Order Extending Latest Const Completion Date for CPPR-39 to 770101
ML20236B635
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 07/06/1976
From: Deyoung R
Office of Nuclear Reactor Regulation
To:
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20236A877 List: ... further results
References
FOIA-87-214 NUDOCS 8707290179
Download: ML20236B635 (3)


Text

[ 7

'# s PACIFIC GAS AND ELECTRIC COMPANY (DI ABL,0 CANYON NUCLEAR P0nER PLANI, UNIT I)

DOCKET NO. 50-275  ;

ORDER EXTENDING CONSTRUCTION COMPLETION DATE Pacific Gas and Electric Company is the holder of Construction Permit i

CPPR-39 issued by the Nuclear Regulatory Commission on April 23, 1968 l for construction of the Olablo Canyon Nuclear Power Plant, Unit I, presently under construction on the applicant's si te in San Luis Obispo

/

County, Cal i fornia .

On May 25,1976, Pacific Gas and Electric Company filed a request for an extension of the completion date.  ;

On Apr i l 29, 1976 the United States Ceologice! Survey (USGS) issued its review of the geological and seismologic data' relevant to the Diablo <

I Canyon Units in which it was concl uded that an earthquake occurring anywhere j along the Hosgri Fault should be considered in addition to those earthquakes previousl y conoidered in the design of the units. On-May 11, 1976 the Commission's Staf f issued Supplement No. 4 to the Safety Evaluation Report which specified an ef fective horizontal ground acceleration to be used for the development of design response spectra for the piant based upon the earthquake postulated by the USGS.

Additional time will be required to permit PGandE to evaluate the plant's capability to withstand the new earthquake, for the Commission to review and eval uate PGandE's work, and to concl ude the licensing process.

1 i

I h

8707290179 FOIA 970721 PDR PDR I

L CONNORB7~214_ _ _ _ _ _ _ - _ _ . _ _ .

As s This action involves no significant hazards consideration; good cause has been shown for the delay; and the requested extension i s for a reasonable period, the bases for which are set forth in a staf f eval uation dated For f urther de; alls with respect to this action, see (l) the applicant's request for extension of the completion dates pated May 25,1976, and (2) the Staf f's related eval uation, all of which are available for public inspection at the Commission's Public Document Room and at the Local Public Document Rooms.

IT IS HEREBY ORDERED THAT THE latest completion date for CPPR-39 is 4

extended f rom Jul y 1,1976 to January 1,1977.

FOR THE NUCLEAR REGULATORY COMMISSION

/

R. C. DeYou.

Fe,Asslutant Director f

for Light Water Reactors Division of Project Management Date of Issuance: 'l

- 0 6 D76 ,

4 P

i f

l i

1 i

w__-_---_-___- _- - . ~ _ E

l

= f U-41-/O 4

r i SArt LUIS ODISPD MOTHERS FOR PEACE une 21, 197 i

/\ '

g.a .\

'; gib 7 3,[ I E W'

- , >. . v. # }ll crnge(g;.)/

Mr. Philip A. Crane, Jr.

Leu Department Pacific Gas and Electric Co.

77 Beale Street San Francisco, CA 94106 (Re: Dockets00-27s '323-OL)

Dear Mr. Crane:

The following discovery request is niade on behalf of San Luis Obispo Mothers for Peace and John J. Forster persucnt to the applicable provisions of 10 CFR 2.740 and 2.741.

We uculd like to look at a copy of all Radictio.1 Control Staridards (RCS) and Radiation Control Procedures (RCP) which have been approved by the Plant Staff f:eviou Conmittee (PSRC). Picase send a copy of each to the address belcu. .,

Sincerely yours, SAN LUIS ODISP0 MOTHERS FOR PEACE '

JOHli J. FORSTER l l

M ^ 4 By/ ,y;,,C;q , , (~Cy#

By M Sandra A. Silver Cordon Silver 5055 Radford Avenue florth' Hollywood, CA 91607 Cc: ASLB Members All Parties ,

e h

i

-