TAC:60804
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Initiation
Questions Answers Results Other: GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary, GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602, GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment, ML17278A575, ML17278A805, ML17278A846, ML17278A863, ML20206K639 | |
| From | |
MONTHYEARML20206K6391972-05-31031 May 1972
[table view]Ack Receipt of Re Technical Basis for Accepting Weld Surface Area W/Bluish Tint.No Further Questions ML17278A2521985-06-26026 June 1985 Notification of 850627 Meeting W/Util & Exxon in Bethesda,Md to Identify & Clarify Preliminary Requirements for First Refueling of Plant ML17278A3201985-07-26026 July 1985 Summary of 850627 Meeting W/Util & Exxon Nuclear in Bethesda,Md Re Util Plans & Preparations for Cycle 2 Core Reload Currently Scheduled for Spring 1986.List of Attendees & Viewgraphs Encl GO2-86-081, Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid1986-01-17017 January 1986 Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid ML17278A5751986-01-17017 January 1986 Proposed Tech Spec Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 8606021986-01-30030 January 1986 Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602 ML17278A8051986-03-31031 March 1986 Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle 1 & Final Feedwater Temp Reduction GO2-86-311, Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request1986-04-0707 April 1986 Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date1986-04-24024 April 1986 Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept1986-04-25025 April 1986 Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment1986-04-30030 April 1986 Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment ML17279A6481986-05-0101 May 1986 Draft Lead Test Assembly Program,Wpps 2 ML17278A8411986-05-22022 May 1986 Provides Supplemental Info to 860226 Application to Amend License NPF-21 Re Cycle 2 Reload.Use of Two Separate Sets for two-loop Operating Limits for Fuel Types & Separate Set for Single Loop proposed.Marked-up Tech Specs Encl ML17278A8481986-05-23023 May 1986 Safety Evaluation Supporting Amend 28 to License NPF-21 ML17278A8461986-05-23023 May 1986 Amend 28 to License NPF-21,revising Tech Specs to Support Operation of Facility at Full Rated Power During Cycle 2 & Establishing Operating Limits for All Fuel Types ML17278A8631986-05-23023 May 1986 Amend 27 to License NPF-21,revising Tech Spec Table 3.8.4.3-1, Motor-Operated Valves Thermal Overload Protection, to Add Valves Previously Omitted,Add Valves Due to Sys Upgrades & Remove nonsafety-related Valves ML17278A8651986-05-23023 May 1986 Safety Evaluation Supporting Amend 27 to License NPF-21 ML17278A8801986-05-29029 May 1986 Offers No Comments on 860117,0226 & 0328 Requests for Amends to License NPR-21.Request for 1-yr Extension to Install Wetwell Level Monitoring Sys Acceptable But Installation Should Be Completed by Second Fuel change-out GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary1986-06-27027 June 1986 Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary 1986-04-25 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:60804&oldid=5485208"