Forwards IE Insp Rept 50-333/80-09 on 800514-16 & Notice of Violation
ML19336A378
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/14/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19336A372 List:
References
NUDOCS 8010220671
Download: ML19336A378 (2)


See also: IR 05000333/1980009

Text

_ - _.

.

_ _ . .

_

_

V

-

g-

[pt# %g*

UNITED STATES

,

"g

NUCLEAR REGULATORY COMMISSION

,

j

g

REGION I

t

g.

638 PARK AVENUE

e

'

KING OF PRUS$4 A. PENN5Yl.VANI A 19406

.....

AUO 1 4

Docket No. 50-333

l

Power. Authority. of the State of New York

James A. FitzPatrick Nuclear Power Plant-

ATTN: . Mr. R. J. Pasternak

'

Resident Manager

'

P. 0.-Box 41

Lycoming, New York 13093

,

ibntlemen:

l

l

- Sub.iedt:

Inspection 50-333/80-09

i

This refers to the inspection conducted by Mr. J. Serabian of, this office on May

l

14-16, 1980 of activities authorized by NRC License No. DPR-59 and to the discussions

'

of our findings held.by Mr. Serabian with Mr. R. Pasternak and other members of

your staff at the conclusion of the inspection, and to a subsequent telephone

1

discussion between Mr. Serabian and Mr. E. Mulcahey on July 18 and 23,1980.

.

Areas exained during this inspection are described in the Office of Inspection

[

and Enforcement Inspection Report which is enclosed with this letter. Within

!-

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

~

T

. Based on the results of this inspection, it appears-that one of your activities

J

was not conducted in full compliance with NRC requirements, as set forth in the

~ Notice of Violation', enclosed herewith as Appendix A.

This item of noncompliance

j

has been categorized into the levels as described in our correspondence to you:

i

-dated December 31, 1974. This notice is sent to you pursuant to the provisions

l

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,-

1-

I

within twenty (20)- days of your receipt of this notice, a written' statement or

1) corrective steps which have been .taken by

you 'and.the results achieved; 2)(corrective steps which will be taken to avoid

explenation in reply including (:

[

4

!

further items of noncompliance;;and (3) the~ date when full compliance will be

achieved.

,

1

~

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title-

<

~ 10, Code of Federal Regulations, a copy of this letter and the enclo Jres will-

be placed in the NRC's Public-Document Room.

If this report contains any infor-

.'

mation that you.(or your. contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office .to withhold

,

.

such information from public disclosure. Any .such application must be accompanied

.

,

_

8 010220f g

.

-- -

.

-. .

.

- - . - -

--

--

.

..

.

i

Power Authority of the state.

'

,

of New York

2

MG 1 4W

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

r ight to be withheld shall be incorporated as far as possible into a separate

i et of the affidavit.

If we do not hear from you in this regard within the

s ecified period, the report will be placed in the Public Document Room.

r

' Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

2

Sincerely,

N'

.

eorge H. Smith, Chief

Fuel Facility and Material

Safety

Branch

-

Enclosures:

l '.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-333/80-09

cc w/ encl:

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

'

J. F. Davis, Chairman, Safety Review Comittee

C. M. Pratt, Assistant General Counsel

G. M. Wilverding, Manager-Nuclear Licensing

I

(

.

.

-

. _.

.-.