IR 05000245/1979001
| ML19282C567 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/13/1979 |
| From: | Jerinigan E, Lester Tripp NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19282C558 | List: |
| References | |
| 50-245-79-01, 50-245-79-1, NUDOCS 7903300343 | |
| Download: ML19282C567 (3) | |
Text
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-245/79-01 Docket No. 50-245 License No. DPR-21 Priority Category C
--
Licensee:
Northeast Nuclear Enerav Compan/
P. O. Box 270 Hartford. Connecticut
.
Facility Name:
Millstone Point, Unit No.1 Inspection at:
Waterford, Connecticut Inspection conducted: January 9,1979 Inspectors:
-
.Yhdea_
l e\\,,1S 9 9 E. P. Jsrnigan,sgeactor Inspector date sigr.ed date signed date signed Approved by:
_b".
hO
_... _
N/3 /74 L. E. Tripp, Ch'ief; Engineering Support date' signed
-
Section No. 1, RC&ES Branch Inspection Summary:
Inspection on January 9, 1979 (Report No. 50-245/79-01)
Kreas Inspectg:
Routine, unanniunced inspection by a regional based inspector of the licensee's corrective action associated with the repair of the reactor water clean-up line as reported by the licensee. The inspection-involved 8 inspector-hours by one regional based inspector.
Results:
No items of noncompliance were identified.
.
7903300393 Region I Form 12 (Rev. April 77)
.
DETAILS 1.
Persons Contacted Northeast tar Energy Company
_
- J. Opeka, Station Superintendert
- R. Herbert, Plant Superintendent
- K. Thomas, Engineer General Electric Company I&SE Division R. Wagner, I&SE Quality Assurance Supervisor V. Kenny, Examiner P. Flaherty, Examiner Hartford Steam Boiler Insurance and Inspection Company R. Smith, Authorized Inspector
- denotes those present at the exit meeting.
2.
Review of Nonroutine Event Reported by the Licensee Tne inspector reviewed licensee actions with respect to the below listed Reportable Occurrence (RO).
This review was to verify that the event was reviewed and evaluated by the licensee as required by Technical Specifications.
The inspector examined Operations Comittee minutes, material test reports, nondestructive examination reports, and interviewed selected personnel. The R0 reviewed and the inspection findings were as follows:
R0-79-1/lP: Butt-weld failure in the Reactor Water Cleanup System return line (loop "B").
The licensee's corrective action, delineated in Job Order package No. R-013-79, involves complete removal of the defective weld.
This was acccmplished by cutting through two welds Nos. CUBJ-10 and CUBJ-11 (the failed weld) and removing an 18" long section of pipe.
Preliminary evaluation by the licensee indicates the probable cause of failure to be intergranular stress corrosion cracking.
However, a metallographic analysis will be performed to determine the exact cause of failur.
The inspector audited documentation associated with this repair to verify compliance with procedural / specification requirements.
Based on this audit and discussions with cognizant personnel the inspector determined that repairs were-being made as stipulated in the Job Order package.
The inspector has no further questions regarding this repair at this time.
3.
Exit Meeting The inspector met with licensee representatives (asterisked in Paragraph 1) at the conclusion of the inspectinn on January 9, 1979. The inspector summarized the purpose and scope of the inspection and findings.
.