APPENDIX B
'~
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-498/86-04
50-499/86-04
Dockets: 50-498
Permits: CPPR-128
50-499
CPPR-129
Licensee: Houston Lighting & Power Company (HL&P)
P. O. Box 1700
Houston, Texas 77001
Facility Name:
South Texas Project (STP), Units 1 and 2
Inspection At:
South Texas Project, Matagorda County, Texas
Inspection Conducted:
February 10 through March 13, 1986
Inspector:
. t. D
4A6/f6
(J. E. Bess, Reactor Inspector, Engineering
D&te'
Section
b
mW
(/f/F4
h
. E. Ireland, Chief, Engineering Section
Approved:
R
D' ate /
Inspection Summary
Inspection Conducted February 10 through March 13, 1986 (Report 50-498/86-04;
50-499/86-04)
Areas Inspected:
Routine, announced inspection of construction activities
including site tour; observation of safety-related electrical equipment, review
of QA records for the receipt and storage, handling and in-process installation
of electrical equipment and components and personnel qualifications.
Results: Within the three areas inspected, one violation was identified (see
paragraph 3).
B605200294 860512
DR
ADOCK 05000498
.
..
- - _ _
. _ _ _ _ _ _ _ _ _
-
'
.
-2-
DETAILS
.
-1.
Persons Contacted
Principal Licensee Employees
G. B. Rogers, Construction Manager
F. Karpinski, Construction Supervisor
- S. Head, Project Compliance Group
- T. J. Jordan, Project QA Manager
- J. T. Westermeier, Project Manager
Other Personnel
Bechtel Power Corporation
- T. D. Robertson, Construction Manager
- R. W. Miller, Deputy PQAM
L. Davis, Construction Manager
EBASCO Service Inc.
R. Peck, QA Site Supervisor
The NRC inspector also interviewed other licensee and contractor employees
during the course of the inspection.
- Denotes those attending the exit interview.
2.
Site Tour
The NRC inspector toured the reactor building, control room and auxiliary
building for Units 1 and 2 to observe construction in progress and to
inspect housekeeping.
No violations or deviations were identified.
3.
Observation of Safety-Related Electrical Equipment
The NRC inspector selected several examples of electrical equipment and
components for examination.
The examination consisted of verifying that
the field installation agreed with applicable design drawings and that
separation and protection requirements were being met.
The following
equipment and components were inspected:
o
125 VDC Battery Charger (CIDJBC047G)
o
125 VDC Battery Charger (BIDJBCD47E)
o
125 VDC Battery Charger (DIDJBC047D)
'
.
-3-
o
7.5 KVA/ Static Inverter (AIVAIV1202)
o
25 KVA Inverter / Rectifier (CIVAIV002)
o
120 VAC Distribution Panel
AIVADP001)
(3E241EDP001)
o
120 VAC Distribution Panel
CIVADP002)
o
-120 VAC Distribution Panel
DIVADP1202)
o
o
480 VAC MCC (BIPMMCEB4)
o
Electrical Penetration - 3E261EEP009
o
Electrical Penetration - 3E261EEP0016
o
Electrical Penetration - 3E261EEP0018
o
Electrical Penetration - 3E261EEP0020
o
Electrical Penetration - 3E261EEP0027
o
Electrical Penetration - 3E261EEP0029
o
Electrical Penetration - 3E261EEP0043
o
Electrical Penetration - 3E261EEP0047
o
Electrical Penetration - 3E261EEP0054
o
Electrical Penetration - 3E261EEP0061
The NRC inspector visually inspected the electrical equipment and
components listed above. During this visual inspection, the NRC inspector
found one deficiency. The 120 VAC Distribution Panel identified as
3E241EDP001 had been signed off as completed according to installation
records. All required documentation indicated that this panel was
completely installed. However, a review of "as built" drawing
14926-4363-00001, Revision 5 (S.0.5647-C1) indicated that the referenced
panel had not been properly inspected to verify that field welds were
installed in accordance with instructions.
This is an apparent violation of Criterion X of 10 CFR Part 50, Appendix B
(498/8604-01).
4.
Review of Safety-Related Electrical Equipment Records
The NRC inspector reviewed Bechtel and EBASCO quality assurance (QA)
inspection reports to determine whether adequate documentation existed to
control electrical equipment activities in the following areas:
(a) receipt inspection and storage, (b) handling and in-process
installation, and (c) qualification and training of craft personnel,
a.
Receipt Inspection and Storage
The NRC inspector examined Bechtel QA documentation pertaining to the
receipt inspection and storage of electrical equipment. The records
examined appeared adequate to ensure that incoming electrical
equipment conforms to purchase specifications, and is properly stored
to protect against construction damage and adverse environmental
conditions. The documents and records examined are listed below:
o
P.O.-14926-4362 - Class 1E 120 VAC Distribution Panels,
-
.
-4-
Tag: 3E241EDP001, 3E241EOP002, and 3E241EDP1202.
o
Receiving Inspection Planning for Permanent Plant Items (4179)
Item: Class 1E AC & DC Distribution Panels.
o
P.O.-14926-4337 - Class 1E 480V Motor Control Centers.
o
Receiving Inspection Planning for Permanent Plant Items (4337)
Item: 480 VAC Class 1E Motor Control Centers.
o
P.O.-14926-4353 - Inverter / Rectifier.
o
Receiving Inspection Planning for Permanent Plant Items (4353)
Item: Inverter / Rectifier.
O
P.O.-14926-4100 - Battery Charger.
o
Receiving Inspection Planning for Permanent Plant Items (4100)
Item: Battery Chargers.
o
Surveillance Record for Housekeeping WPP/QCI 13.0.
o
Storage Inspection Report WPP/QCI 12.0.
o
Material Received Record - 58824, 7.5 KVA Inverter.
o
Westinghouse Quality Release - 39925, Instrument Power Supply
Inverters.
o
Nonconformance Report (NCR) S-G587.
In the areas reviewed the records confirmed that:
(1) Identification appears on electrical components and receiving
documentation.
(2) Physical conditions (such as damage, deterioration, etc.) were
identified and documented.
(3) Nonconforming component items placed in storage were identified
as required.
(4) Components were stored in proper storage level designation.
(5) Storage conditions (temperature, humidity and cleanliness) are
controlled and monitored as specified by specification.
(6) In place storage requirements were satisfied.
No violations or deviations were identified.
i
,.
-
or-
-y,
e,,,,-
- - ,
-,---,--,,-,,,,,,,,-n,,--
- - ~ - - -
eg,,
, , - -
-,, e
, , , -,-a
,, - - , - -,, - - - - . >
, -
,,,-
-
'
.
-5-
b.
Handling and In-Process Installation
The NRC inspector examined EBASCO QA documentation and records
pertaining to'the handling and in process installation of electrical
equipment.
The documents examined appeared adequate to ensure that
current procedures and specifications are being used by craftsmen.
The documents and records examined are listed below:
o
EBASCO Electrical Installation Inspection Report No. I-0087-E-1,
Item: 125 VDC Battery Charger, S/N 14530-102
o
EBASCO Electrical Installation Inspection Report No. I-0090-E-1,
Item: 124 VDC Battery Charger, S/N 14529-106
o
EBASCO Electrical Installation Inspection Report No.-I-0071-E-1,
Item: 125 VDC Battery Charger, S/N 14529-104
o
EBASCO Electrical Installation Inspection Report No. I-0073-E-1,
Item: 7.5 KVA AC Static Inverter, S/N 30K2311-2
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0115-E-1, Item: Inverter / Rectifier, S/N 141
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0048-E-1, Item: 120 VAC Vital Distribution Panel
3E241EDP001
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0039-E-1, Item: 120 VAC Vital Distribution Panel -
3E241EDP002
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0067-E-1, Item: 120 VAC Vital Distribution Panel -
3E241EDP1202
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0113-E-1, Item: Motor Control Center - BIPMMCEB4
o
EBASCO Electrical Equipment Installation Inspection Report
No. I-0114-E-1, Item: Motor Control Center - CIPMMCEC4
o
AWS D1.1 Structural Welding Inspection Report No. 1-00706
o
AWS D1.1 Structural Welding Inspection Report No. 1-00836
o
AWS 01.1 Structural Welding Inspection Report No. 1-00810
o
EBASCO Stud Welding Inspection Report No. 044 SWI
l
l
l
l
_
.
-6-
0
EBASCO Quality Control Inspection Report No. G-0094-E-1
o
AWS D1.1 Structural Welding Inspection Report No. 1-00809
o
EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00902
o
EBASCO AWS Dl.1 Structural Welding Inspection Report No. 1-00838
o
EBASCO AWS D1.1 Structural Welding Inspection P.eprot No. 1-00837
o
EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00901
In the areas reviewed the records indicate that:
(1) The components are installed in the proper location by qualified
craft personnel.
(2) The latest approved drawings, specifications and procedures were
available and used by craft personnel.
(3) The components identification is properly established and
maintained.
(4) Licensee and contractors inspections are performed and QC hold
points observed.
(5) Nonconformances are identified and handled in accordance with
established procedures.
No violations or deviations were identified.
c.
Qualification and Training of Craft Personnel
The NRC inspector reviewed the qualification records of four EBASCO
craft personnel associated with the installation of electrical
components and equipment.
The records were reviewed to ascertain
whether the craft personnel records were complete and up-to-date and
whether the craft personnel were qualified for their duties at the
time of the inspections.
No violations or deviations were identified.
5.
Exit Interview
The NRC inspector met with licensee representatives (denoted in
paragraph 1) and Mr. C. Johnson, the NRC Senior Resident Inspector on
March 13, 1986, and summarized the scope and finding of the inspection.
l
\\
U.S. NUCLEAR REGULATORY COMMISSION
NRcFOR7e6
PRINCIPALINSPECTOR Name <ast %st andmdac eaa
I
.
191 81)
,
if MC 0535
g*g
^ ^ -
INSPECTOR'S REPORT
REVIEWER
Office of Inspection and Enforcement
thSPECTORS
/
sp E. f$6s
"#
$
REPO U
NEMINSPEC DATE
LICENSEE / VENDOR
DOCKET NO i8d9tsiOR LICENSE
yy,
NO I8v PRODUCTS l13 agens
NO
SEQ
MO
YR
k/_)U
gg
ilb s&
h
0 $0
0
O h
$
$ D
0
Y
"
J
J
M - MODsF1
9 f g g g y
j j
j g
o 4
n
[6L4 by'
(_#4n14/Jjvg
_
D - DELETE
C
R
REPLACE
[8
H L1P
v
n'
's
iS
to
PE JOD OF INVES TIGA TIQN!1NSPECTON
INSPECTION PERFORMED By
ORGAN 12ATON (CCE OF REGON/HQ CONDUCT.
'
F MOM
70
A
1 - REGIONAL OFFICE STAFF
OTHER
wy-Weeuy Marrower R etwhng kv code )
MO.
DI.V
VR
MO
DAY
YR
2 RESIDENTINSPECTOR
.__ REGION
,
Ov50N
EBRANCH
Old /fC 8l0
O l.3 /h 8 l(o
3 - PERFORMANCE APPRAISAL TEAM
g
l g
lp
-
-
'
-M
33
l
34
l
'3
N
31
35
REGIONAL ACTION
TYPE OF ACTivW CONDUCTED ' Check oae ces om i
v
'O '"* # #
X
02 - S AFETY
10 - PLANT SEC.
14 - INQUIRV
i-N C FORM set
03 - iNC DENT
07 - SPECIAL
11 - INVENT VER
15 - INVESTIG ATION
A
2 - TEGONAL OFFICE LETTER
04 - ENFORCEMENT
08 - VENDOR
12 - SMrPMENT EXPORT
05 - MGMT. AUDif
09 - MAT ACCT.
13. iMPOR T
N
37 2
.N5PECT6GN. aNv ESTiG A reGN F+NDeNGS
rGTAL NUMBER
ENFORCEMENT CONF ERENCE
REPORT CONTAiN 2 730
LETTER OF RE PO 47 TR ANSM'TTAL DATE
OF VOLArONS AND
MELD
INFOR M A TION
A
B
C
D
DEvi Af TON'
NRC FORfA 591
REPORTSENT
1 - CLEAR
OR red
TOHQ FOR
LE TTEn iS iUED
ACTION
g
2 - VOLATON
3 - DEVIATON
A
B
C
D
Al8
C
D
A
B
C
D
MO
DAv
vm
MO
DAV
VR
l
1 vES
1 - VES
CIS / 12 /b
I
I
I
4 - VOLATON 4 0EVIATON
og
,
,
,
3.
40 4E '
42
43
44
99
50
$$
,
MODutt INFORM A riON
Moout E .NF cRM A r.oN
8 ',0
MODULE NUM6ER INSP
dg g
MODULE REO FOLLOWUP
HEC
MODULE NUM9ER rNSP
yz
MODULE REO FOLLOWUP
9
g
E
E
(
NO
E
"'
!s! !! s:I!m.bd!e!!!!!! :!!
!. .! .!! !! sEI!ish.!!! !!!!! !!
!
i s
ss
r
- 1
1
me
r
e:
1
. -
.
-
= n
e-_
---
-<
.
-
-
-
-
e
i $ 3iOhiOlh b
OiOi.1
i i
i lii
lil I
8
i
l
i i
l i
i l
i
liil
IiiI
a
i i
i i
i
i i
i n
i
liil
i i
i i
i liil
c
c
s i
i i
i
liiI
il
i
C
U
i I
i i
i
i i
i i
i
i
I
il 0 is th l
^
f toi% 0,8i0
i liiIe
liiI^
IiiI
8
I
e
i
l i
e i
i
liil
liil
i i
i i
i
ii
i i
i
I
c
c
ii
i ,
i
i i
i i
, ,
i
i i
l,,I
I,,I
o
i,
i ,
,
i i
, ,
i
liil^
liiIe
liiI^
liiI
e
i
i
ii
, i
i
i
i
i i
i i
i
liil
i i
i i
i It i t ._
'
-
ii
i i
i
liil
IiiI
c
i,
, i
i
i i
e i
i
,
liil
liiI
c
i i
i i
i
ii
, i
i
liil^
liil-
liiI^
I
liil
a
i
i
ii
ii
i
i
i
i i
i i
i
'
I,il
liil
i,
i,
i
i ,
> >
i
li,
!
i,
,i
i
i i
i i
i
f i
O CtECLE SEQUE NCE #F
i
i
O
l
l
{ l l
.
l p
l
.in h I ,
,am , ,
, .
,...
,, e,
o, w.n
..
,,
.,
..
.
m-
T.
nac ro,au m A -
oocxEr no <e os. . oA u.cansg
RENRr
MOOWE MBER
l"yy
moasy PRooverni3 a o'*
no
sea /11611 lo 15 h$1
INSPECTOR'S REPORT
C' 5 e o O O 9 8
F 6 oW
votc' 5"a'" o" o"T** l ML
(Continuation)
e
,
,
,
,
,
,
,
,c
Office of Inspection and Enforcement
v
p
a e _-
C
DOLAllON OR Otv1A TION Uinter up to 2400 characters nor each stem. If the rest escoeds this number, It wal De necessary to caraphrase Limot lines to 50 characters eacn3
t.
2
3.
4
Failure to Properly Inspect
Criterion X of Appendix B to 10 CFR Part 50 requires that activities
,
affecting quality be subjected to an inspection program to verify
conformance with the documented instructions, procedures and drawings for
accomplishing the activity.
This requirement is amplified by the approved
,
Quality Assurance Plan Description (QAPD) for the South Texas Project.
-
i0.
QCP 10.15, Revision 3, paragraph 5.2.3.B states that the Quality Control
, , .
Inspector (QCI) shall verify all field welds required have been inspected
and accepted by recording the completed acceptable welding inspection
report number on the installation inspection package.
is
Contrary to the above, the weld configuration on Panel 3E241EDP001
differed from the weld configuration shown on "as built" drawing
is-
14926-4362, indicating that the panel installation had not been properly
inspected to verify that the field welds were in accordance with
n
instructions.
This is a Severity Level IV violation (Supplement IE) (498/8604-01).