ML20198A067
| ML20198A067 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/16/1997 |
| From: | Terry C, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20197J100 | List: |
| References | |
| TXX-97263, NUDOCS 9801050282 | |
| Download: ML20198A067 (1) | |
Text
,
0 M-Li
--I7 Fiis 10010.2
~
3 Ref. y 10CFR50.36 WELECTRIC' December 16, 1997 C. I.ance Terry ca,, w e,,,.aa.,
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 2055S
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 HONTHLY OPERATING REPORT FOR NOVEMBER 1997 Attached is the Monthly Operating Report for November,1997, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSES Units 1 and 2, Operating License Nos. NPF 87 and NPF 89, respectively.
During this reporting period, there ha'/e been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Units 1 and Unit 2.
Please note a typographical error was made in the October, 1997 Honthly Operating Report. The LER for the Unit 1 Reactor trip was referenced on page four as LER 445/97 008, it should have been LER 445/97 009.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Should you have any questions, please contact Douglas W. Snow at (254) 897 8448.
Sincerely, e,J </s' @
C. L. Terry By: 84 N8 ~
Ro'g'e(b. Walker Regulatory Affairs Manager
~DWS/grp.
Attachment 4
c-Mr. E. W. Herschoff. Region IV
{g3L,'
I Mr. J. I. Tapia, Region IV Hr.
'.'J. Polich, NRR Resident Insnectors g"";yg'",g' 9901050282 971216 e'm ADOCK O 45 g'
g,
- r. O. Box 1002 GlenRoseTexas 7fo83 t