Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:60804 + (00:30:26, 24 May 2025)
- ML20206K603 + (00:30:35, 24 May 2025)
- ML20206K592 + (00:30:38, 24 May 2025)
- 05000499/LER-1999-004, :on 990406,power Was Not Available to Enable Closure of Personnel Air Lock within 30 Minutes Per TS 3.9.4.Caused Temporary Mod to Provide Power to Personnel Airlock.Note Has Been Added to Outage Notes + (00:31:17, 24 May 2025)
- IR 05000293/1988029 + (00:31:39, 24 May 2025)
- ML20206K265 + (00:32:09, 24 May 2025)
- ML20206K166 + (00:33:00, 24 May 2025)
- ML20206K036 + (00:33:43, 24 May 2025)
- ML20206J991 + (00:33:53, 24 May 2025)
- ML20206J989 + (00:33:54, 24 May 2025)
- ML20206J831 + (00:34:30, 24 May 2025)
- IR 05000482/1986004 + (00:34:41, 24 May 2025)
- IR 05000361/1998302 + (00:34:50, 24 May 2025)
- ML20206J756 + (00:35:03, 24 May 2025)
- IR 05000498/1985019 + (00:35:04, 24 May 2025)
- ML20206J711 + (00:35:14, 24 May 2025)
- ML20206J645 + (00:35:32, 24 May 2025)
- CLI-88-07, NRC Staff Response to Intervenors Motions to Reopen Record & Admit late-filed Decommissioning Contentions.* Motions Should Be Denied & Stay Imposed by Commission in CLI-88-07 Lifted + (00:35:40, 24 May 2025)
- ML20206J596 + (00:35:45, 24 May 2025)
- TXX-8875, Responds to NRC Re Violations Noted in Insp Repts 50-445/88-56 & 50-446/88-52.Corrective Actions:Rev 8 to TNE-CS-CA-CA-1a Prepared to Incorporate More Conservative Spacing Criteria for Hilti Super Kwik Bolts Installation + (00:35:49, 24 May 2025)
- ML20206J556 + (00:35:55, 24 May 2025)
- ML20206J461 + (00:36:23, 24 May 2025)
- 0CAN059901, Requests Registration of Initial Use on 990427 of Tenth Dry Fuel Storage Cask Utilized at ANO by Providing Listed Info, in Compliance with Requirements of 10CFR72.212(b)(1)(ii) + (00:36:32, 24 May 2025)
- IR 05000333/1986004 + (00:36:57, 24 May 2025)
- ML20206J201 + (00:37:40, 24 May 2025)
- 05000354/LER-1998-008-01, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a + (00:38:07, 24 May 2025)
- ML20206J057 + (00:38:21, 24 May 2025)
- ML20206J015 + (00:38:32, 24 May 2025)
- IR 05000219/1986015 + (00:38:59, 24 May 2025)
- ML20206H875 + (00:39:03, 24 May 2025)
- IR 05000352/1999301 + (00:40:01, 24 May 2025)
- IR 05000211/2014001 + (00:40:10, 24 May 2025)
- IR 05000361/1999301 + (00:40:52, 24 May 2025)
- ML20206H711 + (00:42:12, 24 May 2025)
- TXX-8877, Forwards Draft Rev 0 to Comanche Peak Steam Electric Station Tech Spec Improvement Program Tech Spec Requirements, Per NRC Rev 4a of Sts,For Review + (00:42:41, 24 May 2025)
- ML20206H470 + (00:43:15, 24 May 2025)
- ML20206H102 + (00:44:36, 24 May 2025)
- ML20206H062 + (00:44:51, 24 May 2025)
- IR 05000482/1985019 + (00:45:03, 24 May 2025)
- ML20206H013 + (00:45:05, 24 May 2025)
- L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers + (00:45:11, 24 May 2025)
- IR 05000461/1999011 + (00:45:16, 24 May 2025)
- TXX-8878, Supplemental Deficiency Rept CP-88-22 Re Svc Water Discharge Pipe Missile Protection.Initially Reported on 880205.Addl Missile Protection Will Not Be Required & Deficiency Not Reportable Under Provisions of 10CFR50.55(e) + (00:45:24, 24 May 2025)
- ML20206G955 + (00:45:26, 24 May 2025)
- IR 05000482/1983013 + (00:45:27, 24 May 2025)
- IR 05000302/1988026 + (00:46:37, 24 May 2025)
- ML20206G905 + (00:46:42, 24 May 2025)
- IR 05000482/1985031 + (00:47:03, 24 May 2025)
- IR 05000458/1988021 + (00:47:16, 24 May 2025)
- ML20206G778 + (00:47:19, 24 May 2025)
- 05000458/LER-1999-005, :on 990228,noted That Standby Swp Was Inoperable for Greater than 30 Days.Caused by Mechanical Failure of Breaker.Breaker E22-S004 ACB-05 Was Replaced with Like,Operable Breaker & Standby Swp Was Declared Operable + (00:47:30, 24 May 2025)