ML20213E452
| ML20213E452 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/01/1983 |
| From: | Thomas C Office of Nuclear Reactor Regulation |
| To: | Ippolito T, Liaw B, Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0595, CON-WNP-595 NUDOCS 8307150031 | |
| Download: ML20213E452 (2) | |
Text
..
s a
r Jut. 01 1963 oEl;0RANDutt FOR:
Those on Attached List FR0:1 Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing SUBJECT.
PROOF AND REVIEW 0F WASHINGTON :4UCLEAR - UNIT 2 TECHNICAL SPECIFICATIONS Attached please find the Appendix A Technical Specifications for Washington nuclear Unit 2 for proof and review. We request that you review those sections of the attached Tecnnical Specifications which pertain to your particular area of responsibility and that the results of this review, identitying those sections of the Technical Specifications reviewed, be forwarced to the Standardization and Special Projects Branch oy July 29, 1963.
!Ir. Donalo R. Hoffman of my staff will b'e available curing the proof anc review period to answer any questions your staff may have.
If you have corrents or suggestions, or if you are in agreenenc wit.h the Technical Specifications content in your area of review, it is requested that a written response to that effect identifying those sections of tne Technical Specifications reviewed be provided oy the aoove specifica cate.
/
b
\\'i Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing
Attachment:
Washington nuclear-Unit 2 Technical Specifications cc w/o attachment:
D. Eisenhut F. Iliraglia 1
r DISTRIBUTION:'d E W 0 t
Centr &141le-Q.r el
-L. \\ <!
SSPB R/F
~
~ ~ -
DHnffmmn
/A 8307150031 830701 A
GP ADOCK 05000397 sP s.S.$aryl.... SSpBg:.
- o c mC.,
suzuce > 3Hoffman;.kab..QBd.
Glas.....
-. ~.. ~. -.. ~.
~. - -.. - -.. -
- 7. /../....../.8 3..........
7../../..../. 8. 3.........
.. 7../.. t..../. 8. 3......
o->
~............ -.. -.
IAO FCRM 31S (13-80) NRCM C240 OFF1CIAL RECORD COPY vm im-mm
eroof & Review Districution f
for Washington Nuclear Unit 2 Date: July 1, 1983 ATTACHED LIST Albert Schwencer, Chief Olan D. Parr, Chief Licensing Branch No.
, DL Auxiliary Systems Branch, DSI Thomas A. Ippolito, Chief William P. Gammill, Chief Operating Reactors Assessment Meteorology & Effluent Branch, DL Treatment Branch, DSI Lewis G. Hulman, Chief B. D. Liaw, Chief
. Accident Evaluation Branch, DSI Mater.ials Engineering Branch, DE Frank Congel, Chief Victor Benaroya, Chief Radiological Assessment Branch, DSI Chemical Engineering Branch, DE Vincent Noonan, Chief Voss A. Moore, J r., Chief Equipment Qualification Branch, DE Human Factors Engineering Branch, DHFS Robert J. Bosnak, Chief Harold R. Bocher, Chief Mechanical Engineering Branch, DE Licensee Qualification Branch, DHFS Robert E. Jackson, Chief H. Brent Clayton, Acting Chief Geosciences Branch, DE Procedures & Systems Review Branch, DHFS George Lear, Chief Structural & Geotechnical Regional Administrator Engineering Branch, DE Region V Ronald L. Ballard, Chief Richard Feil Environmental & Hydrologic Senior Resident Inspector Engineering Branch, DE Washington Nuclear Unit 2 Site
, William H. Regan, Chief -
Cecil 0. Thomas, Chief Site Analysis Branch, DE Standardization & Special Projects Branch, DL Brian W. Sheron, Chief Donald S. Brinkman, Section Leader Reactor Systems Branch, DSI STS Section Standardization & Special Faust Rosa, Chief Projects Branch, DL Instrumentation & Control Systems Branch, DSI Chief Quality Assurance Branch, I&E Walter R. Butler, Chief Containment Systems Branch, DSI Rajender Auluck, Project Manager M. I. Srinivasan, Chief Licensing Branch No. 2, DL Power Systems Branch, DSI Carl Berlinger, Chief Applicant: (3)
Core Performance Branch, DSI Mike Wuesterfeld 271 Adair Road Richland, Washington 99352
\\
/
~
DISTRIBUTION:
1 1 1983 See attached page
~
Docket flo. 50-397 MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:
R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing
SUBJECT:
FORTHCOMING MEETING UITH WASHINGTON PU3LIC POWER SUPPLY SYSTEM (WPPSS)
DATE & TIME:
Friday, July 15, 1983 9:00 AM LOCATION:
Room P-422 Phillips Building Bethesda, MD PURPOSE:
Discussion on containment out-of-roundness PARTICIPANTS *:
NRC WPPSS D. Jeng WPPSS Staff R. Auluck K. C. Leu
.N,zind :V: :::,'
R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page
- Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting and Statement of HRC Staff Policy", 43 Federal Register 28058, 6/28/73.
GefMMSO459 830711 PDR ADOCK 05000397 q((7' A
\\
,i a)
.D..L.'.\\ h.#2 /..PM....
..DL..:..L..B #.;2/..B C L
omce>
su N.WE).bbNlN
.hN.... A bN00SEI...
- ~ " " ~ " *
...!D..L8 3........?!.Q 8 3.....
om>
. -.... ~ -. -. -.
ERC FCRM 315 ('0-40) NPOM 0:4o L
OFFICIAL RECORD COPY ossa. im-wan
JUL 11 1983, MEETING NOTICE DISTRIBUTION:
Date:
D dL _ S;5&t- % "i 7
- hRC PDR
~ ~ ~ ' ~ ~
L PDR NSIC PRC LBf2 Reading NRC PARTICIPANTS:
E. Hylton Project Manager R. Auluck D. Jeng H. Denton/E. Case R. Auluck D. Eisenhut/R. Purple K. C. Leu T. M. Novak*
B. Youngblood A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J. P. Knight W. Johnston D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst J. Krar.er NRP Division Directors
- OEL3 Attorney B. Paton E. _. Jordan. DE0A:IE J. M. Taylcr, DRP:IE Phillips Butiding Receptionist **
ACRS (16)
Region V
Resident Inspector cc: Service List
- 0nly if participant in meeting
- 0nly if meeting held in Bethesda e
WNP-2 Mr. R. L. Ferguson Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:
Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, N. W.
Washington, D. C.
20036 4
Mr. G. E. Daupe, Esquire Washington Public Power Supply System P.O. Box 968 3000' George Washington Way Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W. G. Conn, Sr. N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington.99352 Mr. Richard Feil U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety & Regulatory Programs Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352 e
.