Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19282C611 + (03:28:53, 3 January 2025)
- IR 05000278/1979007 + (03:28:55, 3 January 2025)
- ML19282C609 + (03:28:56, 3 January 2025)
- 05000293/LER-1979-011-03, /03L-0 on 790307:fire Water Shortage Tanks Volume Was Less than 240,000 Gallons in Each Tank.Caused by Failure to Ensure Levels Maintained within Tech Spec Limits. Procedures Revised + (03:28:58, 3 January 2025)
- ML19282C606 + (03:28:59, 3 January 2025)
- 05000293/LER-1979-011, Forwards LER 79-011/03L-0 + (03:29:01, 3 January 2025)
- ML19282C602 + (03:29:03, 3 January 2025)
- ML19282C603 + (03:29:03, 3 January 2025)
- ML19282C601 + (03:29:04, 3 January 2025)
- ML19282C598 + (03:29:06, 3 January 2025)
- ML19282C600 + (03:29:06, 3 January 2025)
- ML19282C597 + (03:29:07, 3 January 2025)
- 05000338/LER-1979-022-03, /03L-0 on 790227:power Supply to Post DBA H Recombiner Deenergized Rendering Recombiner Inoperable for 4-h.Caused by Deenergizing of Motor Control Center to Perform Voltage Measurements + (03:29:08, 3 January 2025)
- ML19282C594 + (03:29:09, 3 January 2025)
- 05000338/LER-1979-028-03, /03L-0 on 790225:greater than 12-step Disagreement Noted Among Rod Position Indication,Computer Position Indication & Demand Signal Indication for Rod 9.Caused by Voltage Drift in Signal Conditioning Card + (03:29:11, 3 January 2025)
- IR 05000334/1979001 + (03:29:13, 3 January 2025)
- ML19282C590 + (03:29:14, 3 January 2025)
- ML19282C589 + (03:29:14, 3 January 2025)
- ML19282C588 + (03:29:15, 3 January 2025)
- ML19282C586 + (03:29:16, 3 January 2025)
- ML19282C585 + (03:29:17, 3 January 2025)
- ML19282C584 + (03:29:18, 3 January 2025)
- ML19282C582 + (03:29:19, 3 January 2025)
- ML19282C581 + (03:29:19, 3 January 2025)
- ML19282C579 + (03:29:20, 3 January 2025)
- EPID:L-2019-TOP-0040 + (03:29:21, 3 January 2025)
- IR 05000277/1979001 + (03:29:22, 3 January 2025)
- ML19282C574 + (03:29:24, 3 January 2025)
- ML19282C573 + (03:29:25, 3 January 2025)
- ML19282C571 + (03:29:28, 3 January 2025)
- ML19282C570 + (03:29:30, 3 January 2025)
- IR 05000344/1979004 + (03:29:31, 3 January 2025)
- ML19282C568 + (03:29:33, 3 January 2025)
- IR 05000245/1979001 + (03:29:34, 3 January 2025)
- ML19282C564 + (03:29:35, 3 January 2025)
- ML19282C563 + (03:29:39, 3 January 2025)
- ML19282C561 + (03:29:42, 3 January 2025)
- ML19282C555 + (03:29:43, 3 January 2025)
- ML19282C557 + (03:29:43, 3 January 2025)
- IR 05000219/1979002 + (03:29:46, 3 January 2025)
- ML19282C549 + (03:29:47, 3 January 2025)
- ML19282C546 + (03:29:48, 3 January 2025)
- IR 05000329/1979001 + (03:29:50, 3 January 2025)
- ML19282C541 + (03:29:51, 3 January 2025)
- ML19282C539 + (03:29:53, 3 January 2025)
- ML19282C536 + (03:29:54, 3 January 2025)
- ML19282C532 + (03:29:56, 3 January 2025)
- ML19282C528 + (03:29:57, 3 January 2025)
- ML19282C525 + (03:29:59, 3 January 2025)
- ML19282C522 + (03:30:01, 3 January 2025)
- 05000321/LER-1979-018-03, /03L-0 on 790310:plant Svc Water Not Valved in to 1B Diesel Generator.Caused by Plant Svc Water Maint Procedure HNP-2-6200 Not Specifying Correct Valve Alignment. Temporary Procedure Change Made + (03:30:03, 3 January 2025)