ML20236B599

From kanterella
Jump to navigation Jump to search
Advises That Util Will Submit Ltr by 871130 in Response to Generic Ltr 87-02, Adequacy of Mechanical & Electrical Equipment, Per 871007 Telcon.Util Plans to Discuss Proposed Contents of Ltr W/Nrc on 871112
ML20236B599
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/21/1987
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-02, GL-87-2, NUDOCS 8710260255
Download: ML20236B599 (1)


Text

__

1 p

I t

imum.

umme Portland GeneralElechicCompany

' I am l

David W. Cockfield Vice President, Nuclear l

October 21, 1987-Trojan Nuclear Plant Docket 50-344 Licenso NpF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

. Washington DC 20555 s

Dear Sir:

Generic. Lotter 87-02; Verification of Soismic.

Adoquacy of Mechanical and Electrical Equipment l

l l

Confirming a tolophone discussion betwoon Toronco Chan, Tad Marsh et al, j

and PGE reprosentativos'on October 7, 1987, PGE will submit a letter by i

November 30, 1987-in responso to the subject generic letter. PGE will

}

provido a description of our current activitics, plans, and schedule for implomonting a coismic qualification verification program for the Trojan Nuclear Plant. or a commitment to join the Solomic Qualification Utility Group (SQUG) in the November lotter. PCE plans to discuss the proposed contents of the November lotter in a mooting currently scheduled with the NRC on other issues on November 12.

Sincoroly, as c=

c:

Mr. John B. Martin Rogional Administrator, Region V U.S. Nuclear Regulatory Commission i

>8 Mr. Davo Yadon, Director

.p State of Orogon on Department of Enorgy N

Mr. R. C. Bare NRC Resident Inspector Trojan Nuclear Plant b

hb 8710260255 871021 PDR ADOCK 05000344 U

P PDR 9

121 S W Sa9 Tun Street. Portiarti Oregon 97204

- _ = _ - _ _