ML19259A783

From kanterella
Jump to navigation Jump to search
Forwards Proposed Changes to License NPF-2 Tech Specs Re Addition of Overpressurization Mitigating Sys Specifications
ML19259A783
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/04/1979
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19259A784 List:
References
NUDOCS 7901100296
Download: ML19259A783 (1)


Text

ea, c ;, n -

eym ~. <... ' rn

'l gaN an:

- a-i. c.e s

F.L CLAYTON JR.

Alabama power sr o.

ma souwn &x mc sys:em January 4, 1979 Docket Nos. 50-348 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

!!r. A. Schwencer

Dear Mr. Schwencer:

no: Changes to Operating License No. NPF-2 Technical Specifications Alabama Power Company proposes the attached changes to Joseph !!.

Farley ;;uclear Plant Operating License I;o. NPF-2 Technical Specifications involving addition of overpressurization mitigating system specifications.

The Plant Operations Review Committee and the Nuclear Operations Review Board have reviewed the proposed changes and have determined that the changes do not involve an unreviewed safety question as shown in the attached safety evaluation.

The overpressurization mitigating system was required by the NRC in a letter f rom Mr. John F. Stolz to !!r. Alan R. Barton dated December 29,,

1976.

Since this was prior to the Technical Specification change fee re-quirement in 10 CFR 170, no fee should be necessary.

In accordance with 10 CFR 50.30(c)(1)(1), three (3) signed originals and thirty-seven (37) additional copics of these proposed changes are en-closed.

If you have any questions, please advise.

Yours very truly, O

dla

=-

. Clayt

, Jr FLCJr/TNE:bhj SWORN TO AND SUBSCRIBED BEFORE ME TilIS DAY OF JANU!RY, 1979.

cc:

fir. R. A. Thomas

!!r. G. F. Trowbridge

)

. h f0TAPiY PU'BLIC

[/

?!y Commission Expires:

7 9 0110 0 27f3 g