ML20213E513

From kanterella
Jump to navigation Jump to search
Advises That Adequate Justification Provided by Applicant to Warrant Interim Operation of Plant for First Cycle W/ Certain safety-related Electrical Equipment Pending Full Environ Qualification
ML20213E513
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/05/1983
From: Houston R
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
References
CON-WNP-0626, CON-WNP-626 NUDOCS 8308100503
Download: ML20213E513 (1)


Text

.L ~L' AUG 05 883 9/

\\\\

S*IMDRANCU.'4 FOR :

James P. Knignt, Arsistant Director for Components & Structures Engineering, DE FROM:

R. W. Houston, Assistant Director for Reactor Safety, DSI 5UBJECT:

JU5TIFICATION FOR I"TERIM OPERATION OF WNP-2 In your memorandum of July 29, 1983, you requested our review of the applicant's justification for interim operation of UCP-2 for the first cycle, with certain safety-related electrical equipment that have not been fully qualified for the environment created by accidents.

We have reviewed the justification provided by the applicant for those items of equipment that fall within the CSS review responsibility, i.e.,

their failure can affect integrity of the containment (all but items

  • 1-5, 13-lo, 15-19).

We conclude that adequate justification has been orovided by the applicant to warrant interim operation of the plant.

However, the plant's operating procedures should explicitly' identify the actions specified in this justification to assure that in the unlikely event of an accident, the appropriate steps will be taken. These actions are:

1) initiate operation of the H2 recombiner 2.75 hrs following the onset of a LOCA; 2) verify that the reactor building air isolation valve is isolated before 7 minutes from onset of the LOCA; and 3) verify that valves EDR-V-20 and FDR-V-4 have been closed prior to 12 minutes from on-set of the LOCA.

Original Signed By R. Wayne,Hcuston R. W. Houston, Assistant Director for Reactor Safety Division of Systems Integration cc:

R. Mattson dist ribution

~

D. Eisenhut central file A. Schwencer csb rdg file R. Auluck rs ad rdg file wbutler A. Masc 1 antonio jkudrick feltawila

Contact:

F. Eltawila, CSS:DSI, 29488 308100503 830805 3F ADOCK 05000397 ~

W

-m 0 FFICE ).......@.!...

y.. '

.@..I..k....

...... h. h.h..O,,,........h.

sucume >...f.EL.t. alit.i.L.a :nm....LK.udr.it k.....WB.u1.Ler.

........R H u s.t.l en....................

........................