Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214V421 + (05:07:06, 4 December 2024)
- ML20214V420 + (05:07:07, 4 December 2024)
- ML20214V415 + (05:07:08, 4 December 2024)
- ML20214V418 + (05:07:08, 4 December 2024)
- ML20214V410 + (05:07:09, 4 December 2024)
- 3F1186-24, Responds to Violation Noted in Insp Rept 50-302/86-31. Corrective Actions:Valve Positions Verified & Surveillance Procedure SP-344C Revised to Include Signoffs to Ensure Independent Verification Performed + (05:07:10, 4 December 2024)
- ML20214V405 + (05:07:17, 4 December 2024)
- ML20214V404 + (05:07:18, 4 December 2024)
- B12286, Forwards Updated FSAR for Millstone Nuclear Power Station Unit 3 + (05:07:19, 4 December 2024)
- ML20214V401 + (05:07:19, 4 December 2024)
- ML20214V398 + (05:07:25, 4 December 2024)
- ML20214V396 + (05:07:26, 4 December 2024)
- ML20214V386 + (05:07:33, 4 December 2024)
- ML20214V385 + (05:07:34, 4 December 2024)
- ML20214V383 + (05:07:40, 4 December 2024)
- ML20214V379 + (05:07:52, 4 December 2024)
- ML20214V380 + (05:07:52, 4 December 2024)
- ML20214V378 + (05:07:53, 4 December 2024)
- ML20214V377 + (05:07:54, 4 December 2024)
- ST-HL-AE-2198, Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept + (05:07:55, 4 December 2024)
- ML20214V373 + (05:08:01, 4 December 2024)
- ML20214V374 + (05:08:01, 4 December 2024)
- ML20214V371 + (05:08:06, 4 December 2024)
- ML20214V369 + (05:08:07, 4 December 2024)
- ML20214V367 + (05:08:08, 4 December 2024)
- ML20214V362 + (05:08:08, 4 December 2024)
- ML20214V357 + (05:08:28, 4 December 2024)
- ML20214V358 + (05:08:28, 4 December 2024)
- ML20214V354 + (05:08:29, 4 December 2024)
- ML20214V355 + (05:08:29, 4 December 2024)
- ML20214V351 + (05:08:30, 4 December 2024)
- ML20214V350 + (05:08:31, 4 December 2024)
- ML20214V349 + (05:08:32, 4 December 2024)
- 05000348/LER-1986-021, :on 861105,containment Equipment Hatch Left as Nonfunctional Fire Barrier Longer than seven-day Period. Continuous Fire Watch Established.Hatch Closed on 861108.W/ + (05:08:34, 4 December 2024)
- IR 05000302/1986023 + (05:08:46, 4 December 2024)
- ML20214V344 + (05:08:47, 4 December 2024)
- IR 05000353/1987005 + (05:08:48, 4 December 2024)
- ML20214V340 + (05:08:49, 4 December 2024)
- IR 05000443/1987010 + (05:09:26, 4 December 2024)
- ML20214V335 + (05:09:26, 4 December 2024)
- ML20214V332 + (05:09:27, 4 December 2024)
- ML20214V327 + (05:09:34, 4 December 2024)
- ML20214V328 + (05:09:34, 4 December 2024)
- 3F1286-05, Forwards SAIC-86/1098, Crystal River Unit 3 Emergency Feedwater Sys Reliability Analysis. Study Incorporates All Recent Improvements to Sys.Sys Believed Highly Reliable & Adequate in Fulfilling Role in Accident Mitigation + (05:09:35, 4 December 2024)
- FVY-86-111, Forwards Rev 1 to Physical Security Plan for Approval. Changes Resulted from Regulatory Effectiveness Review Team 1985 Assessment & Insp Rept 50-271/86-06.Rev Withheld (Ref 10CFR73.21) + (05:09:41, 4 December 2024)
- ML20214V323 + (05:09:43, 4 December 2024)
- ML20214V322 + (05:09:43, 4 December 2024)
- B12483, Forwards Rev 2 to Fire Hazards Analysis,Millstone Unit 2, Including Updates to Analysis Through Dec 1986 + (05:09:44, 4 December 2024)
- IR 05000010/1986007 + (05:09:44, 4 December 2024)
- ML20214V317 + (05:09:45, 4 December 2024)
- ML20214V316 + (05:09:45, 4 December 2024)
- ML20214V311 + (05:09:52, 4 December 2024)