Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-354/86-03. Corrective Actions Documented in Insp Repts 50-354/86-22 & 50-354/86-23 of Licensed Program
ML20197J701
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/09/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
References
NUDOCS 8605200152
Download: ML20197J701 (2)


See also: IR 05000354/1986003

Text

-

~ .,

,

-

7

-

.

t

MAY 0 S 1986

Docket No. 50-354

Public Service Electric & Gas Company

ATTN: Mr. C. A. McNeill, Jr.

Vice President - Nuclear

Post Office Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject: Inspection No. 50-354/86-03

This refers to your letter dated April 11, 1986, in response to our letter

dated March 14,1986.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions were examined during Inspections Report Nos.

50-354/86-22 and 50-354/86-23, of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

original 31: red B7: ,

Leo H. Bottonhausen

Stewart D. Ebneter, Director

Division of Reactor Safety

cc w/ encl:

P.' R. H. Landrieu, Vice President - Engineering (Newark)

R. S. Salvesen, General Manager, Hope Creek Operations

A. E. Giardino, Manager, Station Quality Assurance

R. L. Mitti, General Manager, Nuclear Assurance and Regulation

A. J. Pietrofitta, General Manager, Power Production Engineering,

Atlantic Electric

L. A. Reiter, General Manager - Licensing and Reliability

Rebecca A. Green, Bureau of Radiation Protection

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

8605200152 860509

PDR ADOCK 05000354

G PDR

OFFICIAL RECORD COPY RL HC - 0001.0.0

05/05/86

Y f\

+ + , a .x  :- 1

, *..

'd

,

P

,

bec w/ encl:

Region I Docket Room (with concurrences)

DRP Section Chief

.

i.

.

d

a

4

l

r

!

J

-

J

RI:DRS RI:DRS RI:0RS RI:DRS

Florek/emw W O Eselgroth Bettenhausen

i

5/F /86 5/886 5/ 8 /86 5/8/86

i b 0FFICIAL RECORD COPY RL HC - 0001.1.0

05/05/86

t

Oc'u

.

1

N

_ . , - , .- ,. ,_ ,- ,,.- ,. ,--,--. _.-_ _- - - - ,- ,,_v,-y , ,_.-- , _ _ - , , - , , , - _ . - . ...--__.-_,,..,_-,__......-7_,___.--_-_,-.

-.

,

.

..

.

k* -,

Pubhc Service

Electnc and Gas

Company

,

Corbin A. McNeill, Jr. Pubhc Service Electric and Gas Company P.O. Box 236, Hancocks Bndge NJ 08038 609 339-4800

Vics president -

Nuclear

April 11, 1986

U. S. Nuclear Regulatory Commission

Region I

631 Park Avenue

King of Prussia, PA 19406

'

Attention: Dr. Thomas E. Murley, Administrator

Office of Inspection and Enforcement

Gentlemen:

NRC INSPECTION REPORT #86-03

DOCKET NO. 50-354

HOPE CREEK GENERATING STATION

!

Public Service Electric and Gas Company (PSE&G) is in receipt

of your letter dated March 14, 1986 which transmitted a Notice

of Violation regarding a failure of test procedures to reflect

,

applicable regulatory requirements.

! Pursuant to the provisions of 10 CFR 2.201, our response to the

Notice of Violation is provided in Attachment 1.

Sincerely,

Attachment

C Office of Inspection and Enforcement

Division of Reactor Construction Inspection

Washington, D. C. 20555

'

NRC Resident Inspector

P. O. Box 241

Hancocks Bridge, NJ 08038

  • , .

-

%

.

ATTACHMENT 1

'f. *

10 CFR 2.201 INFORMATION

PUBLIC SERVICE ELECTRIC AND GAS

HOPE CREEK GENERATING STATION

RESPONSE TO NOTICE OF VIOLATION

Your letter dated March 14, 1986 identified one Violation of

10 CFR 50 Appendix B Criterion XI, Test Control. As stated

therein, the Violation was the result of a failure of test

procedures to incorporate all requirements and acceptance limits

contained in applicab,le design documents. Specifically, Startup

Test Procedure TE-SU.ZZ-041(Q) " Full Core Shutdown Margin Demon-

stration" Revision 0 was issued without completely addressing the

,

requirements of Regulatory Guide 1.68, Revision 2.

1. PUBLIC SERVICE ELECTRIC ANE GAS DOES NOT DISPUTE THE

VIOLATION.

2.

THE ROOT CAUSE OF THE VIOLATION WAS FAILURE OF THE PROCE-

DURE AUTHOR TO ADDRESS APPLICABLE REGULATORY REQUIREMENTS

ADEQUATELY IN PREPARING THE TEST PROCEDURE AND FAILURE

TO IDENTIFY THE NOTED DEFICIENCIES IN THE REVIEW AND

APPROVAL PROCESS. .

3. IMMEDIATE CORRECTIVE ACTIONS:

a) Revision 1 to test procedure TE-SU.ZZ-041(Q) was

issued on March 8, 1986 properly addressing each

of the identified deficiencies.

b) By January 31, 1986, the Power Ascension Manager

4

had counseled and reinstructed his personnel in their

responsibilities to ensure that the Power Ascension

Program and implementing procedures are in complete

compliance with the governing documents.

c) A Technical Review Board (TRB) was established within

the Power Ascension Department to provide a detailed

compliance review of all existing and future power

ascension test procedures. The TRB has completed its

review of all open-vessel test procedures.

4. LONG TERM CORRECTIVE ACTIONS:

a) A Power Ascension Test Matrix has been developed for

-

use in procedural development. This matrix facili-

tates the identification of applicable Regulatory

-

Guide 1.68 requirements and FSAR sections for each

test procedure.

b) By memo dated March 31, 1986, the Power Ascension

!

,

Manager advised all Power Ascension personnel of the

nature of this violation and our corrective actions.

5. FULL COMPLIANCE WAS ACHIEVED ON MARCH 31, 1986.

, -