ML20213E467

From kanterella
Jump to navigation Jump to search
Forwards Core Performance Branch Comments Re Proof & Review Tech Specs.Symbol Q in Formula for Scram Trip Setpoint Appears to Be Superfluous
ML20213E467
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/19/1983
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Thomas C
Office of Nuclear Reactor Regulation
References
CON-WNP-0601, CON-WNP-601 NUDOCS 8307270431
Download: ML20213E467 (3)


Text

-

N.

JUL 19 E f:E 'OPA" dix 1 FOR:

Cecil G. Thonas, Chief Standardization and Special Projects I. ranch, CL FP9!!:

Carl H. Berlinner, Chief Core Perfomance I! ranch, DSI

SUBJECT:

TECHL!ICAL SPECIFICATI0f!S FOR UrlP2 The Core Perfomance " ranch has reviewed the proof and review cony of Technical Srecifications for '!ashington f'uclear Pro.fect-Unit 2.

Fnclosure 1 is a list nf the specifications reviewed and Enclosure 2 contains our coments.

Other specifications are accentable, as written.

?I!N 2.

P 1 '"T

  • yG Carl u. lierlinger, Chief Core Perfornance Cranch, DSI

Enclosures:

As stated cc:

R. l'attson L. Putenstain D. Eisenhut T. flovat D. Hoffman R. Capra l

Contact:

P. Brool:s, CPD:DSI S. Sun, CPB:DSI X-29490 X-29499 CPB:rf C. BERLINGER D. FIEN0 L. PHILLIPS l

W. BROOKS I/)

i S.

1 8307270431 830719

~b77'

.AD.QCK 0500Qg7

=-

k /P n /I D BR00K :

... 5.5.L.

...T.P.RES.I.2C.

OFFICE)U

......T s DFIEN0 SSUN;........... '....... ~....

LPHILLIPS

.C..B. E..RL I N. G..E.R.....

SURNAME [7/ //...............

....../..... /8 3.........$............

/83 7/

7/

../../...../. 8 3

.. 7../....P.i../. 8. 3...

...../..,/.../ 8 3 7

~

me,

-mawuameswwt

4 Specifications Reviewed Definitions:

1.2, 1.3, 1.8, 1.13, 1.14, 1.19, 1.20, 1.22, 1.25, 1.29, 1.34 1.37, 1.39, 1.44, and 1. 45.

Specifications:

2.1.1 2.1.2 2.2.1 (IRM and APRM only) 3/4.1.1 3/4.1.2 3/4.1.3.1 3/4.1.3.2 3/4.1.3.3 3/4.1.3.4 3/4.1.3.5 3/4.1.3.6 3/4.1.3.7 3/4.1.3.8 3/4.1.4.1 3/4.1.4.2 3/4.1.4.3 3/4.1.5 3/4.2.2 3/4.2.3 3/4.2.4 3/4.3.1 (IRM and APRM only) 3/4.3.6 3/4.3.7.6 3/4.3.7.7 3/4.3.7.12 3/4.4.1.1 3/4.9.1 3/4.9.2 3/4.9.3 3/4.9.10.1 3/4.9.10.2 3/4.10.1

~

1 3/4.10.2 3/4.10.3 i

Comments On Specifications 1.

Bases for 2.2.1.2 (last sentence)

MFLP0 should be MFLPD.

2.

Specification 3/4.2.2 The symbol Q in the formula for the scram trip setpoint appears to be superfluous.

3.

Specification 3/4.2.3 The term MCPR is undefined (perhaps MCPRxK ).

f f

There is a discrepancy between Figure 3.2.3-1 and the Bases with respect to the assumed operating limit MCPR (1.24 on the figure and 1.20 in the Bases).

4.

Table 3.3.6-1 There appears to be a gap of 10 percent in power between the required operation of the RSCS (20 percent) and the RBM (30%).

Is this intended to account for uncertainties to prevent simultaneous operation of both?

The gap is technically acceptable.

5.

General There is a discrepancy in the page numbers in the index beginning at page 3/4.3-10.

l l

\\

l t

i

.