Text
.
4
DEC 0 41986
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. J. A. Tiernan
Vice President
Nuclear Energy
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Combined Inspection Nos. 50-317/86-14 and 50-318/86-14
This refers to the routine safety inspection of your annual emergency pre-
',
paredness exercise and remedial drill conducted by Mr. J. Hawxhurst of this
office and other NRC and NRC contractor personnel on September 8-10, 1986 and
October 14-17, 1986, respectively, at the Calvert Cliffs Nuclear Power Plant
and to the discussions of our findings with you and your staff at the conclu-
sion of the inspection.
Areas examined during this inspection included followup of findings identified
during previous emergency preparedness inspections, your September 1986 emer-
gency exercise and October 1986 remedial drill.
Findings are documented in the
NRC Region I Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations made by
the emergency exercise team members.
As previously discussed with you and noted in our Confirmatory Action Letter
dated October 1, 1986, we have a concern regarding deficiencies
in your performance which resulted in protective action recommendations which
were inappropriate. The factors contributing to this are identified in the
enclosed inspection report. The Confirmatory Action Letter detailed your
proposed corrective actions including a remedial drill to demonstrate
acceptable performance. The subsequent remedial drill held October 16, 1986
demonstrated acceptable performance in the deficient areas.
0FFICIAL RECORD COPY
/
~
8612070675 861204
ADOCK 05000317
s
G
g
_ -
.
d-
Baltimore Gas and Electric Company
2
No reply to this letter is required.
Your cooperation with us in this matter-
is appreciated.
Sincerely.
Oriciani Sip;d B- -
-
S
p homas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Combined Inspection Report 50-317/86-14 and 50-318/86-14
cc w/ encl:
M. Bowman, General Supervisor, Technical Services Engineering
Thomas Magette, Administrator, Nuclear Evaluations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
FEMA RIII
bec w/ encl:
Region I Docket Room (with concurrences)
ManagementAssistant,DRMA(w/oenc1)
DRP Section Chief
M. McBride, RI, Pilgrim
T. Kenny, SRI, Salem
S. t1cNeil, LPM, NRR
Robert J. Bores, DRSS
RI:DRS
RI:DR
RI:DRSS
Hawxhu s /rw
Lazarus
Bellamy
12/4)/86
12/ /86
12/'5 /86
.__ _
.
. - .
_-
-
-
.
__
--
- -
_ _ .