Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000333/1980009 + (22:32:51, 25 December 2024)
- ML19336A379 + (22:32:54, 25 December 2024)
- ML19336A377 + (22:32:56, 25 December 2024)
- ML19336A378 + (22:32:56, 25 December 2024)
- ML19336A376 + (22:32:57, 25 December 2024)
- 05000338/LER-1980-082-03, /03L-0:on 800925,tap Settings for Offsite Ac Power Source Transformers Found Not as Assumed in Voltage Profile Analyses.Caused by Insufficient Tap Setting Administrative Control in 500 kV/34.5 Kv & 34.5 kV/4160 Volt Transfor + (22:32:58, 25 December 2024)
- ML19336A373 + (22:33:02, 25 December 2024)
- ML19336A371 + (22:33:03, 25 December 2024)
- 05000155/LER-1980-030-03, /03L-0:on 800919,minor Seat Leakage Discovered in Containment Isolation Valve CV4027.Caused Not Determined. Valve Seat Scheduled for Replacement Due to Previous Indication of Wear + (22:33:04, 25 December 2024)
- 05000338/LER-1980-082, Forwards LER 80-082/03L-0 + (22:33:07, 25 December 2024)
- 05000155/LER-1980-030, Forwards LER 80-030/03L-0 + (22:33:14, 25 December 2024)
- ML19336A365 + (22:33:16, 25 December 2024)
- ML19336A364 + (22:33:17, 25 December 2024)
- PNO-IV-80-033A, on 801003,Region IV Notified That Three Sr-90/Y-90 Sources Involved in Railway Accident Had Been Recovered.Shipping Containers Were Found Undamaged & No Unusual Radiation Levels Were Found + (22:33:19, 25 December 2024)
- ML19336A362 + (22:33:20, 25 December 2024)
- ML19336A359 + (22:33:24, 25 December 2024)
- PNO-I-80-147, on 801008,plant Emergency Declared When Multiple Radiation Alarms Were Received.Indicated Radiation Levels Returned to Normal in 5 Minutes.Licensee Attributes Event to Instrument Problems + (22:33:26, 25 December 2024)
- ML19336A354 + (22:33:27, 25 December 2024)
- PNO-IV-80-035, on 801007,employee of Subcontractor Was Seriously Injured When Crane Boom Fell on Employee.Employee Suffered Multiple Fractures & Contusions & Was Immediately Taken to Hosp + (22:33:29, 25 December 2024)
- ML19336A352 + (22:33:30, 25 December 2024)
- PNO-IV-80-033, on 800929,near Bainville,Mt,Shipment of Three 100 Mci Sr-90/Y-90 Sources Was Involved in Railway Accident.Sources Will Not Be Accessible Until End of Wk. Preliminary Surveys Indicate No Detectable Contamination + (22:33:31, 25 December 2024)
- ML19336A350 + (22:33:32, 25 December 2024)
- ML19336A349 + (22:33:33, 25 December 2024)
- ML19336A347 + (22:33:34, 25 December 2024)
- ML19336A346 + (22:33:35, 25 December 2024)
- ML19336A345 + (22:33:38, 25 December 2024)
- ML19336A344 + (22:33:39, 25 December 2024)
- ML19336A343 + (22:33:41, 25 December 2024)
- ML19336A342 + (22:33:42, 25 December 2024)
- ML19336A340 + (22:33:44, 25 December 2024)
- ML19336A339 + (22:33:45, 25 December 2024)
- ML19336A337 + (22:33:46, 25 December 2024)
- ML19336A338 + (22:33:46, 25 December 2024)
- ML19336A336 + (22:33:47, 25 December 2024)
- ML19336A335 + (22:33:48, 25 December 2024)
- ML19336A332 + (22:33:49, 25 December 2024)
- ML19336A331 + (22:33:50, 25 December 2024)
- 05000366/LER-1980-136-01, /01T-0:on 800930,Bechtel Notified Util That Psw Div I Line Was Inadequately Supported When Subjected to OBE or DBE Loads.Caused by Failure to Install 3-directional Support.Support Installed + (22:33:52, 25 December 2024)
- 05000366/LER-1980-136, Forwards LER 80-136/01T-0 + (22:33:53, 25 December 2024)
- ML19336A327 + (22:33:54, 25 December 2024)
- ML19336A326 + (22:33:55, 25 December 2024)
- ML19336A325 + (22:33:56, 25 December 2024)
- ML19336A322 + (22:33:59, 25 December 2024)
- ML19336A323 + (22:33:59, 25 December 2024)
- ML19336A321 + (22:34:00, 25 December 2024)
- 05000339/LER-1980-066-03, /03L-0:on 801003,while Increasing Power,Neutron Flux Distribution Deviated from Axial Flux Difference Target Band.Caused by Xenon Accumulation in Upper Quadrants of Core Between Time of Rampdown & Power Ascension + (22:34:01, 25 December 2024)
- ML19336A319 + (22:34:03, 25 December 2024)
- ML19336A317 + (22:34:04, 25 December 2024)
- 05000339/LER-1980-066, Forwards LER 80-066/03L-0 + (22:34:05, 25 December 2024)
- 05000338/LER-1980-079-03, /03L-0:on 800920,normalized Axial Power Distribution Exceeded Limit by 0.8%.Caused by Rods Driven 213 Steps in Preparation for Flux Mapping at 211 Steps Resulting in Delta Flux Becoming Negative.Rods Withdrawn + (22:34:06, 25 December 2024)
- 05000338/LER-1980-079, Forwards LER 80-079/03L-0 + (22:34:08, 25 December 2024)