Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A764 + (10:18:27, 24 May 2025)
- ML20198A745 + (10:18:31, 24 May 2025)
- 05000302/LER-1997-045, :on 971205,discovered Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirements. Caused by Original Construction Error.Util Installed Necessary Supports to Return Valves to Seismic Class I + (10:18:32, 24 May 2025)
- ML20198A716 + (10:18:37, 24 May 2025)
- ML20198A643 + (10:19:12, 24 May 2025)
- IR 05000395/1985034 + (10:19:18, 24 May 2025)
- IR 05000382/1998017 + (10:19:22, 24 May 2025)
- IR 05000317/1996008 + (10:19:32, 24 May 2025)
- IR 05000321/1985028 + (10:19:45, 24 May 2025)
- 05000483/LER-1997-005-05, Forwards LER 97-005-05,re Situation in Which Surveillances Required by TS Were Missed Due to Misintepretation of SR, Per 10CFR50.73(a)(2)(i)(B) + (10:20:20, 24 May 2025)
- TAC:M93478 + (10:20:24, 24 May 2025)
- ML20198A226 + (10:21:06, 24 May 2025)
- ML20198A166 + (10:21:22, 24 May 2025)
- IR 05000416/1986004 + (10:21:50, 24 May 2025)
- ML20198A067 + (10:21:56, 24 May 2025)
- ML20198A055 + (10:22:01, 24 May 2025)
- 05000346/LER-1997-005-01, Forwards LER 97-005-01 to Document Completion of Corrective Actions Taken Re 970212 Event.Changes Are Marked W/Rev Bar in Right Margin + (10:22:19, 24 May 2025)
- ML20197K208 + (10:22:25, 24 May 2025)
- TAC:57804 + (10:22:27, 24 May 2025)
- ML20197K156 + (10:22:47, 24 May 2025)
- L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with + (10:22:53, 24 May 2025)
- NUREG/CR-4191, Advises That Nuclear Power Plant Control Room Habitability Survey (NUREG/CR-4191) Discussed at ACRS 303rd Meeting Showed Newer Control Room Sys Increasingly Complex W/Little or No Demonstrable Improvement in Meeting Actual Needs + (10:23:12, 24 May 2025)
- ML20197J994 + (10:23:32, 24 May 2025)
- IR 05000312/1986004 + (10:23:52, 24 May 2025)
- ML20197J860 + (10:24:00, 24 May 2025)
- TAC:M86432 + (10:24:16, 24 May 2025)
- ML20197J727 + (10:24:33, 24 May 2025)
- ML20197J701 + (10:24:37, 24 May 2025)
- IR 05000416/1986002 + (10:25:05, 24 May 2025)
- IR 05000454/1985042 + (10:25:10, 24 May 2025)
- 05000423/LER-1997-059, :on 970910,error Was Identified in BTP 9.5-1 Compliance Rept During Preparation of Design Change to Upgrade Pilot Solenoid Valve Associated W/Af.Caused by Design Deficiency.Design Mod Implemented + (10:25:14, 24 May 2025)
- ML20197J518 + (10:25:16, 24 May 2025)
- IR 05000454/1986010 + (10:25:19, 24 May 2025)
- TAC:53014 + (10:25:27, 24 May 2025)
- ML20197J415 + (10:25:46, 24 May 2025)
- ML20197J387 + (10:25:52, 24 May 2025)
- ML20197J367 + (10:25:58, 24 May 2025)
- 05000482/LER-1997-024, :on 971129,ESFs & RPS Actuations Occurred Due to Spike on ex-core Neutron Monitoring Sys Nuclear Instrument NI-35 Intermediate Range Channel.Investigated Causes & Stabilized Plant + (10:26:05, 24 May 2025)
- 05000482/LER-1997-023, :on 971124,failure to Maintain Both Containment Personnel Hatch Air Lock Doors Closed Was Noted.Caused by Inadequate Communications Due to Insufficient Detail in Procedures.Closed Door & Revised Procedures + (10:26:09, 24 May 2025)
- ML20197J144 + (10:27:09, 24 May 2025)
- 05000373/LER-1997-043, :on 971125,incomplete TS Surveillance on Div III Edgs,Was Determined.Caused by Inadequate Procedure Review.Dgs Declared Inoperable Until Methodology Developed to Adequately Satisfy Surveillance Requirements of TS + (10:27:13, 24 May 2025)
- ML20197J057 + (10:27:38, 24 May 2025)
- 05000482/LER-1997-021, :on 971119,inadequate Ssps Surveillance Testing Was Noted.Caused by Inadequate Original Test Design Supplied by Vendor.Performed Complete Review of Ssps for Similar Memory Configurations of Unique Logic Circuit Design + (10:27:46, 24 May 2025)
- TAC:42460 + (10:27:53, 24 May 2025)
- ML20197H965 + (10:28:17, 24 May 2025)
- 05000482/LER-1997-022, :on 971121,TT Instrumentation Surveillance Testing Was Not Performed Prior to Startup.Caused by Historical Mindset of Personnel Involved in Development of Procedures.New Procedure,Sts AC-003 Was Written + (10:28:21, 24 May 2025)
- 05000423/LER-1997-058, :on 971122,inadequate TSs Surveillances of Ssps Was Noted.Caused by Inadequate Owner Review During Plant Constr.Ssps Test Procedures Will Be Revised to Include Addl Testing Steps + (10:29:10, 24 May 2025)
- IR 05000029/1990016 + (10:29:25, 24 May 2025)
- 05000423/LER-1997-057, :on 971113, a EDG Was Declared Inoperable Due to Ventilation Alignment Prohibiting Tornado Recovery. Actuator for a Emergency Ventilation Sys Air Intake Damper Has Been Replaced W/Functional Actuator + (10:29:27, 24 May 2025)
- ML20197H642 + (10:29:49, 24 May 2025)
- IR 05000482/1990034 + (10:29:50, 24 May 2025)