ML19282C606
| ML19282C606 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/15/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19282C607 | List: |
| References | |
| NUDOCS 7903300380 | |
| Download: ML19282C606 (2) | |
See also: IR 05000278/1979007
Text
p hta
UNITED STATES
y
- g
NUCLEAR REGULATORY COMMISSION
j
j
REGION I
2
631 PARK AVENUE
KING OF PRUS$lA. PENNSYLVANI A 19406
Docket No. 50-278
FEB 15 im
Philadelphia Electric Company
ATTN:
Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection 50-278/79-07
This refers to the inspection conducted by Mr. R. Feil of this office on
January 8-12 and 23-26,1979, at Peach Bottom Atomic Power Station, Unit
3, Delta, Pennsylvania, of activities authorized by NRC License No. DPR-
56 and to the discussions of our findings held by Mr. Feil with Mr. W.
Ullrich of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information souaht to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
790330 0 % 6
.
.
Philadelphia Electric Company
2
No reply to this letter is required; however, should you have any o/ias-
tions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection Report
Number 50-278/79-07
cc w/ encl:
W. T. Ullrich, Station Superintendent
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Warren Rich, Esquire (Without Report)