ML20206J756

From kanterella
Jump to navigation Jump to search
Responds to NRC 860307 Request for Supplemental Info Re Violations Noted in Insp Repts 50-498/85-19 & 50-499/85-17. Site Procedure SSP-18 Does Not Require Listing of Filler Matl Ref Numbers for ASME Class II or III Supports
ML20206J756
Person / Time
Site: South Texas  
Issue date: 04/07/1986
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20206J753 List:
References
ST-HL-AE-1642, NUDOCS 8606270263
Download: ML20206J756 (3)


Text

-.

A+

The Light Company in-n ughmeiw im>x im u->n.wxasan mmsen April 7, 1986 ST-HL-AE-1642 File Bo.: C2.4 D@h Mr. Robert D. Martin

[

Regional Administrator, Region IV

/^

N H I 0 19 %

i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 is Arlington, Texas 76011 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Request ~for Supplemental Information Conc ern f nc-Notice of Viointion _B519-01/8517-01

Dear Mr. Martin:

The following information is submitted in response to your request dated March 7,1986 relative to Notice of Violation 85-19-01/85-17-01.

In October,1985, HL&P was informed by the NRC Resident Inspector of a documentation concern relative to pipe support packages for the Essential Cooling Water System. Specifically, certain packages which had been QC accepted did not contain the filler material reference number as required by the procedure in effect at the time of the NRC review. BL&P Quality Assurance performed an investigation based on this concern and confirmed that a number of packages were indeed missing this information. This deficiency was documented in Standard Deficiency Report, SDR fH-194.

In preparing our response to the Notice of Violation, it was determined that all support packages refe' renced by the HL&P SDR and the Notice of Violation as missing filler material reference number were prepared during a time when the site procedure (SSP-18) did not require the listing of the filler material reference number. The change document that deleted the requirement was subsequently voided and therefore never incorpurated into the current procedure that was provided to the NRC inspector during his investigation. The SDR generated as a result of the QA investigation was in error.

8606270263 060620 ADOCK 0500 g 8 PDR G

L4/NRC/c cc-oG3 s(,

g ST-HL-AE-1642 Filo No.: C2.4 flouston I.ighting & Power Company Page 2 The current revision of site proecedure (SSP-18) does not require listing l

of filler material reference numbers for ASME Class II or III supports. This information is not required by the ASME Code.

If you have any additional quest!.ons please contact Scott M. Head at 512-972-83 92.

Very truly yours.

J. H. Goldberg Group Vice President, Nuclear SMH/ag l

)

L4/NaC/c

ST-HL-AE-1642

sie, Fils No.: G2.4 Ilouston Lighting & Power Company Page 3 cc:

Hugh L. Thompson, Jr., Director Brian E. Berwick, Esquire Division of PWR Licensing - A Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S. Nuclear Regulatory Commission P.O. Box 12548, Capitol Station Washington, DC 20555 Austin, TX 78711 N. Prasad Kadambi, Project Manager Lanny A. Sinkin U.S. Nuclear Regulatory Commission Christic Institute 7920 Norfolk Avenue 1324 North Capitol Street Bethesda, MD 20814 Washington, DC 20002 Claude E. Johnson Oreste R. Pirfo, Esquire Senior Resident Inspector /STP Hearing Attorney c/o U.S. Nuclear Regulatory Office of the Executive Legal Director Commission U.S. Nuclear Regulatory Commission P.O. Box 910 Washington, DC 20555 Bay City, TX 77414 Charles Bechhoefer, Esquire M.D. Schwarz, Jr., Esquire Chairman, Atomic Safety &

Baker & Botts Licensing Board One Shell Plaza U.S. Nuclear Regulatory Commission Houston, TX 77002 Washington, DC 20555 J.R. News.an, Esquire Dr. James C. Lamb, III Newman & Holtzinger, P.C.

313 Woodhaven Road i

1615 L Street, N.W.

Chapel Hill, NC 27514 Washington, DC 20036 Judge Frederick J. Shon Director, Office of Inspection Atomic Safety and Licensing Board and Enforcement U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Mr. Ray Goldstein, Esquire T.V. Shockley/R.L. Range 1001 Vaughn Building Central Power & Light Compang 807 Brazos P.O. Box 2121 Austin, TX 78701 Corpus Christi, TX 78403 Citizens for Equitable Utilities, Inc.

H.L. Peterson/G. Pokorny c/o Ms. Peggy Buchorn City of Austin Route 1, Box 1684 P.O. Box 1088 Brazoria, TX 77422 Austin, TX 78767 Docketing & Service Section J.B. Poston/A. vonRosenberg Office of the Secretary City Public Service Board U.S. Nuclear Regulatory Commission P.O. Box 1771 Washington, DC 20555 San Antonio, TX 7 82 %

(3 Copies)

Advisory Committee on Reactor Safeguards l

U.S. Nuclear Regulatory Commission j

1717 H Street Washington, DC 20555 Revised 12/2/85 L4/NRC/c l.

-