Forwards Safety Insp Repts 50-317/86-14 & 50-318/86-14 on 860908-10 & 1014-17.Remedial Drill on 861016 Demonstrated Acceptable Performance in Deficient Areas,Per 861001 Confirmatory Action Ltr
ML20214V410
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/04/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20214V414 List:
References
NUDOCS 8612090675
Download: ML20214V410 (2)


See also: IR 05000317/1986014

Text

.

4

DEC 0 41986

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. J. A. Tiernan

Vice President

Nuclear Energy

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Combined Inspection Nos. 50-317/86-14 and 50-318/86-14

This refers to the routine safety inspection of your annual emergency pre-

',

paredness exercise and remedial drill conducted by Mr. J. Hawxhurst of this

office and other NRC and NRC contractor personnel on September 8-10, 1986 and

October 14-17, 1986, respectively, at the Calvert Cliffs Nuclear Power Plant

and to the discussions of our findings with you and your staff at the conclu-

sion of the inspection.

Areas examined during this inspection included followup of findings identified

during previous emergency preparedness inspections, your September 1986 emer-

gency exercise and October 1986 remedial drill.

Findings are documented in the

NRC Region I Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations made by

the emergency exercise team members.

As previously discussed with you and noted in our Confirmatory Action Letter

dated October 1, 1986, we have a concern regarding deficiencies

in your performance which resulted in protective action recommendations which

were inappropriate. The factors contributing to this are identified in the

enclosed inspection report. The Confirmatory Action Letter detailed your

proposed corrective actions including a remedial drill to demonstrate

acceptable performance. The subsequent remedial drill held October 16, 1986

demonstrated acceptable performance in the deficient areas.

0FFICIAL RECORD COPY

/

~

8612070675 861204

PDR

ADOCK 05000317

s

G

PDR

g

_ -

.

d-

Baltimore Gas and Electric Company

2

No reply to this letter is required.

Your cooperation with us in this matter-

is appreciated.

Sincerely.

Oriciani Sip;d B- -

-

S

p homas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Combined Inspection Report 50-317/86-14 and 50-318/86-14

cc w/ encl:

M. Bowman, General Supervisor, Technical Services Engineering

Thomas Magette, Administrator, Nuclear Evaluations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

FEMA RIII

bec w/ encl:

Region I Docket Room (with concurrences)

ManagementAssistant,DRMA(w/oenc1)

DRP Section Chief

M. McBride, RI, Pilgrim

T. Kenny, SRI, Salem

S. t1cNeil, LPM, NRR

Robert J. Bores, DRSS

RI:DRS

RI:DR

RI:DRSS

Hawxhu s /rw

Lazarus

Bellamy

12/4)/86

12/ /86

12/'5 /86

.__ _

.

. - .

_-

-

-

.

__

--

- -

_ _ .