- ML20212E702 + (11:25:22, 4 December 2024)
- 05000334/LER-1997-032, :on 970927,automatic Start of EDG Occurred During Bus Transfer from Unit to Sys Station Transformer. Caused by Conservative Setpoints for Starting EDGs at Unit 1.Restored CR Ventilation + (11:25:24, 4 December 2024)
- ML20212E697 + (11:25:25, 4 December 2024)
- IR 05000313/1986032 + (11:25:29, 4 December 2024)
- ML20212E693 + (11:25:30, 4 December 2024)
- ML20212E695 + (11:25:30, 4 December 2024)
- ML20212E691 + (11:25:31, 4 December 2024)
- ML20212E692 + (11:25:31, 4 December 2024)
- PNO-III-86-155, on 861223,US Court of Appeals,Sixth Circuit, Cincinnati,Oh,Lifted Stay Which Restricted Operation of Plant to 5 Percent Power.Licensee Plans to Start Plant Up During Weekend of 861227 & Resume Power Ascension Testing + (11:25:32, 4 December 2024)
- IR 05000346/1986033 + (11:25:33, 4 December 2024)
- ML20212E688 + (11:25:33, 4 December 2024)
- PNO-II-86-008, on 860123,declared Unusual Event & Began Controlled Shutdown of Plant,Unit 2,due to Computer Calculation of Reactor Coolant Sys Identification Leak 1.5 Gpm + (11:25:34, 4 December 2024)
- PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded + (11:25:35, 4 December 2024)
- ML20212E683 + (11:25:35, 4 December 2024)
- ML20212E678 + (11:25:36, 4 December 2024)
- ML20212E676 + (11:25:37, 4 December 2024)
- ML20212E677 + (11:25:37, 4 December 2024)
- ML20212E675 + (11:25:38, 4 December 2024)
- ML20212E674 + (11:25:38, 4 December 2024)
- ML20212E673 + (11:25:39, 4 December 2024)
- PNO-II-86-020, on 851031,bushings Were Installed During Outage Following Engine Failure in Diesel Generator of Plant Unit 2 + (11:25:39, 4 December 2024)
- U-600676, Requests Relief from Requirements of Reg Guide 1.97,Rev 3 Re post-accident Sampling Sys Capability to Sample Containment & Drywell Equipment/Floor Drain Sumps.Description & Justification Encl.Fsar Will Be Revised + (11:25:40, 4 December 2024)
- PNO-III-86-116, on 861015,while Operating at 95 Percent Power,Licensee Declared Unusual Event After Both Trains of Control Room Ventilation Sys Rendered Inoperable.Caused by Test Procedures Failed to Require Control Valve Be Reset + (11:25:41, 4 December 2024)
- PY-CEI-NRR-0599, Forwards Fee for Processing 870220 Emergency Tech Spec Change Request + (11:25:41, 4 December 2024)
- 05000414/LER-1987-001-04, :on 870126,two Ice Condenser Intermediate Deck Doors Exceeded Opening Force Requirements on 861118.Caused by Personnel Error.Personnel Counseled on Need to Follow Procedures + (11:25:44, 4 December 2024)
- ML20212E666 + (11:25:44, 4 December 2024)
- ML20212E662 + (11:25:45, 4 December 2024)
- ML20212E665 + (11:25:45, 4 December 2024)
- ML20212E660 + (11:25:46, 4 December 2024)
- PNO-III-86-117, on 861017,operating License Issued to Commonwealth Edison Co for Braidwood Nuclear Power Station, Unit 1.License Limited to Fuel Loading & Initial Testing Activities Leading to Criticality + (11:25:47, 4 December 2024)
- ML20212E658 + (11:25:47, 4 December 2024)
- ML20212E656 + (11:25:48, 4 December 2024)
- PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams + (11:25:51, 4 December 2024)
- TXX-6188, Interim Deficiency Rept CP-86-73 Re Installation of ASME Snubber Attachment Brackets.Initially Reported on 861020. Nine Supports Remain to Be Checked to Determine Adequacy of Swing Clearances.Next Rept Will Be Submitted by 870306 + (11:25:51, 4 December 2024)
- ML20212E650 + (11:25:52, 4 December 2024)
- ML20212E649 + (11:25:53, 4 December 2024)
- ML20212E647 + (11:25:54, 4 December 2024)
- ML20212E645 + (11:25:55, 4 December 2024)
- ML20212E643 + (11:25:56, 4 December 2024)
- RC-97-0218, Forwards Response to 970507 RAI Re fifteen-yr Tendon Surveillance Rept.Reactor Bldg post-tensioned Tendon Surveillance Records & Elongation/Tendon Force Comparison Data,Shown in Encl Table + (11:25:56, 4 December 2024)
- ML20212E641 + (11:25:57, 4 December 2024)
- ML20212E639 + (11:25:58, 4 December 2024)
- ML20212E640 + (11:25:58, 4 December 2024)
- ML20212E638 + (11:25:59, 4 December 2024)
- ML20212E634 + (11:26:00, 4 December 2024)
- 1CAN128612, Responds to Notice of Violation & Imposition of Civil Penalty,Part Ii,From Insp Rept 50-313/86-01 During Jan 1986. Response to Part I Contained in .Reconsideration of Violation a Requested.Corrective Actions Discussed + (11:26:01, 4 December 2024)
- ML20212E632 + (11:26:01, 4 December 2024)
- ML20212E626 + (11:26:04, 4 December 2024)
- ML20212E624 + (11:26:05, 4 December 2024)
- 05000414/LER-1986-052-01, :on 861122,main Feedwater Pump Turbine Trip Occurred During Attempt to Start Turbine 2A After 861120 Reactor Trip.Cause Not Determined.Valves Affected by Main Feedwater Isolation Signal Realigned + (11:26:06, 4 December 2024)
- ML20212E621 + (11:26:12, 4 December 2024)
- ML20212E619 + (11:26:33, 4 December 2024)