Insp Repts 50-498/86-04 & 50-499/86-04 on 860210-0313. Violation noted:120-volt Ac Panel 3E241EDP001 Not Properly Inspected to Verify That Field Welds Installed Per Instructions
ML20197K208
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/05/1986
From: Bess J, Ireland R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20197K199 List:
References
50-498-86-04, 50-498-86-4, 50-499-86-04, 50-499-86-4, NUDOCS 8605200294
Download: ML20197K208 (8)


See also: IR 05000498/1986004

Text

_ _ _ _ _ _ _ _

'

.

APPENDIX B

'~

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-498/86-04

50-499/86-04

Dockets: 50-498

Permits: CPPR-128

50-499

CPPR-129

Licensee: Houston Lighting & Power Company (HL&P)

P. O. Box 1700

Houston, Texas 77001

Facility Name:

South Texas Project (STP), Units 1 and 2

Inspection At:

South Texas Project, Matagorda County, Texas

Inspection Conducted:

February 10 through March 13, 1986

Inspector:

. t. D

4A6/f6

(J. E. Bess, Reactor Inspector, Engineering

D&te'

Section

b

mW

(/f/F4

h

. E. Ireland, Chief, Engineering Section

Approved:

R

D' ate /

Inspection Summary

Inspection Conducted February 10 through March 13, 1986 (Report 50-498/86-04;

50-499/86-04)

Areas Inspected:

Routine, announced inspection of construction activities

including site tour; observation of safety-related electrical equipment, review

of QA records for the receipt and storage, handling and in-process installation

of electrical equipment and components and personnel qualifications.

Results: Within the three areas inspected, one violation was identified (see

paragraph 3).

B605200294 860512

DR

ADOCK 05000498

PDR

.

..

- - _ _

. _ _ _ _ _ _ _ _ _

-

'

.

-2-

DETAILS

.

-1.

Persons Contacted

Principal Licensee Employees

G. B. Rogers, Construction Manager

F. Karpinski, Construction Supervisor

  • S. Head, Project Compliance Group
  • T. J. Jordan, Project QA Manager
  • J. T. Westermeier, Project Manager

Other Personnel

Bechtel Power Corporation

  • T. D. Robertson, Construction Manager
  • R. W. Miller, Deputy PQAM
  • R. H. Medina, Lead QA Engineer

L. Davis, Construction Manager

EBASCO Service Inc.

R. Peck, QA Site Supervisor

The NRC inspector also interviewed other licensee and contractor employees

during the course of the inspection.

  • Denotes those attending the exit interview.

2.

Site Tour

The NRC inspector toured the reactor building, control room and auxiliary

building for Units 1 and 2 to observe construction in progress and to

inspect housekeeping.

No violations or deviations were identified.

3.

Observation of Safety-Related Electrical Equipment

The NRC inspector selected several examples of electrical equipment and

components for examination.

The examination consisted of verifying that

the field installation agreed with applicable design drawings and that

separation and protection requirements were being met.

The following

equipment and components were inspected:

o

125 VDC Battery Charger (CIDJBC047G)

o

125 VDC Battery Charger (BIDJBCD47E)

o

125 VDC Battery Charger (DIDJBC047D)

'

.

-3-

o

7.5 KVA/ Static Inverter (AIVAIV1202)

o

25 KVA Inverter / Rectifier (CIVAIV002)

o

120 VAC Distribution Panel

AIVADP001)

(3E241EDP001)

o

120 VAC Distribution Panel

CIVADP002)

o

-120 VAC Distribution Panel

DIVADP1202)

o

480 VAC MCC (CIPf91 CEC 4)

o

480 VAC MCC (BIPMMCEB4)

o

Electrical Penetration - 3E261EEP009

o

Electrical Penetration - 3E261EEP0016

o

Electrical Penetration - 3E261EEP0018

o

Electrical Penetration - 3E261EEP0020

o

Electrical Penetration - 3E261EEP0027

o

Electrical Penetration - 3E261EEP0029

o

Electrical Penetration - 3E261EEP0043

o

Electrical Penetration - 3E261EEP0047

o

Electrical Penetration - 3E261EEP0054

o

Electrical Penetration - 3E261EEP0061

The NRC inspector visually inspected the electrical equipment and

components listed above. During this visual inspection, the NRC inspector

found one deficiency. The 120 VAC Distribution Panel identified as

3E241EDP001 had been signed off as completed according to installation

records. All required documentation indicated that this panel was

completely installed. However, a review of "as built" drawing

14926-4363-00001, Revision 5 (S.0.5647-C1) indicated that the referenced

panel had not been properly inspected to verify that field welds were

installed in accordance with instructions.

This is an apparent violation of Criterion X of 10 CFR Part 50, Appendix B

(498/8604-01).

4.

Review of Safety-Related Electrical Equipment Records

The NRC inspector reviewed Bechtel and EBASCO quality assurance (QA)

inspection reports to determine whether adequate documentation existed to

control electrical equipment activities in the following areas:

(a) receipt inspection and storage, (b) handling and in-process

installation, and (c) qualification and training of craft personnel,

a.

Receipt Inspection and Storage

The NRC inspector examined Bechtel QA documentation pertaining to the

receipt inspection and storage of electrical equipment. The records

examined appeared adequate to ensure that incoming electrical

equipment conforms to purchase specifications, and is properly stored

to protect against construction damage and adverse environmental

conditions. The documents and records examined are listed below:

o

P.O.-14926-4362 - Class 1E 120 VAC Distribution Panels,

-

.

-4-

Tag: 3E241EDP001, 3E241EOP002, and 3E241EDP1202.

o

Receiving Inspection Planning for Permanent Plant Items (4179)

Item: Class 1E AC & DC Distribution Panels.

o

P.O.-14926-4337 - Class 1E 480V Motor Control Centers.

o

Receiving Inspection Planning for Permanent Plant Items (4337)

Item: 480 VAC Class 1E Motor Control Centers.

o

P.O.-14926-4353 - Inverter / Rectifier.

o

Receiving Inspection Planning for Permanent Plant Items (4353)

Item: Inverter / Rectifier.

O

P.O.-14926-4100 - Battery Charger.

o

Receiving Inspection Planning for Permanent Plant Items (4100)

Item: Battery Chargers.

o

Surveillance Record for Housekeeping WPP/QCI 13.0.

o

Storage Inspection Report WPP/QCI 12.0.

o

Material Received Record - 58824, 7.5 KVA Inverter.

o

Westinghouse Quality Release - 39925, Instrument Power Supply

Inverters.

o

Nonconformance Report (NCR) S-G587.

In the areas reviewed the records confirmed that:

(1) Identification appears on electrical components and receiving

documentation.

(2) Physical conditions (such as damage, deterioration, etc.) were

identified and documented.

(3) Nonconforming component items placed in storage were identified

as required.

(4) Components were stored in proper storage level designation.

(5) Storage conditions (temperature, humidity and cleanliness) are

controlled and monitored as specified by specification.

(6) In place storage requirements were satisfied.

No violations or deviations were identified.

i

,.

-

or-

-y,

e,,,,-

- - ,

-,---,--,,-,,,,,,,,-n,,--

- - ~ - - -

eg,,

, , - -

-,, e

, , , -,-a

,, - - , - -,, - - - - . >

, -

,,,-

-

'

.

-5-

b.

Handling and In-Process Installation

The NRC inspector examined EBASCO QA documentation and records

pertaining to'the handling and in process installation of electrical

equipment.

The documents examined appeared adequate to ensure that

current procedures and specifications are being used by craftsmen.

The documents and records examined are listed below:

o

EBASCO Electrical Installation Inspection Report No. I-0087-E-1,

Item: 125 VDC Battery Charger, S/N 14530-102

o

EBASCO Electrical Installation Inspection Report No. I-0090-E-1,

Item: 124 VDC Battery Charger, S/N 14529-106

o

EBASCO Electrical Installation Inspection Report No.-I-0071-E-1,

Item: 125 VDC Battery Charger, S/N 14529-104

o

EBASCO Electrical Installation Inspection Report No. I-0073-E-1,

Item: 7.5 KVA AC Static Inverter, S/N 30K2311-2

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0115-E-1, Item: Inverter / Rectifier, S/N 141

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0048-E-1, Item: 120 VAC Vital Distribution Panel

3E241EDP001

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0039-E-1, Item: 120 VAC Vital Distribution Panel -

3E241EDP002

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0067-E-1, Item: 120 VAC Vital Distribution Panel -

3E241EDP1202

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0113-E-1, Item: Motor Control Center - BIPMMCEB4

o

EBASCO Electrical Equipment Installation Inspection Report

No. I-0114-E-1, Item: Motor Control Center - CIPMMCEC4

o

AWS D1.1 Structural Welding Inspection Report No. 1-00706

o

AWS D1.1 Structural Welding Inspection Report No. 1-00836

o

AWS 01.1 Structural Welding Inspection Report No. 1-00810

o

EBASCO Stud Welding Inspection Report No. 044 SWI

l

l

l

l

_

.

-6-

0

EBASCO Quality Control Inspection Report No. G-0094-E-1

o

AWS D1.1 Structural Welding Inspection Report No. 1-00809

o

EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00902

o

EBASCO AWS Dl.1 Structural Welding Inspection Report No. 1-00838

o

EBASCO AWS D1.1 Structural Welding Inspection P.eprot No. 1-00837

o

EBASCO AWS D1.1 Structural Welding Inspection Report No. 1-00901

In the areas reviewed the records indicate that:

(1) The components are installed in the proper location by qualified

craft personnel.

(2) The latest approved drawings, specifications and procedures were

available and used by craft personnel.

(3) The components identification is properly established and

maintained.

(4) Licensee and contractors inspections are performed and QC hold

points observed.

(5) Nonconformances are identified and handled in accordance with

established procedures.

No violations or deviations were identified.

c.

Qualification and Training of Craft Personnel

The NRC inspector reviewed the qualification records of four EBASCO

craft personnel associated with the installation of electrical

components and equipment.

The records were reviewed to ascertain

whether the craft personnel records were complete and up-to-date and

whether the craft personnel were qualified for their duties at the

time of the inspections.

No violations or deviations were identified.

5.

Exit Interview

The NRC inspector met with licensee representatives (denoted in

paragraph 1) and Mr. C. Johnson, the NRC Senior Resident Inspector on

March 13, 1986, and summarized the scope and finding of the inspection.

l

\\

U.S. NUCLEAR REGULATORY COMMISSION

NRcFOR7e6

PRINCIPALINSPECTOR Name <ast %st andmdac eaa

I

.

191 81)

,

if MC 0535

g*g

^ ^ -

INSPECTOR'S REPORT

REVIEWER

Office of Inspection and Enforcement

thSPECTORS

/

sp E. f$6s

"#

$

REPO U

NEMINSPEC DATE

LICENSEE / VENDOR

DOCKET NO i8d9tsiOR LICENSE

yy,

NO I8v PRODUCTS l13 agens

NO

SEQ

MO

YR

k/_)U

gg

ilb s&

h

0 $0

0

O h

$

$ D

0

Y

"

J

J

M - MODsF1

9 f g g g y

j j

j g

o 4

n

[6L4 by'

(_#4n14/Jjvg

_

D - DELETE

C

R

REPLACE

[8

H L1P

v

n'

's

iS

to

PE JOD OF INVES TIGA TIQN!1NSPECTON

INSPECTION PERFORMED By

ORGAN 12ATON (CCE OF REGON/HQ CONDUCT.

'

F MOM

70

A

1 - REGIONAL OFFICE STAFF

OTHER

wy-Weeuy Marrower R etwhng kv code )

MO.

DI.V

VR

MO

DAY

YR

2 RESIDENTINSPECTOR

.__ REGION

,

Ov50N

EBRANCH

Old /fC 8l0

O l.3 /h 8 l(o

3 - PERFORMANCE APPRAISAL TEAM

g

l g

lp

-

-

'

-M

33

l

34

l

'3

N

31

35

REGIONAL ACTION

TYPE OF ACTivW CONDUCTED ' Check oae ces om i

v

'O '"* # #

X

02 - S AFETY

06 - MGMT V6 SIT

10 - PLANT SEC.

14 - INQUIRV

i-N C FORM set

03 - iNC DENT

07 - SPECIAL

11 - INVENT VER

15 - INVESTIG ATION

A

2 - TEGONAL OFFICE LETTER

04 - ENFORCEMENT

08 - VENDOR

12 - SMrPMENT EXPORT

05 - MGMT. AUDif

09 - MAT ACCT.

13. iMPOR T

N

37 2

.N5PECT6GN. aNv ESTiG A reGN F+NDeNGS

rGTAL NUMBER

ENFORCEMENT CONF ERENCE

REPORT CONTAiN 2 730

LETTER OF RE PO 47 TR ANSM'TTAL DATE

OF VOLArONS AND

MELD

INFOR M A TION

A

B

C

D

DEvi Af TON'

NRC FORfA 591

REPORTSENT

1 - CLEAR

OR red

TOHQ FOR

LE TTEn iS iUED

ACTION

g

2 - VOLATON

3 - DEVIATON

A

B

C

D

Al8

C

D

A

B

C

D

MO

DAv

vm

MO

DAV

VR

l

1 vES

1 - VES

CIS / 12 /b

I

I

I

4 - VOLATON 4 0EVIATON

og

,

,

,

3.

40 4E '

42

43

44

99

50

$$

,

MODutt INFORM A riON

Moout E .NF cRM A r.oN

8 ',0

MODULE NUM6ER INSP

dg g

MODULE REO FOLLOWUP

HEC

MODULE NUM9ER rNSP

yz

MODULE REO FOLLOWUP

9

g

EO

E

E

(

NO

E

"'

!s! !! s:I!m.bd!e!!!!!! :!!

!. .! .!! !! sEI!ish.!!! !!!!! !!

!

i s

ss

r

1

1

me

r

e:

1

. -

.

-

= n

e-_

---

-<

.

-

-

-

-

e

i $ 3iOhiOlh b

OiOi.1

i i

i lii

lil I

8

i

l

i i

l i

i l

i

liil

IiiI

a

i i

i i

i

i i

i n

i

liil

i i

i i

i liil

c

c

s i

i i

i

liiI

il

i

C

U

i I

i i

i

i i

i i

i

i

I

il 0 is th l

^

f toi% 0,8i0

i liiIe

liiI^

IiiI

8

I

e

i

l i

e i

i

liil

liil

i i

i i

i

ii

i i

i

I

c

c

ii

i ,

i

i i

i i

, ,

i

i i

l,,I

I,,I

o

i,

i ,

,

i i

, ,

i

liil^

liiIe

liiI^

liiI

e

i

i

ii

, i

i

i

i

i i

i i

i

liil

i i

i i

i It i t ._

'

-

ii

i i

i

liil

IiiI

c

i,

, i

i

i i

e i

i

,

liil

liiI

c

i i

i i

i

ii

, i

i

liil^

liil-

liiI^

I

liil

a

i

i

ii

ii

i

i

i

i i

i i

i

'

I,il

liil

i,

i,

i

i ,

> >

i

li,

!

i,

,i

i

i i

i i

i

f i

O CtECLE SEQUE NCE #F

i

i

O

V'Ot af CN OR O* V' A fiON

l

l

{ l l

.

l p

l

.in h I ,

,am , ,

, .

,...

,, e,

o, w.n

..

,,

.,

..

.

m-

T.

nac ro,au m A -

oocxEr no <e os. . oA u.cansg

RENRr

MOOWE MBER

l"yy

moasy PRooverni3 a o'*

no

sea /11611 lo 15 h$1

INSPECTOR'S REPORT

C' 5 e o O O 9 8

F 6 oW

votc' 5"a'" o" o"T** l ML

(Continuation)

e

,

,

,

,

,

,

,

,c

Office of Inspection and Enforcement

v

p

a e _-

C

DOLAllON OR Otv1A TION Uinter up to 2400 characters nor each stem. If the rest escoeds this number, It wal De necessary to caraphrase Limot lines to 50 characters eacn3

t.

2

3.

4

Failure to Properly Inspect

Criterion X of Appendix B to 10 CFR Part 50 requires that activities

,

affecting quality be subjected to an inspection program to verify

conformance with the documented instructions, procedures and drawings for

accomplishing the activity.

This requirement is amplified by the approved

,

Quality Assurance Plan Description (QAPD) for the South Texas Project.

-

i0.

QCP 10.15, Revision 3, paragraph 5.2.3.B states that the Quality Control

, , .

Inspector (QCI) shall verify all field welds required have been inspected

and accepted by recording the completed acceptable welding inspection

report number on the installation inspection package.

is

Contrary to the above, the weld configuration on Panel 3E241EDP001

differed from the weld configuration shown on "as built" drawing

is-

14926-4362, indicating that the panel installation had not been properly

inspected to verify that the field welds were in accordance with

n

instructions.

This is a Severity Level IV violation (Supplement IE) (498/8604-01).

i.

20-

i

__

2i

l

22.

~

23

24

25

. __26

71

D

29

m

11

12

,

"

.

-

i

_

y

ss

i

U.S. NUCLEAR REGULATORY COMMISSloN