Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213E516 + (08:21:54, 4 December 2024)
- ML20213E514 + (08:21:55, 4 December 2024)
- ML20213E515 + (08:21:55, 4 December 2024)
- ML20213E513 + (08:21:56, 4 December 2024)
- ML20213E512 + (08:21:58, 4 December 2024)
- ML20213E510 + (08:21:58, 4 December 2024)
- ML20213E508 + (08:22:00, 4 December 2024)
- ML20213E506 + (08:22:00, 4 December 2024)
- ML20213E503 + (08:22:02, 4 December 2024)
- ML20213E504 + (08:22:02, 4 December 2024)
- ML20213E501 + (08:22:03, 4 December 2024)
- ML20213E500 + (08:22:04, 4 December 2024)
- 05000364/LER-1986-011-01, :on 861015,Tech Spec 3.0.3 Entered Due to Inoperability of Both Trains of Control Room Emergency Air Cleanup Sys.Caused by Inadequate Draining of Train B Svc Water Sys.Train a Sys Returned to Svc + (08:22:06, 4 December 2024)
- ML20213E497 + (08:22:06, 4 December 2024)
- ML20213E495 + (08:22:07, 4 December 2024)
- TXX-6071, Suppls 861009 Response to Violations Noted in Insp Repts 50-445/86-06 & 50-446/86-04.Date of Full Compliance for Item a Will Be Provided by 870601 + (08:22:07, 4 December 2024)
- ML20213E491 + (08:22:08, 4 December 2024)
- ML20213E490 + (08:22:09, 4 December 2024)
- ML20213E489 + (08:22:11, 4 December 2024)
- ML20213E486 + (08:22:11, 4 December 2024)
- ML20213E484 + (08:22:12, 4 December 2024)
- ML20213E485 + (08:22:12, 4 December 2024)
- ML20213E482 + (08:22:13, 4 December 2024)
- ML20213E479 + (08:22:14, 4 December 2024)
- ML20213E477 + (08:22:15, 4 December 2024)
- ML20213E476 + (08:22:16, 4 December 2024)
- ML20213E474 + (08:22:17, 4 December 2024)
- 05000348/LER-1986-019, :on 861028,six Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Cause Not Stated.Two Tubes Plugged in Steam Generator 1C & Four Tubes Plugged in Steam Generator 1A + (08:22:18, 4 December 2024)
- ML20213E471 + (08:22:19, 4 December 2024)
- ML20213E470 + (08:22:20, 4 December 2024)
- ML20213E467 + (08:22:21, 4 December 2024)
- ML20213E466 + (08:22:21, 4 December 2024)
- ML20213E463 + (08:22:22, 4 December 2024)
- ML20213E461 + (08:22:23, 4 December 2024)
- ML20213E462 + (08:22:23, 4 December 2024)
- ML20213E459 + (08:22:24, 4 December 2024)
- ML20213E460 + (08:22:24, 4 December 2024)
- ML20213E456 + (08:22:25, 4 December 2024)
- IR 05000373/1986038 + (08:22:27, 4 December 2024)
- ML20213E452 + (08:22:28, 4 December 2024)
- 05000368/LER-1986-011, :on 860924,reactor Tripped Form 100% Power on High Reactor Coolant Sys Pressure Following Main Turbine Trip.Incorrectly Assembled Valve Believed to Be Contributing Factor.Valve Reassembled Properly + (08:22:29, 4 December 2024)
- ML20213E449 + (08:22:30, 4 December 2024)
- ML20213E447 + (08:22:31, 4 December 2024)
- ML20213E445 + (08:22:32, 4 December 2024)
- ML20213E444 + (08:22:33, 4 December 2024)
- ML20213E442 + (08:22:34, 4 December 2024)
- ML20213E437 + (08:22:34, 4 December 2024)
- ML20213E436 + (08:22:35, 4 December 2024)
- ML20213E433 + (08:22:36, 4 December 2024)
- ML20213E423 + (08:22:37, 4 December 2024)
- ML20213E422 + (08:22:38, 4 December 2024)