ML20197K208

From kanterella
Jump to navigation Jump to search
Insp Repts 50-498/86-04 & 50-499/86-04 on 860210-0313. Violation noted:120-volt Ac Panel 3E241EDP001 Not Properly Inspected to Verify That Field Welds Installed Per Instructions
ML20197K208
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/05/1986
From: Bess J, Ireland R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20197K199 List:
References
50-498-86-04, 50-498-86-4, 50-499-86-04, 50-499-86-4, NUDOCS 8605200294
Download: ML20197K208 (8)


See also: IR 05000498/1986004

Text

_ _ _ _ _ _ _ _

'

.

APPENDIX B

'~

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report: 50-498/86-04

50-499/86-04

Dockets: 50-498 Permits: CPPR-128

50-499 CPPR-129

Licensee: Houston Lighting & Power Company (HL&P)

P. O. Box 1700

Houston, Texas 77001

Facility Name: South Texas Project (STP), Units 1 and 2

Inspection At: South Texas Project, Matagorda County, Texas

Inspection Conducted: February 10 through March 13, 1986

Inspector: . t. D 4A6/f6

(J. E. Bess, Reactor Inspector, Engineering D&te'

Section

Approved:

h b mW

R . E. Ireland, Chief, Engineering Section

(/f/F4

D' ate /

Inspection Summary

Inspection Conducted February 10 through March 13, 1986 (Report 50-498/86-04;

50-499/86-04)

Areas Inspected: Routine, announced inspection of construction activities

including site tour; observation of safety-related electrical equipment, review

of QA records for the receipt and storage, handling and in-process installation

of electrical equipment and components and personnel qualifications.

Results: Within the three areas inspected, one violation was identified (see

paragraph 3).

B605200294

DR 860512

ADOCK 05000498

PDR

. ..

- - _ _ . _ _ _ _ _ _ _ _ _ -

'

.

-2-

DETAILS

.

-1. Persons Contacted

Principal Licensee Employees

G. B. Rogers, Construction Manager

F. Karpinski, Construction Supervisor

  • S. Head, Project Compliance Group
  • T. J. Jordan, Project QA Manager
  • J. T. Westermeier, Project Manager

Other Personnel

Bechtel Power Corporation

  • T. D. Robertson, Construction Manager
  • R. W. Miller, Deputy PQAM
  • R. H. Medina, Lead QA Engineer

L. Davis, Construction Manager

EBASCO Service Inc.

R. Peck, QA Site Supervisor

The NRC inspector also interviewed other licensee and contractor employees

during the course of the inspection.

  • Denotes those attending the exit interview.

2. Site Tour

The NRC inspector toured the reactor building, control room and auxiliary

building for Units 1 and 2 to observe construction in progress and to

inspect housekeeping.

No violations or deviations were identified.

3. Observation of Safety-Related Electrical Equipment

The NRC inspector selected several examples of electrical equipment and

components for examination. The examination consisted of verifying that

the field installation agreed with applicable design drawings and that

separation and protection requirements were being met. The following

equipment and components were inspected:

o 125 VDC Battery Charger (CIDJBC047G)

o 125 VDC Battery Charger (BIDJBCD47E)

o 125 VDC Battery Charger (DIDJBC047D)

'

.

-3-

o 7.5 KVA/ Static Inverter (AIVAIV1202)

o 25 KVA Inverter / Rectifier (CIVAIV002)

o 120 VAC Distribution Panel AIVADP001) (3E241EDP001)

o 120 VAC Distribution Panel CIVADP002)

o -120 VAC Distribution Panel DIVADP1202)

o 480 VAC MCC (CIPf91 CEC 4)

o 480 VAC MCC (BIPMMCEB4)

o Electrical Penetration - 3E261EEP009

o Electrical Penetration - 3E261EEP0016

o Electrical Penetration - 3E261EEP0018

o Electrical Penetration - 3E261EEP0020

o Electrical Penetration - 3E261EEP0027

o Electrical Penetration - 3E261EEP0029

o Electrical Penetration - 3E261EEP0043

o Electrical Penetration - 3E261EEP0047

o Electrical Penetration - 3E261EEP0054

o Electrical Penetration - 3E261EEP0061

The NRC inspector visually inspected the electrical equipment and

components listed above. During this visual inspection, the NRC inspector

found one deficiency. The 120 VAC Distribution Panel identified as

3E241EDP001 had been signed off as completed according to installation

records. All required documentation indicated that this panel was

completely installed. However, a review of "as built" drawing

14926-4363-00001, Revision 5 (S.0.5647-C1) indicated that the referenced

panel had not been properly inspected to verify that field welds were

installed in accordance with instructions.

This is an apparent violation of Criterion X of 10 CFR Part 50, Appendix B

(498/8604-01).

4. Review of Safety-Related Electrical Equipment Records

The NRC inspector reviewed Bechtel and EBASCO quality assurance (QA)

inspection reports to determine whether adequate documentation existed to

control electrical equipment activities in the following areas:

(a) receipt inspection and storage, (b) handling and in-process

installation, and (c) qualification and training of craft personnel,

a. Receipt Inspection and Storage

The NRC inspector examined Bechtel QA documentation pertaining to the

receipt inspection and storage of electrical equipment. The records

examined appeared adequate to ensure that incoming electrical

equipment conforms to purchase specifications, and is properly stored

to protect against construction damage and adverse environmental

conditions. The documents and records examined are listed below:

o P.O.-14926-4362 - Class 1E 120 VAC Distribution Panels,

-

.

-4-

Tag: 3E241EDP001, 3E241EOP002, and 3E241EDP1202.

o Receiving Inspection Planning for Permanent Plant Items (4179)

Item: Class 1E AC & DC Distribution Panels.

o P.O.-14926-4337 - Class 1E 480V Motor Control Centers.

o Receiving Inspection Planning for Permanent Plant Items (4337)

Item: 480 VAC Class 1E Motor Control Centers.

o P.O.-14926-4353 - Inverter / Rectifier.

o Receiving Inspection Planning for Permanent Plant Items (4353)

Item: Inverter / Rectifier.

O P.O.-14926-4100 - Battery Charger.

o Receiving Inspection Planning for Permanent Plant Items (4100)

Item: Battery Chargers.

o Surveillance Record for Housekeeping WPP/QCI 13.0.

o Storage Inspection Report WPP/QCI 12.0.

o Material Received Record - 58824, 7.5 KVA Inverter.

o Westinghouse Quality Release - 39925, Instrument Power Supply

Inverters.

o Nonconformance Report (NCR) S-G587.

In the areas reviewed the records confirmed that:

(1) Identification appears on electrical components and receiving

documentation.

(2) Physical conditions (such as damage, deterioration, etc.) were

identified and documented.

(3) Nonconforming component items placed in storage were identified

as required.

(4) Components were stored in proper storage level designation.

(5) Storage conditions (temperature, humidity and cleanliness) are

controlled and monitored as specified by specification.

(6) In place storage requirements were satisfied.

No violations or deviations were identified.

i

,.

-

- - ~ - - -

-

'

.

-5-

b. Handling and In-Process Installation

The NRC inspector examined EBASCO QA documentation and records

pertaining to'the handling and in process installation of electrical

equipment. The documents examined appeared adequate to ensure that

current procedures and specifications are being used by craftsmen.

The documents and records examined are listed below:

o EBASCO Electrical Installation Inspection Report No. I-0087-E-1,

Item: 125 VDC Battery Charger, S/N 14530-102

o EBASCO Electrical Installation Inspection Report No. I-0090-E-1,

Item: 124 VDC Battery Charger, S/N 14529-106

o EBASCO Electrical Installation Inspection Report No.-I-0071-E-1,

Item: 125 VDC Battery Charger, S/N 14529-104

o EBASCO Electrical Installation Inspection Report No. I-0073-E-1,

Item: 7.5 KVA AC Static Inverter, S/N 30K2311-2

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0115-E-1, Item: Inverter / Rectifier, S/N 141

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0048-E-1, Item: 120 VAC Vital Distribution Panel

3E241EDP001

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0039-E-1, Item: 120 VAC Vital Distribution Panel -

3E241EDP002

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0067-E-1, Item: 120 VAC Vital Distribution Panel -

3E241EDP1202

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0113-E-1, Item: Motor Control Center - BIPMMCEB4

o EBASCO Electrical Equipment Installation Inspection Report

No. I-0114-E-1, Item: Motor Control Center - CIPMMCEC4

o AWS D1.1 Structural Welding Inspection Report No. 1-00706

o AWS D1.1 Structural Welding Inspection Report No. 1-00836

o AWS 01.1 Structural Welding Inspection Report No. 1-00810

o EBASCO Stud Welding Inspection Report No. 044 SWI

l

l

l

l _

l

.

-6-

l

l

0 EBASCO Quality Control Inspection Report No. G-0094-E-1

o AWS D1.1 Structural Welding Inspection Report No. 1-00809

o EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00902

o EBASCO AWS Dl.1 Structural Welding Inspection Report No. 1-00838

o EBASCO AWS D1.1 Structural Welding Inspection P.eprot No. 1-00837

o EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00901

In the areas reviewed the records indicate that:

(1) The components are installed in the proper location by qualified

craft personnel.

(2) The latest approved drawings, specifications and procedures were

available and used by craft personnel.

(3) The components identification is properly established and

maintained.

(4) Licensee and contractors inspections are performed and QC hold

points observed.

(5) Nonconformances are identified and handled in accordance with

established procedures.

No violations or deviations were identified.

c. Qualification and Training of Craft Personnel

The NRC inspector reviewed the qualification records of four EBASCO

craft personnel associated with the installation of electrical

components and equipment. The records were reviewed to ascertain

whether the craft personnel records were complete and up-to-date and

whether the craft personnel were qualified for their duties at the

time of the inspections.

No violations or deviations were identified.

5. Exit Interview

The NRC inspector met with licensee representatives (denoted in

paragraph 1) and Mr. C. Johnson, the NRC Senior Resident Inspector on

March 13, 1986, and summarized the scope and finding of the inspection.

l \

NRcFOR7e6 . U.S. NUCLEAR REGULATORY COMMISSION PRINCIPALINSPECTOR I Name <ast %st andmdac eaa

191 81) ,

if MC 0535 g*g ^^-

INSPECTOR'S REPORT REVIEWER

Office of Inspection and Enforcement

thSPECTORS

sp/ E. f$6s

"# $ REPO U NEMINSPEC DATE

LICENSEE / VENDOR yy, DOCKET NO i8d9tsiOR LICENSE

NO I8v PRODUCTS l13 agens NO YR

SEQ MO

k/_)U gg ilb s& h 0 $0 0 O h $ $ D 0 Y "

J J M - MODsF1

9 f g g g y j j j g o 4 n

[6L4 by' (_#4n14/Jjvg _

D - DELETE C

R REPLACE [8

H L1P v n' 's iS to

PE JOD OF INVES TIGA TIQN!1NSPECTON INSPECTION PERFORMED By ORGAN 12ATON (CCE OF REGON/HQ CONDUCT.

  • # # '

F MOM 70 A 1 - REGIONAL OFFICE STAFF OTHER wy-Weeuy Marrower R etwhng kv code )

MO. DI.V VR MO DAY YR 2 RESIDENTINSPECTOR .__ REGION ,

Ov50N EBRANCH

Old /fC 8l0 O l.3 /h 8 l(o 3 - PERFORMANCE APPRAISAL TEAM g l g lp

-

'3 N

'

31 - -M 33 l 34 35

l

REGIONAL ACTION TYPE OF ACTivW CONDUCTED ' Check oae ces omv i

'O '"* # # X 02 - S AFETY 06 - MGMT V6 SIT 10 - PLANT SEC. 14 - INQUIRV

i-N C FORM set 03 - iNC DENT 07 - SPECIAL 11 - INVENT VER 15 - INVESTIG ATION

A 2 - TEGONAL OFFICE LETTER 04 - ENFORCEMENT 08 - VENDOR 12 - SMrPMENT EXPORT

05 - MGMT. AUDif 09 - MAT ACCT. 13. iMPOR T

N *

37 2

.N5PECT6GN. aNv ESTiG A reGN F+NDeNGS rGTAL NUMBER REPORT CONTAiN 2 730

    • ENFORCEMENT CONF ERENCE LETTER OF RE PO 47 TR ANSM'TTAL DATE

OF VOLArONS AND MELD INFOR M A TION

A B C D DEvi Af TON'

NRC FORfA 591 REPORTSENT

1 - CLEAR OR red TOHQ FOR

LE TTEn iS iUED ACTION

g 2 - VOLATON

3 - DEVIATON A B C D Al8 C D A B C D MO DAv vm MO DAV VR

4 - VOLATON 4 0EVIATON og , , , l 1 vES 1 - VES CIS / 12 /b I I I

3. ,

40 4E ' 42 43 44 99 50 $$

MODutt INFORM A riON Moout E .NF cRM A r.oN

8 ',0

9 MODULE NUM6ER INSP

dg g MODULE REO FOLLOWUP HEC g MODULE NUM9ER rNSP yz MODULE REO FOLLOWUP

"'

EO NO

E E

( E

r

i s !s!

1 1 .

!!

s:I!m.bd!e!!!!!!

me r e: 1 . -  :!! .

ss -  !. .! .!! -

!! sEI!ish.!!!

- = n e-_ ---  !!!!! !!

-< -

!

-

e i $ 3iOhiOlh b OiOi.1 i i i lii 8 i l i i l i i l i lil I

i i i n i liil a

i i i i i IiiI

c

s i i i i liil c

i i i i i liil

I

C

i i i i i liiI U

i I i i i il i i

8 I il 0 is th l ^

f toi% 0,8i0 i liiIe e i liiI^ l i e i i IiiI

ii i i i liil *

i i i i i liil

c c

ii i , i i i i i , , i i i I

i, i , ,

l,,I o

i i , , i I,,I

e i i liil^ ii , i i liiIe i i liiI^ i i i i i liiI

'

ii i i i liil -

i i i i i It i t ._

c

,

i, , i i liil i i e i i IiiI

ii , i i liil c

i i i i i liiI

a i i liil^ ii ii i liil- i i liiI^ i i i i I i liil

'

i, i, i I,il *

i , >> i liil

i, ,i i li, i i i i i f i  !

O CtECLE SEQUE NCE #F

O i i

V'Ot af CN OR O* V' A fiON l l { l l

.

l p l

_

.in h I , ,am , , ,. ,... ,, e, o, w.n .. ,, ., .. . m- T.

nac ro,au m A - RENRr MOOWE MBER

oocxEr noPRooverni3

<e os. . oA u.cansg

l"yy moasy a o'* no sea /11611 lo 15 h$1

INSPECTOR'S REPORT C' 5 e o O O 9 8 F 6 oW *

votc' 5"a'" o" o"T** l ML

e

(Continuation) , , , , , , , ,c

Office of Inspection and Enforcement C

v p ae

_-

DOLAllON OR Otv1A TION Uinter up to 2400 characters nor each stem. If the rest escoeds this number, It wal De necessary to caraphrase Limot lines to 50 characters eacn3

t.

2

3.

4

Failure to Properly Inspect

,

Criterion X of Appendix B to 10 CFR Part 50 requires that activities

affecting quality be subjected to an inspection program to verify

conformance with the documented instructions, procedures and drawings for

, accomplishing the activity. This requirement is amplified by the approved

Quality Assurance Plan Description (QAPD) for the South Texas Project. -

i0.

,,. QCP 10.15, Revision 3, paragraph 5.2.3.B states that the Quality Control

Inspector (QCI) shall verify all field welds required have been inspected

and accepted by recording the completed acceptable welding inspection

is report number on the installation inspection package.

Contrary to the above, the weld configuration on Panel 3E241EDP001

is- differed from the weld configuration shown on "as built" drawing

14926-4362, indicating that the panel installation had not been properly

inspected to verify that the field welds were in accordance with

n instructions.

This is a Severity Level IV violation (Supplement IE) (498/8604-01).

i.

20- i

__

2i

l 22. ~

23

24

25

. __26

71

D

29

m

11

12

,

" .

-

i _

y ss

i U.S. NUCLEAR REGULATORY COMMISSloN