Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000219/1978029 + (21:20:10, 3 January 2025)
- ML19259A789 + (21:20:13, 3 January 2025)
- ML19259A788 + (21:20:14, 3 January 2025)
- ML19259A787 + (21:20:16, 3 January 2025)
- ML19259A786 + (21:20:17, 3 January 2025)
- ML19259A785 + (21:20:18, 3 January 2025)
- ML19259A783 + (21:20:20, 3 January 2025)
- ML19259A781 + (21:20:21, 3 January 2025)
- ML19259A779 + (21:20:23, 3 January 2025)
- ML19259A778 + (21:20:24, 3 January 2025)
- ML19259A776 + (21:20:26, 3 January 2025)
- ML19259A777 + (21:20:26, 3 January 2025)
- ML19259A775 + (21:20:28, 3 January 2025)
- ML19259A774 + (21:20:29, 3 January 2025)
- ML19259A773 + (21:20:30, 3 January 2025)
- 05000285/LER-1978-045-01, /01T-0 on 781220:during Plant heatup,1 Pressure Channel for Power Operated Relief Valve (PORV) Sys Was Responding.Operator Pulled Recorder Fuses Causing PORV Valves to Open,Then Closed Them to Terminate Transient + (21:21:02, 3 January 2025)
- ML19259A769 + (21:21:05, 3 January 2025)
- 05000285/LER-1978-045, Forwards LER 78-045/01T-0 + (21:21:47, 3 January 2025)
- ML19259A763 + (21:21:51, 3 January 2025)
- ML19259A762 + (21:22:04, 3 January 2025)
- ML19259A760 + (21:22:06, 3 January 2025)
- ML19259A759 + (21:22:09, 3 January 2025)
- 05000317/LER-1978-058-03, /03L-0 on 781218:during Surveillance Testing on No 11 Diesel Generator,Generator Room Ventilation Fan Failed to Start.A B Phase Overload Had Tripped & Was Reset.Tests on Fan Showed Normal Current & No Mechanical Damage + (21:22:24, 3 January 2025)
- 05000366/LER-1978-084-03, /03L-0 on 781213:during Visual Insp of Standby Gas Treatment Sys snubbers,R69 Snubber Found to Be Low on Fluid. Caused by Fluid Leaking Past Refill Plug + (21:22:46, 3 January 2025)
- ML19259A756 + (21:22:48, 3 January 2025)
- 05000317/LER-1978-058, Forwards LER 78-058/03L-0 + (21:22:52, 3 January 2025)
- ML19259A753 + (21:22:55, 3 January 2025)
- 05000366/LER-1978-084, Forwards LER 78-084/03L-0 + (21:22:59, 3 January 2025)
- ML19259A750 + (21:23:02, 3 January 2025)
- ML19259A749 + (21:23:04, 3 January 2025)
- 05000318/LER-1978-042-03, /03L-0 on 781212:number of Operable Charging Pumps Reduced to One Less than Number Required by Tech Specs. Caused by Packings of 2 Charging Pumps Reaching Their Natural End of Life Simultaneously + (21:23:07, 3 January 2025)
- ML19259A747 + (21:23:08, 3 January 2025)
- ML19259A746 + (21:23:16, 3 January 2025)
- 05000318/LER-1978-042, Forwards LER 78-042/03L-0 + (21:23:21, 3 January 2025)
- ML19259A742 + (21:23:24, 3 January 2025)
- ML19259A741 + (21:23:26, 3 January 2025)
- 05000321/LER-1978-097-03, /03L-0 on 781214:during Surveillance Testing HNP-1-3202,core Spray Discharge Line Level Switch E21-N010B Failed to Operate.Caused by Actuating Screw Drifting from Setpoint + (21:23:29, 3 January 2025)
- 05000321/LER-1978-097, Forwards LER 78-097/03L-0 + (21:23:32, 3 January 2025)
- ML19259A735 + (21:23:33, 3 January 2025)
- ML19259A734 + (21:23:34, 3 January 2025)
- 05000277/LER-1978-048-03, /03L-0 on 781204:surveillance Test Revealed Failure of a Channel Main Steam Line High Flow Circuitry in Primary Containment Isolation Signal Logic Used to Provide Group 1 Isolation,Due to Failure of 5A-K30A Relay + (21:23:37, 3 January 2025)
- ML19259A732 + (21:23:38, 3 January 2025)
- ML19259A731 + (21:23:39, 3 January 2025)
- ML19259A730 + (21:23:40, 3 January 2025)
- ML19259A729 + (21:23:42, 3 January 2025)
- ML19259A728 + (21:23:43, 3 January 2025)
- ML19259A727 + (21:23:44, 3 January 2025)
- ML19259A726 + (21:23:45, 3 January 2025)
- ML19259A725 + (21:23:46, 3 January 2025)
- 05000348/LER-1978-090-03, /03L-0 on 781206:while Reviewing FNP-1STP-1.0, Discovered Tech Spec 4.5.2.a.b Requirements Were Not Being met.V8132A&B Were Open as Required But Breakers to Valid Operators Were Not Locked Open,Due to Personnel Error + (21:23:48, 3 January 2025)
- 05000348/LER-1978-089-03, /03L-0 on 781206:while Performing FNP-1-STP-28.2, Diesel Generator 1B Operability Test,Loss of Sys Pressure Sequencer Failed to Pick Up Step 6 (Battery Charger 1B). Exact Cause Was Not Determined + (21:23:57, 3 January 2025)