Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236B665 + (07:58:34, 3 December 2024)
- ML20236B663 + (07:58:35, 3 December 2024)
- ML20236B662 + (07:58:36, 3 December 2024)
- PNO-II-87-072, on 871016,alert Declared When Startup Transformer Shorted Out by Two Contract Workers in Switchyard.Workers Sent to Hosp for Burns.Alert Terminated. Startup Transformer Returned to Svc on 871017 + (07:58:36, 3 December 2024)
- ML20236B659 + (07:58:37, 3 December 2024)
- B12588, Proposed Tech Specs Providing Limiting Conditions for Operation & Surveillance Requirements Per Generic Ltr 83-37 (NUREG-0737) + (07:58:38, 3 December 2024)
- ML20236B656 + (07:58:39, 3 December 2024)
- ML20236B657 + (07:58:39, 3 December 2024)
- ML20236B655 + (07:58:40, 3 December 2024)
- ML20236B654 + (07:58:41, 3 December 2024)
- 05000302/LER-1987-010, :on 870618,discovered That Requirements for once-through Steam Generator Operating Range Level Did Not Meet Tech Spec Requirements.Caused by Personnel Error.Plant Procedure Revised + (07:58:42, 3 December 2024)
- IR 05000245/1987025 + (07:58:45, 3 December 2024)
- ML20236B648 + (07:58:46, 3 December 2024)
- ML20236B650 + (07:58:46, 3 December 2024)
- ML20236B646 + (07:58:47, 3 December 2024)
- ML20236B645 + (07:58:48, 3 December 2024)
- 05000413/LER-1987-023, :on 870411,surveillance of Fire Detection Zones Missed Due to Lack of Administrative Controls for Retiring Tech Spec Standing Work Requests.Work Request Initiated & Surveillance Requirements Performed + (07:58:51, 3 December 2024)
- 05000395/LER-1987-024, :on 870924,negative Rate Reactor Trip Occurred When Technician Deenergized Two Rod Control Power Supplies. Caused by Personnel Error.Personnel Counseled in Proper Application of Logic/Schematic Diagrams + (07:58:52, 3 December 2024)
- ML20236B640 + (07:58:53, 3 December 2024)
- IR 05000483/1987018 + (07:58:59, 3 December 2024)
- ML20236B637 + (07:59:00, 3 December 2024)
- ML20236B636 + (07:59:00, 3 December 2024)
- ML20236B635 + (07:59:01, 3 December 2024)
- TXX-8903, Forwards Proposed Changes to Tech Spec for Plant & Revised Figures for Heatup & Cooldown Limit Curves & PORV Setpoints for Overpressure Mitigation Curves + (07:59:01, 3 December 2024)
- ML20236B632 + (07:59:04, 3 December 2024)
- ML20236B630 + (07:59:05, 3 December 2024)
- ML20236B628 + (07:59:06, 3 December 2024)
- ML20236B629 + (07:59:06, 3 December 2024)
- ML20236B627 + (07:59:07, 3 December 2024)
- 05000269/LER-1987-006-05, :on 870521,during QA Review Determined That Required Valve Body Pressure Test Not Performed on Valves 3HP-43 & 3LPSW-18.Caused by Personnel Error.Required Pressure Test Performed & Individual Counseled + (07:59:08, 3 December 2024)
- ML20236B624 + (07:59:09, 3 December 2024)
- ML20236B625 + (07:59:09, 3 December 2024)
- IR 05000354/1989003 + (07:59:10, 3 December 2024)
- 05000373/LER-1988-029-01, :on 881230,discovered That Reactor Vessel Low Water Level 3 Switch LS-1B21-N038B Found W/Setpoint out-of- Tolerance in Excess of Reject Limit.Caused by Degradation of Contact on Microswitch.Rejected Switch Removed + (07:59:12, 3 December 2024)
- ML20236B617 + (07:59:13, 3 December 2024)
- ML20236B621 + (07:59:13, 3 December 2024)
- ML20236B615 + (07:59:16, 3 December 2024)
- NL-87-1322, Monthly Operating Rept for Sept 1987 + (07:59:16, 3 December 2024)
- ML20236B613 + (07:59:17, 3 December 2024)
- ML20236B611 + (07:59:18, 3 December 2024)
- ML20236B612 + (07:59:18, 3 December 2024)
- AECM-87-0135, Confirms Jul 1987 Telcon W/Nrc Re Validity of Loss of Feedwater Heating Analysis & Use of Cotransa Computer Code in Support of Cycle 3.Addl Analyses at Four Cycle 3 Exposures Performed.Schedule Requested to Support Review + (07:59:19, 3 December 2024)
- ML20236B606 + (07:59:20, 3 December 2024)
- ML20236B607 + (07:59:20, 3 December 2024)
- 05000455/LER-1987-016, :on 870831,during Surveillance Test,Inadvertent Train a Safety Injection Occurred.Caused by Personnel Communication Breakdown.Prof Program Will Be Covered W/ Operating Dept for 6 Wks + (07:59:22, 3 December 2024)
- ML20236B604 + (07:59:22, 3 December 2024)
- ML20236B602 + (07:59:23, 3 December 2024)
- ML20236B603 + (07:59:23, 3 December 2024)
- ML20236B599 + (07:59:24, 3 December 2024)
- ML20236B597 + (07:59:25, 3 December 2024)
- ML20236B596 + (07:59:26, 3 December 2024)