectives were accomplished by:
Review of QC Manual Section 15, "Non-Destructive Examination",
a.
Rev'.aion 0.
b.
Review of NDE personnel records, ucth UPC's and subcontractor's.
c.
Review of records relative to subcontracted NDE.
d.
Discussions with cognizant personnel.
3.
Findings a.
Deviation From Commitment See Notice of Deviation, Item B.I.
Magnetic particle examination (MT) of repair welds to a Cover, S/N UP158, Heat No. 6817A, was subcontracted to PRL Industries, Inc., Cornwall, Pennsylvania. The MT was performed and a NDE Report was generated, signed, and dated on February 5,1979, by PRL. The NDE Report was subsequently accepted by UPC without having the personnel qualifications of the NDE examiner on file.
b.
Unresolved Item None.
F.
Manufacturing Process Control 1.
Objectives The objectives of this area of the inspection were to verify that UPC had implemented the requirements for the control of manufac-turing processes in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objectives were accomplished by:
a.
Review of QA Manual Section 12, "In-Process Control", Revision O.
b.
Review of procedure INSP-3601-0, " Visual Inspection of Welds",
dated April 22, 1976.
22l 055
7 Review Process Routings for the following jobs: Fluid Cylinder, c.
P/N 300 E 0625602, Shop Order N 753719D; Base with Pedestals, P/N 838 D 02452, for Pump S/N A201; and Base with Padestals, P/N 838 D 02452, for Pump S/N A202.
d.
Ascertaining the specified procedures as noted by the Process Routings were included in the traveler package and were available for the operator's use.
Verifying evidence of review by Qaality Control and the t.uthorized e.
Naclear Inspector.
f.
Discussions with cognizant perscanel.
3.
Findings a.
Deviation from Commitment (See Notice of Deviation, Item B.2.)
In addition to the noted deviation, it was further ascertained through discussion with the Inspection Supervisor, that visual inspection reports have not been used r ince implementation of the procedure, which is dated April 22 1976.
=. -
b.
Unresolved Item None
(
G.
Quality Assurance Records 1.
Objectives The objectives of this area cf the inspection were to verify that UPC had implemented the requirements for the control and maintenance of QA Records in accordance with the QA Manual and applicable NRC and ASMI Code requirements.
2.
Method of Acccmplishment The preceding objectives were accomplished by:
Review of QA Manual Section 19, " Quality Assurance Records",
a.
Revision O.
b.
Review of the following, completed pump records: Hydrazene Metering Pumps, S/Ns N770777 F511 and D507; Control Rod Drivewater Pump, S/N N770140 A311, and Reactor Water Cleanup Recirculating Pump, S/N N753764 D207.
Review of Final Records Package Index for the above pumps.
c.
22!
Obb
8 d.
Review of ASME Code Data Reports and Certified Material Test Reports for the above Pumps.
Review of process routings and required NDE Reports for the e.
above pumps.
f.
Discussion with cognizant personnel.
3.
Findings a.
Deviation frem C'ommitment None.
b.
Unresolved Item None.
H.
Exit Interview A meeting was held at the conclusion of this inspection on July 13, 1979, with the following management representatives and the Authorized Nuclear
. Inspector (ANI):
M. Anderson, QA-Engineer J. R. Berry, Assistant Nuclear Sales Manager E. Bolz, General Foreman P. Conlague, Supervisor
'\\
R. J. Craig, ANI, Hartford Steam Boiler Inspection and Insurance Company G. DeSantis, National Sales Manager T. Gossard, Assistant Manager, Production Control H. Graglia, Engineering Manager, Reciprocating Pumps R. Hammond, Nuclear Sales G. Ivorson, Superintendent, Machining Operations J. G. Johnson, Manager, Purchasing T. J. Joy, Project Engineer, Reciprocating Pumps R. Kautmann, Secretary, Quality Control G. Law, Nuclear Sales D. C. McHolme, Assistant to the President and Quality Assurance Manager M. Shook, Production Control E. R. Tuit, Vice President and Treasurer D. Webster, Manufacturing Process Engineer W. Winslow, Manager, Manufacturing D. Wright, Manufacturing Process Engineer 4
Additional attendees are denoted by an asterisk in paragraph A.
The scope and findings of this inspection were summarized. Manacement acknowledged the statements relative to the findings.
I22l 05/
..