ML20206J015

From kanterella
Jump to navigation Jump to search
Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/86-42 & 50-499/86-42.Requests Ltr Confirming Corrective Actions Resulting from Engineering Assurance Program Summary Rept
ML20206J015
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/10/1987
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8704150492
Download: ML20206J015 (4)


See also: IR 05000498/1986042

Text

__-

.

_ _ _

DCS

'

4'

  • o

UNITED STATES

.

!

1

NUCLEAR REGULATORY COMMISSION

,

?

y

WASHINGTON. D. C. 20666

!e

S

  • % , , * **#

O 10 gy

Docket Nos.

50-498

50-499

'

Mr. J. H. Goldberg

Group Vice President - Nuclear

Houston Lighting and ?ower Company

P.O. Box 1700

Houston Texas 77001

SUBJECT: HL&P RESPONSE TO INSPECTION REPORT, 50-498/86-42, 50-499/86-42

Your letter dated March 23, 1987 forwarded us your response to the seven open

items associated with the subject inspection report.

That inspection dealt

with our review of corrective actions resulting from Engineering Assurance

Program (EAP) Tasks:

84-4, Separation and Fire Protection Criteria; 85-4, High

Energy Line Break Analysis; 85-4, Class 1 Piping Stress Analysis; and 86-1,

Field Walkdown. The staff has reviewed your responses and finds them

acceptable.

Therefore, all open items for the subject inspection report are

closed.

Additionally, we a're in receipt of your Engineering Assurance Program Summary

Report. That report in combination with the six inspection reports issued as

a result of our overview of the EAP will form the basis of our safety evaluation

report. To assist us in the preparation of the SER you are requested to provide

a confirmatory letter stating that the corrective actions resulting from the

various EAP tasks have been completed and identify with justification which

corrective actions will not be completed by fuel, loading, if any.

If you have any further questions regarding this matter please contact Mr.

E.V. Imbro at (301) 492-9664

i

Sincerely,

,

l

,i

h

B i n K. Grimes, Director

Di ision of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

i

8704150492 870410

PDR

ADOCK 05000498

G

PDR -

._- ._

_ _ __

.

.

_.

--

'

i

.

Mr. J. P. Goldbera

Pouston I.iahting and Power Company

South Texas Proiect

CC'

Prian Rerwick, Eso.

Resident inspector / South Texas

Assistant Attornev General

Project

Environmental Protection Division

c/o If.S. Nuclear Regulatory Commission

P. O. Rox 1954R

P. O. Box 910

Capitol Station

Pav City, Texas 77818

Austin, Texas 78711

Mr. Jonathan Davis

Mr. J. T. Westerreir

Assistant City Attorney

Manaaer, South Texas Project

City of Austin

Houston I.ichtina and Power Company

P. O. Rox 1088

P. O. Rox 1700

Austin, Texas 78767

Houston, Texas 77001

Ms. Pat Cov

Mr. P. l.. Peterson

Citizens Concerned About Nuclear

Mr. G. Pokorny

Power

City of austir

5106 Casa Oro

P. O. Box 1088

San Antonio, Texas 78733

Austin, Texas 78767

Mr. Mark R. Wisenbera

Mr. J. B. Postdn

Manaaer, Nuclear I.icensino

'

Mr. A. Von Rosenbero

Houston I.ichtina and Power Company

City Public Service Boad

P. O. Box 1700

P. O. Rox 1771

Houston, Texas 77001

San Antonio, Texas 78296

Mr. Charles Hallican

' Jack R. Newman, Eso.

Mr. Burton I.. I.ex

Newman A Holtzinoer, P.C.

Rechtel Corporation

1615 1. Street, NW

P. O. Pox 2166

k'ashinaton, D.C.

20036

Houston, Texas 77001

"elbert Schwartz, Jr., Esq.

Mr. E. R. Brooks

Paker A Potts

Mr. P. I.,

Range

One Shell Plaza

Central Power and I.iaht Company

Houston, Texas 77002

P. O. Rox 21?2

Corpus Christi, Texas 78403

Mrs. Pocov Buchorn

Executive Director

Citirons for Eauitable Utilities, Inc.

Rou+e 1, 80x 1684

,

Ara 70ria, Texas 77422

l

_ _ _ .

.

..

.

'

.

h

Fouston 1.ichtino & Power Company

P-

South Texas Pro.iect

-

cc:

PeQional Administrator, Region IV

U.S. Nuclear Regulatory Commission

.

Office of Executive Director

for Operations

611 Ryan Plaza Drive, Suite 1000

Arlinoton, Texas 76011

Mr. lanny Sinkin,

Counsel for Intervenor

Citizens Concerned about Nuclear Power, Inc.

Christic Institute

13?d North Capitol Street

Washington, D.C.

20009

..

I.icensino Representative

Houston I.ichtino and Power Company

Suite 1309

7910 Woodmont Avenue

Pethesda, Maryland 20814

Houston Lighting"& Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77001

Texas Radiation Control Program Director

1100 W. 49th Street

Austin, Texas 78756-318

.

8

L

.

_ - _ _ -

..

. _ - .

_ _ - _ _ _ _

'

.

.

J. H. Goldberg

-2-

Distribution

bec to DMB (IE01)

eus,a;U35 #

^NRCTPDR~

bec distrib. by RIV:

Local PDR

RPB

QAB Reading

RRI-0PS

DQAVT Reading

RRI-CO NST.

JMTaylor, IE

R&SPB

RStarostecki, IE

RIV File

BKGrimes, IE

RSTS Operator

HJMiller, IE

RGTaylor, RPB/C

EVImbro, IE

Project Inspector

RWParkhill, IE

DRSP

PKadambi, NRR

RDMartin, RA

HThompson, NRR

Section Chier (fiPB/C)

TMNovak, NRR

MIS System

WButler, NRR

DWeiss, RM/ALF

,

EHylton, NRR

RPirfo, ELD

AE0D

RSB

OELD

RHall

NMSS

RES

ACRS (10)

NSIC

NTIS

Regional Administrators

'

Regional Division Directors

TSpeis, NRR

ELJordan, IE

JAxelrad, IE

HBoulden, OIA

-

SECY

OPE

!

Q B DQAVT:IE

Q

VT:IE N

T:IE

E/

RWParkhill:je EVImbro

//HJMiller

BKGrimes

4/ V/87

4///87

4/o/87

4/o/87

f

f

._ .

-

_- -

_

._.

. _ .

.

..

. . _