I "iSMUD

/

SACRAMENTO MUNICIPAL UTIL'TY DISTRICT O 6201 S Street, Box 15830, Sacrpmento. California 95813; (916) 452-3211 Octooer 16, 1979 Director of Nuclear Reactor Regulation ATTN: Darrell G. Eisenhut Acting Director for Operating Reactors Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 RE: Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1 D. G. Eisenhut letter to All Pressurized Water Reactors dated September 21, 1979

Dear Mr. Eienhut:

Your letter dated September 21, 1979, requested a review of unnecessary challenges to the reactor trip and safeguards systems at our facility. This request was preceded by a letter from you concerning the same subject, dated June 26, 1979. The Sacramento Municipal Utility District responded to the first letter on September 28, 1979. A copy of that response is attact.ed.

If you have any questions regarding this matter, please contact Mr. Ron Colombo at the Rancho Seco Station.

Respectfully,

0. ! LGCa J. J. Mattimoe Assistant Gene ml Manager and Chief Engineer JJM:RJR:RWC:sik Attachment

(

s 1221 084 7910290 26 h c.

..w 4... -

m

,.c

,,~

f OY?

s v... a v-

  • ppAC4f 3 MUNICIPAL UTILITY DISTRICT O 6201 3 Street, bs 1M30, Sacra nento. Cahf:rnia 9M13. m() 452.:211 September 28, 1979 Director of Nuclear Reactor Regula: ion

) fff gh (lI(Ill U I$ f)l fI ATT5: Darrell G. Eisenhut Uljit U fl.

Acting Direc:er for Operating Reactors l

Division of Operating Reactors U. S. Nuclear Regula: cry Commission

'iashington, D. C.

20$35 Re: Docket No. 50-312 Rancho Seco Nuclear Generating Station Unit No. 1 D. C. Eisenhut letter to All Pressurized l

Water React 9rs dated June 26, 1979

Dear Sir:

Your letter dated June 26, 1979, requested a review of unnecessary challences to the reactor trio and safecuards syste=s at our facility.

The Sacramento Municipal Utility District is hereby submitting the requested respense.

A review of our plant operation history indicates that aute=atic safety injection system actuations have not been a cotron occurrence at our facility. With a few notable excepticas (reference LER 78-01 and LER-79-01)

'the majority of reactor trip cha]}enge-were not acco=panied by automatic safety injectien system challenges.

Inadvertent reactor trips were encountered core frequenti:. during the early phases of operatien. Approxicately 50T; of all reactor trips occurred during cur first la conths of operation (October,1974 through December, 1975).

Upgrading and.wdifying specific systems have aided in tininizing inadver:ent reactor trips.

The sane review indicated that there was no indication that a subst:ntial r.unber of the trips ere caused by surveillance testin;.

Some of the trips occurred during ini:ial syste= testing (T?'s) and seme la:er ones occurred during the performance of Special Test Procedures (ST7's).

However, trips which occurred due to ecuipment talfunction er o:hcr operatienal events (naintenance activities, d? sign changes, etc.) constitute a gr2ater percentage of the total number of trips than these as a direct result of testing.

The District does not cencur that there is an apparen: sense of conplacency toward surveillance require ents which have tne,.ctential of causing inadvertent reactor SCRAMS at the Ranche Seco facility.

Follouing all reactor trips, plant personnel investigate and analyze the trip and prerare a repert. This report is then reviewed bv the Plan: ?.c'. lev Ce==i t t e e.

Major parancters at.d systen(s) respcases du.ing the transient are reviewed.

Rece ten-daticas crucerning petcntial design or precedure changes to prevent tecurrence are often discua8ed in these reperts.

[

],,L/

71Lf6MO AN ELEtiRIC $Y:T E Y S E R VIN C MORE THAN 6Ct.330 IE THE HEAnT OF tAttF0R\\It

\\

Hr. Darrell C. Eisenhut Page 2 September 2S, 1979 It is the District's contention that the facility's st5ff analysis of each reactor trip is sufficient to detect any procedural inadequacies which have the parential of i= posing unnecessary challenges to the reactor trip and safe-guards system.

To assure review by plant supervisors, a copy of your letter and this response vill be routed to the appropriate group supervisors at our facility.

Respectfully, J. J. Mattizoe Assistant General Manager' and Chief Engineer JJM:IIH:j i=

cc: Pcgion V, USNEC k Ok[$/l 1221 086 f

~

.