ML20236B632

From kanterella
Jump to navigation Jump to search
Rev 2 to NES-1 Cask Operating & Handling Procedures. W/
ML20236B632
Person / Time
Site: 07109151
Issue date: 07/10/1987
From: Dalton J
NUCLEAR ENERGY SERVICES, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
28405, 83A1908, WMS-1430, NUDOCS 8707290177
Download: ML20236B632 (18)


Text

- -.

h y.

mr NUCLEAR ENERGY SERVICES DOCUMENT NO.

83A1908 REV.

2 3g d owror htcone -

I OF 17-PAGE 4

I 1

NES-1 CASK OPERATING AND HANDLING PROCEDURES l

l Project Appiscation Copy No Assigned To 6438 APPROVALS TITLE / DEPT. - SIGN ATURE - D ATE REV NO PREPARED BY Proj. Mgr.

_G.M., WMS QA Mgr. -

J,)gjemkg [Q,kgfj h,Ojdf;p O

-3.alszh2hGGH5Xd2JM7 "*"3%*

i 694&wtt

""""'L*"

LThDeb 2

3 4

i r i rt r,

5 I

i i

el Lj t ;

i a

e 3 n 3y J

7 h

I 8

9 10 8707290177 870710 l

PDR ADOCK 0710 1

11 C

I I

FORM # NES 204 9/34

)

c " " ""' " -

8'^

  • MVISION LOG e

mur NUCLEAR ENERGY SERVICES PAGE 2

OF 17

=

"#[

"((

DATE DESCRIPTION APPROVAL y

1 7/2/87 9

See CRA #6520 h '.

2 7/10/87 10 See CRA // 6521

\\/

,g5 [__

i 1

k i

l l

l l

l l

l l

FORM eNES 2062'80 L--____--___-____-_______-_-_-_____

9]

1 J

83A1908 DOCUMENT NO.

U O'

NUCLEAR ENERGY SERVICES I

TABLE OF CONTENTS PAGE 1.

SCOPE 4

2.

REFERENCES 4

3.

PREREQUISITES 4

3.1 Regulations 4

i 3.2 Equipment 4

4.

PRECAUTIONS 5

5.

SPECIFIC PROCEDURES 5

5.1 Receipt of Cask 6

5.2 Removal of Cask from Trailer 6

5.3 Removal of Primary Lid 7

5.4 Installation of Primary Lid 8

5.5 Removal of Secondary Lid 9

5.6 Installation of Secondary Lid 10 i

5.7 Loading Cask 10 5.8 Unloading Cask 12 5.9 Loading Cask on Trailer 12 5.10 Shipping Package Offsite 13 l

I i

i FORM a NES 205 2/80

83A1908 DOCUMENT NO.

NUCt. EAR ENERGY SERVCES i

NES-1 CASK OPERATING AND HANDLING PROCEDURES

1. SCOPE This procedure describes the operation and handling of the NES-1 cask.
2. REFERENCES 2.1 Certificate of Compliance, NRC #71-9151 2.2 Title 10 Code of Federal Regulations Parts 20,61,71 2.3 Title 49 Code of Federal Regulations Parts 172,173 2.4 NES Procedure 83A1907, "NES-1 Cask Maintenance Procedures."

{

l 2.5 NES Procedure 83A1902, " Bubble Leak Test Procedure."

2.6 NES 81 A1050, " Quality Assurance Program Plan for NES Transport Casks."

3. PREREQUISITES 3.1 REGULATIONS 3.1.1 The recipient of a loaded cask shall be an NRC register user of the NES-1 cask, in accordance with 10 CFR 71.12.

i 3.2 EQUIPMENT a)

Torque wrench with at least 200 ft.-lb. minimum capacity, b)

Four point lif ting sling 5 ft or greater in length with a total safe working load of 60,000 lbs. (Required only if cask is to be lif ted off the trailer).

FORM #NES 205 2/80 j

^

DOCUMENT NO.

0 NUCLEAR ENERGY SERVICES c)

Three point lifting sling, 5 ft. or greater in length with a total safe working load of 3600 lbs.

d)

One or three point lif ting sling with a total safe working load of 400 lbs.

(Required only if secondary lid is to be removed.) The NES-l's secondary lid may have one or three lifting lugs, depending on the version of the cask.

i e)

'Other lifting equipment, as required, to attach to and safely lift the contents of the package.

i

4. PRECAUTIONS l

l 4.1 Radiation surveys and appropriate health physics precautions shall be taken a

during all phases of cask handling. Particular care shall be exercised in those

{

activities involving cask lid removal and installation.

)

1 4.2 Standard lif ting safety procedures shall be used during all lifting operations.

4.3 The transportation tractor shall be shut down (or the tractor disconnected physically from the trailer) and the trailer blocked in place prior to any operation on the cask, except for radiation surveys.

4.4 in the event of an emergency or unusual situation, notification to NES shall be made as soon as possible.

l 4.5 Waste shall be packaged in an acceptable manner in accordance with DOT, NRC, Certificate of Compliance #71-9151, and other applicable requirements.

5. SPECIFIC PROCEDURES Procedures for each handling and loading operation of the NES-1 cask are in this section.

The user shall review this section and determine which sections are applicable to the user's anticipated tasks.

FORM # NES 205 2/80

C' 8 A1908 DOCUMENT NO.

aur 6

PAGE OF '

17 NUCLEAR ENERGY SERVICES 3.1 RECEIPT OF CASK 5.1.1 The receiver of the NES-1 cask shall perform a radiation survey of the NES-1 cask. The survey shall be performed to applicable site requirements by an appropriate procedure or according to 10 CF.R 71 and 10 CFR 20.205.

If the survey readings exceed acceptable levels, notify NES immediately.

5.1.2 Inspect the primary lid ratchet binders for signs of damage or cracks and i

1 ensure they are properly secured to the primary lid. If the cask is equiped l

with a raincover, remove the raincover to make the inspection.

l 5.1.3 Inspect the secondary lid studs and nuts for indications of damage.

l l

5.1.4 Check to assure the primary and secondary lid lug covers are attached.

5.1.5 Check to assure the drain plug has been properly installed.

1 5.1.6 If any of the above inspections reveal damage or non-compliance, notify i

NES immediately.

S.2 REMOVAL OF CASK FROM TRAILER I

If it is necessary to remove the cask from the trailer, proceed as follows:

5.2.1 If cask is equipped with raincover, and it has not been removed, rernove the raincover from the cask.

5.2.2 Le asen and remove tie-down cable rachet binders / turnbuckles from the cask tiedown lugs..

f l

5.2.3 Inspect cask lifting lugs for cracks and other dama'ge.

i 5.2.4 Attach 4 point lif ting sling to cask lifting lugs (Reference Figure 1). The vertical safe working load of the sling and crane shall be at least 60,000 FORM 8 NES 205 2/80

y i

83A1908 3

DOCUMENT NO.

l U

E OF NUCLEAR ENERGY SERVICES l

i

' lbs. The cable length must be greater than 5 feet. DO NOT USE LID LIFTING LUGS TO LIFT CASK!

l 5.2.5 Slowly lift cask and move to desired location.

i 5.3 REMOVAL OF PRIMARY LID l

If it is necessary to remove the primary lid proceed as follows:

l 5.3.1 If the cask is equipped with a raincover, and it has not been removed, remove the raincover from the cask.

l 5.3.2 Inspect both the primary and the secondary lid security seals for tampering. If the seals have been broken, notify NES. If the security seals have not been tampered with, break the primary lid security seal.

5.3.3 Release the ratchet binder handles from its storage position by removing-

)

the quick release pins, as shown below.

j i

l l

5.3.4 Adjust ratchet mechanism so that the ratchet binders can be loosened and I

loosen the ratchet binders, as shown below.

4.d.h Pvt ry Ltd

/

=.' :':' -~"

/

N I l q

!g x.-v

/ (

\\.....

l

->~

l 7

..... /

Ii

= _. _..

l l

l 5.3.5 Remove quick release pins from the threadless bolts and remove the threadless bolts.

5.3.6 Remove primary lid lif ting lug covers and attach 3 point lifting sling with a vertical safe working load of 5600 lbs. to the primary lid lugs.

FORM # NES 205 2/80

i 83A1908 l

DOCUMENT NO.

j NUCLEAR ENERGY SERVICES l

5.3.7 Slowly lift the primary lid vertically until it has cleared the guide pins and i

place it in the lid laydown area.

5.3.8 In the case of an empty cask which is to be loaded, inspect the interior of j

the cask for standing water, defects, or obstructions, which might impede l

loading or affect cask integrity. Water must be removed prior to shipment.

{

j l

5.3.9 In the case of an empty cask which is to be loaded, inspect all ratchet binder components (jaws, pins, barrels) for cracks and other damage which may impair their ability to function properly.

I 5.4 INSTALLATION OF PRIMARY LID 1

If it is necessary to attach primary lid, proceed as follows:

i l

5.4.1 Inspect primary lid gasket for cuts, nicks or other damage which may impair its ability to seal the cask. If necessary, replace or repair gasket in accordance with NES procedure 83A1907.

l l

5.4.2 Inspect alignment pins for damage.

If damaged so as to prevent installation of the lid, remove alignment pins.

l 5.4.3 Using 3 primary lid lifting lugs and the primary lid lifting sling (vertical j

safe working load of 5f>00 lbs.), lift the primary lid and carefully place it on i

l the cask using the alignment pins or alignment strips. Check alignment

)

strips to insure proper lid position.

5.4.4 Inspect the ratchet binder assemblies for defects which may impair their ability to function properly.

Install threadless bolts through the upper ratchet binders and closure lugs and lock threadless bolts in place with quick release pins.

I 5.4.5 Adjust the ratchet mechanism so the ratchet binder may be tightened and tighten all ratchet binders to remove the slack in the ratchet binders. The lid should be snug against the gasket, but not compressing it.

FORM 8 NES 205 2/80 L_____________.

83 A1908 DOCUMENT NO.

NUCLEAR ENERGY SERVICES j

5.4.6 Using the tightening sequence shown in Figure 2, tighten all ratchet binders 1

applying approximately 50 lbs force at the end of the ratchet binder handle. Ratchet binders are tightened when the barrel and handle are rotated towards the ratchet binder handle retainers on the cask. Repeat the tightening sequence, but tighten the ratchet binders applying between 117 and 133 lbs. force at the end of the ratchet binder handle in order to I

l obtain the required torque of 175 to 200 f t.-lbs.

(

i 5.4.7 Inspect the primary lid gasket to insure uniform compression.

5.4.8 Disengage ratchet mechanism and place the ratchet binder handles in their storage position.

l l

5.4.9 Install lid lif ting lug covers and install primary lid security seal.

5.4.10 if the cask is equipped with a rain cover, install the rain cover.

l 5.5 REMOVAL OF SECONDARY LID 5.5.1 If the cask is equipped with a raincover, and it has not been removed, remove the raincover from the cask.

5.5.2 Inspect both the primary lid and secondary lid security seals for tampering.

If the seals have been broken, immediately notify NES. If the security seals have not been tampered with, break the secondary lid seal.

1 5.5.3 Remove the 3/4" secondary lid closure nuts.

5.5.4 Remove secondary lid lug cover (s) and attach a one point lifting sling for casks with one secondary lid lag or a three point lif ting sling for casks with three secondary lid lugs. The sling should have a safe vertical working load of 400. Ibs.

5.5.5 Slowly lif t the secondary lid vertically until it is clear of the alignment pins, then place it in the lid laydown area.

l l

FORM s NES 205 2/80 L_ __.

E DOCUMENT NO.

33A 1908 -

lHIl NUCLEAR ENERGY SERVICES 5.5.6 In the case of an empty cask which. Is to be loaded, inspect the secondary lid gasket for cuts, nicks, or other damage which could impair its ability to seal the cask. If necessary, replace or repair gasket in accordance with I

NES Procedure 83A1907.

5.5.7 Inspect secondary lid studs and nuts for damage (cracks, stripped threads, etc.) which could impair their strength.

5.6 INSTALLATION OF SECONDARY LID 5.6.1 Inspect alignment pins for damage, if damaged so as to prevent installation of the secondary lid, remove alignment pins.

5.6.2 Using the one center or three secondary lid lif ting lugs, depending on the version of the cask, and the secondary lid lifting sling (safe vertical working load of 400 lbs.), lift the secondary lid and carefully place it on the primary lid using the alignment pins or alignment strips. Check alignment strips to insure proper lid position.

5.6.3 Inspect nuts and studs for defects which may impair their ability to j

q properly function. Install secondary lid 3/4" nuts and washers on secondary I

lid studs. Do not tighten.

5.6.4 Torque the nuts to 50 ft.-lbs. according to the numbering sequence shown j

in Figure 2.

Using the same sequence torque nuts to 120 f t.-lbs. Repeat torquing sequence until all nuts are at 120 ft.-lbs.

5.6.5 Install secondary lid lifting lug covers and attach secondary lid security j

seal.

1 5.6.6 If the cask is equipped with a raincover, install the raincover.

i

/ORM # NES 205 2/80 1

____--_---______-A

c-DOCUMENT NO.

amr W NUCt. EAR ENERGY SERVICES 5.7 LOADING CASK The NES-1 cask may be loaded in one of the following configurations:

1 l

a)

Loading the payload through the primary lid, such as loaded. liners, 55-gallon drums or stackable pallets with 55-gallon drums.

b)

One liner loaded through the secondary lid.

l 1

5.7.1 Loading through the primary lid.

5.7.1.1 Remove primary lid. See Section 5.3.

I i

5.7.1.2 Prior to loading cask, inspect primary lid gasket for cuts, nicks, gouges or other damage which may impair its ability to seal the cask.

5.7.1.3 Lif t the payload and carefully place inside the cask cavity. Ensure the payload's lifting device is accessible for retrieval and will not i

interfere with the loading of other contents.

5.7.1.4 Repeat the loading process, step 5.7.1.3, as required to complete the i

loading of the cask.

The total payload weight shall be less than 19,205 lbs, and it must comply with Certificate of Compliance 71-9151.

5.7.1.5 Install shoring as necessary to prevent movement of the payload during transport.

5.7.2 Loading liner in cask.

5.7.2.1 Remove secondary lid according to Section 5.5.

5.7.2.2 Remove primary lid according to Section 5.3.

5.7.2.3 Carefully lift empty liner and place inside cask.

Place shoring between the liner and the cask to secure the liner in position.

FORM # NES 205 2/80

A1908 DOCUMENT NO.

j em ar i

2 gg PAGE g,

17 NUCLEAR ENERGY SERVICES i

i 5.7.2.4 Inspect primary lid gasket according to 5.7.1.2.

s 5.7.2.5 Install primary lid according to Section 5.4.

5.7.2.6 Inspect secondary lid gasket for cuts, nicks, gouges or other damage f

which may impair its ability to seal the cask.

5.7.2.7 Load liner through secondary lid opening.-

5.7.2.8 Close Liner and install secondary lid according to Section 5.6.

5.8 UNLOADING CASK l

5.8.1 Survey the cask and trailer per applicable site requirements and 10 CFR 20.205.

5.8.2 Remove primary lid according to Section 5.3.

i i

5.8.3 Connect slings from payload to lif ting device.

The maximum payload weight is 19,205 lbs.

1 NOTE: Take proper radiological precautions to protect personnel when removing payload from cask.

5.8.4 Carefully lift the payload out of cask and place in disposal area.

5.8.5 Inspect gasket per 5.7.1.2 and install primary lid according to Section 5.4.

l 5.8.6 Survey the cask and trailer for release in accordance with applicable 7

l requirements.

I t

FORM # NES 205 2/80

4 1

j S3Ai908 I

DOCUMENT NO.

e 1

17 j

PAGE OF NUCLEAR ENERGY SERVICES 5.9 LOADING CASK ON TRAILER l

4 If the cask was removed from the trailer, proceed as follows:

q 5.9.1 If the cask is equipped with a raincover, remove raincover, if necessary.

i 5.9.2 Using the four cask lif ting lugs and suitable rigging, lift the cask and place j

on the trailer.

NOTE: Do not use ild lifting lugs to lift the cask.

5.9.3 Inspect tie-down cables and shackles for any condition which may impair their ability to function.

5.9.4 Attach tie-down cable shackles to the cask tie-down lugs.

5.9.5 Tighten cask shear blocks to secure the cask in position.

5.9.6 Tighten tie-down cable ratchet binders.

5.9.7 Check that the tie-down cable positions are within 1 foot of the positions shown below.

y.

/

\\

j/

s. 0"

/

\\

\\

,e K

i 7

.e

's N

FORM 8 NES 205 2/80

__ a

u e

j 8 A1908 DOCUMENT NO N

U GE OF

. NUCLEAR ENERGY SERVICES 5.9.9 Check that the tie-down cables do not touch one another.

5.9.10 If the cask is equipped with a raincover, install raincover.

j f

5.10 SHIPPING PACKAGE OFFSITE 5.10.1 Perform a radiation survey of the package and vehicle to verify that those levels are below those specified in 10CFR71.47 and 71.87.

5.10.2 Label and placard the package in accordance with applicable regulation.

5.10.3 Ensure all appropriate shipping papers and radioactive waste manifest are complete and included with the NES-1 package prior to release from the site.

1 i

5.10.4 Complete the NES-1 Pre-Release Checklist. Attach one copy with the shipping papers and send another copy to NES.

FORM 8 NES 205 2/80

-7 83A1908 DOCUMENT NO.

my 15 PAGE op_

17 NUCt. EAR ENERGY SERVICES r

NES-1 PRE-RELEASE CHECKL5T Date:

Shipment I.D.:

Cask I.D.:

Transport Company:

Time and date of Arrival at Site:

Time and date of Departure from Site:

Initialed Date 1.

Receipt inspection, Section 5.1 2.

Gaskets in good condition, Sections 5.3 & 5.5 3.

Approved inner container (s) used, Section 3.2.5

)

4.

Inner containers secured in place, Section 5.7 5.

Lids installed properly, Sections 3.4 & 5.6 i

6.

Drain Plug installed.

7.

Lif t lugs covers installed, Sections 5.4 & 5.6 8.

Tie-downs installed properly, Section 5.9 9.

Cask properly labeled and placarded, Section 5.10 10.

Radiation survey completed and recorded, Section 5.10 11.

Shipping papers properly completed, Section 5.10 f

Signature Title Date FORM s NES 205 2/80

q t

4 i

DOCUMENT NO, 33A1908

{

g PAGE M OF 17 EF NUCLEAR ENERGY SERVICES i

Cask Lifting Lug l

Primary Lid Lifting Lug (3)

Primary Lid Secondary Lid Lifting Lug (1 or 3)

Secondary Lid l

l 4

'O I 0

j C

I m

9 8

I

/-

]

Tie-down Lug Cask Body i

Figure 1 COMPONENTS OF THE NES-1 PACKAGE FORM

  • NES 205 2/80

N 83^ '

DOCUMENT NO.

E1 I

PAGE OF-17 NUCLEAR ENERGY SERVICES Secondary Lid

//

/

,1/

8 b

1!

8 3

6 O 04 (d

Os 5 O O)a 5

4 2

7 2

7 Primary Lid Figure 2 TIGHTENING SEQUENCE FOR PRIMARY AND SECONDARY LIDS FORM 8 NES 205 Leo a

7 i

Q

'\\

I I

Obb!$k. () O __...,..._

i cc u n a._.. d 2 d V2 1 7 _ _

ca om

/srp ca. n -_M/

f rw tw _.d_,.

l na uw

! g c ", r.

ms /. [-

'l ar.

k f

1 b

4

RETURN 4-T, U 3 9 6 g s H

o

^ NUCLEAR ENERGY SERVICES SHELTER ROCK ROAD, DANBURY, CT 06810-7095 itLEPHONE C03) 7%5000 WMS-1430 l

)

' July 10, 1987

,/ O Mr. Charles E. MacDonald, Chief

'f

${g{fvg)

Transportation Certification Branch Fuel Cycle and Materials Safety Division 2

dl][ y,g J[

N h/

9 u.s,Nucm,g,ylWDRYl7 '

Washington, D.C. 20555 COMuna.

j Subj ect: Docket No. 71-9151

,9yg

Dear Mr. MacDonald,

d7]~I j 1

Please find enclos,ed ten (10) copies of the following NES Procedure:

)

83A1908, Rev. 2, NES-1 Cask Operating and Handling Procedure Page 10 was revised to specify the tightening tongue for the second-

)

ary lid.

1 If you have any questions regarding the enclosed, please feel' free to contact me at your. convenience.

]

j I

Very truly yours.

NUCLEAR ENERGY SERVICES l

John Dalton Manager Engineering and Fabrication Waste Management Services 2

l u

H:

2 cc: H. Larson

/ Q l'

oocarn 5

g usnea p

~

m 9;

JUL 141987 kj%d[3)'JpME{#IIfh;h d$i%

W* / ^ ' c mas r

>jy*

281tM l.

l L__1 _ __ _ _ _ _ _ _ _ _ _ _ _

_