Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6971995-12-21021 December 1995 Proposed Tech Specs,Deleting TS LCO 3.4.2 Action Statement B ML20093D4421995-10-0202 October 1995 Proposed TS Section 3.4.2,changing SRV Safety Valve Function Lift Setting Tolerance ML20091P8971995-08-28028 August 1995 Proposed Tech Specs,Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits for Unit 2 ML20084U3071995-06-0808 June 1995 Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/Edgs ML20084C2491995-05-23023 May 1995 Proposed Tech Specs,Clarifying Described Equipment out-of- Svc Options ML20083P6401995-05-19019 May 1995 Proposed Tech Specs,Revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9341995-04-11011 April 1995 Proposed Tech Specs Re Extension of Specific Surveillance Intervals ML20087H7871995-03-31031 March 1995 Proposed Tech Specs Section 3.4.2,revising SRV Safety Function Lift Setting Tolerances ML20078H1531995-01-30030 January 1995 Proposed Tech Specs,Proposing One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S3041995-01-13013 January 1995 Proposed Tech Specs Revising Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7081994-12-14014 December 1994 Proposed Tech Specs,Minimizing Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation in Reactor Protection,Isolation,Emergency Core Cooling,Recirculation Pump Trip & RCIC Sys ML20078B9571994-10-24024 October 1994 Proposed Tech Specs Associated W/Exemption Requests from App J for LaSalle Unit 2 to Return to Cilrt Type a Test Schedule of Three Times in 10 Yrs & for LaSalle Units 1 & 2 to Decouple Cilrt Type a Test Schedule from ISI Schedule ML20069J7801994-06-0909 June 1994 Proposed Tech Specs for Partial Implementation of GE ARTS Program ML20065A2231994-03-22022 March 1994 Proposed Tech Specs Re Deletion of Primary Containemnt Structural Integrity ML20063F3441994-01-28028 January 1994 Proposed Tech Specs 3.3.1 & 3.3.4,extending Surveillance Test Interval from Monthly to Quarterly to Verify Proper Position of MSIV Limit Switches for RPS Instrumentation Operability 1999-08-06
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212F9221999-09-23023 September 1999 Rev 2.3 to Chapters 10,11,12 & App F of LaSalle Annex Odcm ML20211L2871999-09-0202 September 1999 Revs to ODCM, for LaSalle Annex Including Rev 2.2 for Chapters 10,11,12 & App F ML20210R3581999-08-13013 August 1999 Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel ML20210Q4101999-08-0606 August 1999 Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 ML20209G3581999-07-14014 July 1999 Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt ML20209D3231999-07-0707 July 1999 Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3931999-07-0707 July 1999 Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value ML20206T1401999-05-19019 May 1999 Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20207A9491999-02-23023 February 1999 Rev 4 to LaSalle County Station Restart Plan for Unit 2 ML20195E0101998-11-0909 November 1998 Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer ML20195E0541998-11-0909 November 1998 Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 ML20154M4641998-10-16016 October 1998 Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect ML20151Y5991998-09-14014 September 1998 Rev 3 to LaSalle County Station Restart Plan, for Unit 2 Only ML20236U5511998-07-24024 July 1998 NRC Manual Chapter 0350 Restart Action Plan,For LaSalle County Station ML20217M6671998-05-0101 May 1998 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20217N9541998-04-30030 April 1998 Rev 1.9 to Chapter 10,rev 2 to Chapter 11 & Rev 1.9 to Chapter 12 of LaSalle Odcm ML20217P2511998-04-28028 April 1998 Rev 2 to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20216E3221998-04-0707 April 1998 Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program ML20217J2981998-03-24024 March 1998 Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety ML20202C8971998-02-0202 February 1998 Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements ML20203G5051997-12-12012 December 1997 Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum ML20199K5481997-11-24024 November 1997 Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation ML20211P9331997-10-15015 October 1997 Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3771997-09-26026 September 1997 Proposed Tech Specs Adding Ventilation Filter Testing Program ML20216H7711997-09-0404 September 1997 Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20217Q7981997-08-26026 August 1997 Rev 1a to LaSalle County Station Unit 1/Unit 2 Restart Plan ML20141J5671997-08-12012 August 1997 Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House ML20151K9551997-08-0101 August 1997 Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment ML20148U2591997-07-0101 July 1997 Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 ML20148Q4301997-07-0101 July 1997 Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF ML20148N0201997-06-19019 June 1997 Proposed Tech Specs,Relocating Fire Protection Requirements ML20141L0371997-05-27027 May 1997 Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes ML20148D9561997-05-16016 May 1997 LSCS Unit 1/Unit 2 Restart Plan ML20137W5131997-04-14014 April 1997 Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change ML20140C9231997-03-31031 March 1997 Rev 1.9 to Chapter 11, Radiological Environ Monitoring Program & LaSalle Annex Index ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML20134A1931997-01-20020 January 1997 Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber ML20135E6841996-12-0202 December 1996 Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs ML20134L0221996-11-30030 November 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11 & 12 ML20129J4491996-10-31031 October 1996 Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements ML20129B7981996-10-14014 October 1996 Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate ML20116A9601996-07-15015 July 1996 Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections ML20115D8781996-07-0808 July 1996 Cycle 8 Startup Test Rept ML20113C8641996-06-21021 June 1996 Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0641996-04-16016 April 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20107A8641996-04-0808 April 1996 Proposed Tech Specs for Siemens Power Corp Fuel Transition ML20097C9051996-02-0202 February 1996 Rev 1 to ISI Plan for Comm Ed LaSalle County Station Units 1 & 2 Second Ten-Yr Interval Insp Program ML20096G3411996-01-18018 January 1996 Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High 1999-09-23
[Table view] |
Text
_ _ - - _ , _ . _ . _ . - _ _ _ _- _ _ --
i z. ; , -
.. -- c ,
I b, - -r
-1
' j
't. 1 I
j.'.f i
AHACMERI_B ;
- ERQEDSED CHANGES TO . LASALLC' COUNH_ STATION ~ +
IECMICAL_SEECIEICAH RHS FOR QEEEATING LICENSES _NPF-11 AND NPF-18 i
> l
-REVISED PAGES: 4 1
1
-NPF-11 NPF-18 ,
3/4 0-2 3/4.0-2
.B 3/4 0-3 B 3/4 0-3 J
t
.. j e
- \
I i
.l 1
I
- t. .X
? ,4;
'5576K l
1 8903210208 870310 $$
PDR' ik ' ,
4' P . ' ADOCK 05000373 PDC . l3
~* .
yy ,
APPLICABILITY' V
SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirements.
f 4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with: }
- a. A maximum allowable extension not to exceed 25% of the surveillance interval, but
- b. The combined time interval for any 3 consecutive surveillance intervals shall not exceed 3.25 times the specified surveillance interval.
4.0.3 Failure to perform a Surveillance Requirement within the specified time interval shall constitute a failure to meet the OPERABILITY requirements.for a Limiting Condition for Operation. Exceptions to.these requirements are stated
$ in the individual Specifications. Surveillance requirements do not have to be performed on inoperable equipment.
4.0.4 Entry into an OPERATIONAL CONDITION or other specified condition shall not be made unless the Surveillance Requirement (s) associated with the Limiting Condition for Operation have been performed within the stated surveillance interval or as otherwise specified.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, & 3 components shall be applicable as follows:
i
- a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves !
shall be performed in accordance with Section XI of the ASME Boiler ;
and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief !
has been granted by the Commission pursuant to 10 CFR 50, Section j
50.55a(g) (6) (1). g
- b. Surveillance intervals specified in Section XI of the ASME Boiler j and Pressure Vessel Code and applicable Addenda for the inservice j inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as }o follows in these Technical Specifications: p ASME Boiler and Pressure Vessel Required frequencies d Code and applicable Addenda for performing inservice g terminology for inservice inspection and testing q inspection and testing activities activities h f
Weekly At least once per 7 days E Monthly At least once per 31 days [
Quarterly or every 3 months At least once per 92 days y At least once per 184 oays e Semiannually or every 6 months Everv 9 months Yearly or annually At least once per 276 days At least once per 366 days g
{
1 LA SALLE - UNIT 1 3/4 0-2 s
l 1
}
f INSERT _1 4.0.2 - Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance. ,
l 1
l'
. APPLICABILITY !
BASES 1'
3.0.5 (Continued)
(as must be the components supplied by the emergency power source) and all i redundant systems, subsystems, trains, components and devices in the other i division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be ,
capable of performing their design functions and have an emergency power source OPERABLE). In.other words, both emergency power sources 0 and 1A must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, action is required in accordance with this specification.
In OPERATIONAL CONDITION 4 or 5, Specification 3.0.5 is not applicable, and thus the individual ACTION statement for each applicable Limiting Condition .j for Operation in these OPERATIONAL CONDITIONS must be adhered to.
4.0.1 This specification provides that surveillance activities necessary to ensure the Limiting Conditions for Operation are met and will be performed .
during the OPERATIONAL C0NDITIONS or other conditions for which the Limiting Conditions for Operation are applicable. Provisions for additional surveillance activities to be performed without regard to the applicable OPERATIONAL CONDI-g TIONS or other conditions are provided in the individual Surveillance Require-j ments. Surveillance Requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception to an individual specification.
4.0.2 The provisions of this specification provide allowable tolerances :;
for. performing surveillance activities beyond those specified in the nominal surveillance interval. These tolerances are necessary to provide operational 1 flexibility because of scheduling and performance considerations. The phrase ]
"at least" associated with a surveillance frequency does not negate this (
allowable tolerance; instead, it permits the more frequent performance of H surveillance activities. [
The tolerance values, taken either individually or consecutively overN 3 test intervals, are sufficiently restrictive to ensure that the reliability associated with the surveillance activity is not significantly degraded beyond that obtained from the nominal specified interval, j N 4.0.3 The provisions of this specification set forth the criteria for determination of compliance with the OPERABILITY requirements of the Limiting Conditions for Operation. Under this criteria, equipment, systems or components are assumed to be OPERABLE if the associated surveillance activities have been satisfactorily perform d within the specified time interval. Nothing in this provision is to be construed as defining equipment, systems or components OPERABLE, when such items are found or known to be inoperable although still meeting the Surveillance Requirements.
~
LA SALLE - UNIT 1 B 3/4 0-3
I i .\
p_ , ; -
E
- t. , .
' Il .
( l i
L.<
.b
' 1RSERT_3 The allowable tolerance for performing surveillance activities is sufficiently restrictive.to ensure that the' reliability associated with the surveillance activity is'not significantly degraded beyond that obtained from the nominal surveillance interval. It is not intended that
' the allowable tolerance be used as a convenience to reper$edly schedule j the performance.of surveillance at the. allowable tolerance limit. ;
i i
i i
1 9
_--___x.---.a ._ _ _ . . - _ . - . - . ._. -. -
APPLICABILITY !
Ov SURVEILLANCE REQUIREMENTS 4.0.1 . Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS l or other conditions specified for individual Limiting Conditions for Operation !
unless otherwise stated in an individual Surveillance Requirements. '
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
- a. A maximum allowable extension not to exceed 25% of the surveillance .
interval, but k
- b. The combined time interval for any 3 consecutive surveillance intervals ,l shall not exceed 3.25 times the specified surveillance interval.*
l 4.0.3 Failure to perform a Surveillance Requirement within the specified time !
interval shall constitute a failure to meet the OPERABILITY requirements for a -ll Exceptions to these requirements are stated <!
in the individual Specifications. Surveillance requirements do not have to be p[\LimitingConditionforOperation. performed on inoperable equipment.
j!
4.0.4 Entry into an OPERATIONAL CONDITION or other specified condition shall 'k not be made unless the Surveillance Requirement (s) associated with the Limiting Condition for Operation have been performed within the stated surveillance interval or as otherwise specified.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME O- Code Class 1, 2, & 3 components shall be applicable as follows:
- a. Inservice inspection of ASME Code Class 1, 2, and 3 components and ll inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler Ijt and Pressure Vessel Code and applicable Addenda as required by lq 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50.55a(g) (6) (i),
- b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as l follows in these Technical Specifications: ;
ASME Boiler and Pressure Vessel Required frequencies Code and applicable Addenda for performing inservice terminology for inservice inspection and testing inspection and testing activities activities 1 Weekly At least once per 7 days i Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days ;
Semiannually or every 6 months At least once per 184 days '
Every 9 months At least once per 276 days Yearly or annually At least once per 366 days 1
(d *Nat applicable to 18 month surveillance required for Unit 2 Cycle 2 operation.
l LA SALLE -. UNIT 2 3/4 0-2 Amendment No. 38 (,
q'
7__
.s .
i JNSERL1 4.0.2 - Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance.
e e
1
APPLICABILITY l BASES
.3.0.5 (Continued)
(as must be the components suppli,ed by the emergency power source) and all redundant systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of performing their design functions and have an emergency power source OPERABLE). In other words, both emergency power sources 0 and 2A must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, action is required in accordance with this specification.
In OPERATIONAL CONDITION 4 or 5, Specification 3.0.5 is not applicable, and I-thus the individual ACTION statement for each applicable Limiting Condition l for Operation in these OPERATIONAL CONDITIONS must be adhered to.
{
4.0.1 This specification provides that surveillance activities necessary to ensure the Limiting Conditions for Operation are met and will be performed during the OPERATIONAL CONDITIONS or other conditions for which the Limiting Conditions for Operation are applicable. Provisions for additional surveillance activities to be performed without regard to the applicable OPERATIONAL CONDI-TIONS or other conditions are provided in the individual Surveillance Require-ments. Surveillance Requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception te an individual specification. I 4.0.2 The provisions of this specification provide allowable tolerances for performing surveillance activities beyond those specified in the nominal surveillance interval. These tolerances are necessary to provide operational i
flexibility because of scheduling ar.d performance considerations. The phrase "at least" essociated with a surveillance frequency does not negate this allowable tolerance; instead, it permits the more frequent performance of !
surveillance activities.
The tolerance values, taken either individually or consecutively over j [4f 3 test intervals, are sufficiently restrictive to ensure that the reliability associated with the surveillance activity is not significantly degraded beyond that obtained from the nominal specified interval.
L ---.__
4.0.3 The provisions of this specification set forth the criteria for determination of compliance with the OPERABILITY requirements of the Limiting Conditions for Operation. Under this criteria, equipment, systems or components are assumed to be OPERABLE if the associated surveillance activities have been satisfactorily performed within the specified time interval. Nothing in this .
provision is to be construed as defining equipment, systems or components OPERABLE, when such items are found or known to be inoperable although still meeting the Surveillance Requirements.
LA SALLE - UNIT 2 8 3/4 0-3
' ~'
gg ?' '- G y, ,
H ,
l L.
l.
JNSERT_2 The allowable tolerance for performing surveillance activities.is .i sufficiently restrictive to ensure that the reliability associated with i the surveillance activity is not significantly degraded beyond that obtained from the> nominal surveillance interval. It is not intended that the. allowable tolerance be used as a convenience to repeatedly schedule the performance of. surveillance at the allowable tolerance limit.
t i
1 1
i
l e c. .
J l
AIIACHMENI_C SIGtHIlCANL11AZABMSlotlSIDJaAIlRH Commonwealth Edison has evaluated the proposed Technical Specification Amendment and determined that it does not represent a significant hazards consideration. Based on the criteria for defining a significant hazards consideration established in 10 CFR 50.92, operation of LaSalle County Units 1 and 2 in accordance with the proposed snendment will not:
I
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated because The 3.25 surveillance interval extension criteria of Technical Specification 4.0.2 was not considered in the plant accident analysis (UFSAR Chapter 15).
i
- 2) Create the possibility of a new or different kind of accident from any l accident previously evaluated because: 1 The surveillance interval will still be constrained by the 25 percent interval extension criteria of Technical Specification 4.0.2.
- 3) Involve a significant reduction in the margin of safety because: i Deletion of the requirement "any three consecutive intervals must not exceed 3.25 times the interval" will not significantly effect equipment reliability. This exemption will allow all surveillance intervals to be constrained by the maximum allowable extension of 25 percent of the specified surveillance interval which
- 11 enhance safety when used during plant operation. Normal scheu ting would still be at the specified surveillance interval.
Guidance has been provided in 51 FR 7744 for the application of standards to license change requests for determination of the existence of amendments which are and are not considered likely to involve significant j hazards considerations. This proposed unendment does nQt involve a i
significant relaxation of the criteria used to establish safety limits, a j significant relaxation of the bases for the limiting safety system settings, a I significant relaxation of the bases for the limiting conditions for operations.
Therefore, based on the guidance provided in the Federal Register and the criteria established in 10 CFR 50.92(e), the proposed change does not.
constitute a significant hazards consideration.