Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344F513 + (15:48:35, 24 December 2024)
- ML19344F512 + (15:48:36, 24 December 2024)
- ML19344F508 + (15:48:39, 24 December 2024)
- ML19344F507 + (15:48:40, 24 December 2024)
- ML19344F505 + (15:48:41, 24 December 2024)
- ML19344F503 + (15:48:42, 24 December 2024)
- ML19344F501 + (15:48:43, 24 December 2024)
- ML19344F499 + (15:48:44, 24 December 2024)
- ML19344F497 + (15:48:45, 24 December 2024)
- ML19344F494 + (15:48:48, 24 December 2024)
- ML19344F492 + (15:48:49, 24 December 2024)
- ML19344F490 + (15:48:50, 24 December 2024)
- ML19344F489 + (15:48:51, 24 December 2024)
- ML19344F488 + (15:48:55, 24 December 2024)
- ML19344F486 + (15:48:56, 24 December 2024)
- ML19344F484 + (15:48:57, 24 December 2024)
- ML19344F483 + (15:48:57, 24 December 2024)
- ML19344F482 + (15:48:58, 24 December 2024)
- ML19344F481 + (15:48:59, 24 December 2024)
- ML19344F479 + (15:49:00, 24 December 2024)
- ML19344F475 + (15:49:01, 24 December 2024)
- ML19344F476 + (15:49:01, 24 December 2024)
- ML19344F474 + (15:49:02, 24 December 2024)
- ML19344F473 + (15:49:03, 24 December 2024)
- ML19344F471 + (15:49:04, 24 December 2024)
- ML19344F470 + (15:49:05, 24 December 2024)
- ML19344F469 + (15:49:06, 24 December 2024)
- ML19344F467 + (15:49:07, 24 December 2024)
- ML19344F466 + (15:49:08, 24 December 2024)
- 05000321/LER-1980-100-01, /01T-0:on 800822,util Notified by Bechtel That Seismic Piping Support Was Not Installed.Apparently Caused by Poor Communication W/Designer Re Addition of Support to Original Analysis.Support Installed + (15:49:10, 24 December 2024)
- 05000321/LER-1980-100, Forwards LER 80-100/01T-0 + (15:49:14, 24 December 2024)
- 05000321/LER-1980-102-03, /03L-0:on 800821,while at Steady State Power,B LPCI Inverter Tripped Making B Loop of RHR Inoperable.Caused by High Ambient Temp.Temporary Cooling Is Being Used Until Installation of Permanent Chillers Is Complete + (15:49:16, 24 December 2024)
- ML19344F458 + (15:49:19, 24 December 2024)
- 05000321/LER-1980-102, Forwards LER 80-102/03L-0 + (15:49:20, 24 December 2024)
- ML19344F454 + (15:49:21, 24 December 2024)
- BECO-80-211, Application for Proposed Change 80-3 to License DPR-35,re Definition of Operable as Applied to Single Failure Criterion for Safety Sys.Request Is in Response to IE Info Notice 79-35 & NRC .Fee Encl + (15:49:22, 24 December 2024)
- ML19344F453 + (15:49:22, 24 December 2024)
- 05000321/LER-1980-101-03, /03L-0:on 800819,Standing Order 80-45, Scram Discharge Vol Residual Water or Vacuum Determination, Was Not Performed.Caused by Personnel Error + (15:49:25, 24 December 2024)
- 05000302/LER-1980-035-03, /03L-0:on 800816,during Startup operation,post- Accident Monitoring Instrumentation Found Inoperable.Caused by Instrument Drift.Instrumentation Recalibr & Verified Operable + (15:49:26, 24 December 2024)
- 05000321/LER-1980-101, Forwards LER 80-101/03L-0 + (15:49:28, 24 December 2024)
- 05000302/LER-1980-035, Forwards LER 80-035/03L-0 + (15:49:33, 24 December 2024)
- ML19344F443 + (15:49:34, 24 December 2024)
- ML19344F444 + (15:49:34, 24 December 2024)
- ML19344F441 + (15:49:35, 24 December 2024)
- 05000368/LER-1980-065-03, /03L-0:on 800812,while Performing Surveillance Testing on Containment Spray & Sump Valves,Containment Sump Recirculation Valve Failed.Caused by Valve Operator Overload Breaker Tripping Due to Foreign Matl in Switch Contacts + (15:49:36, 24 December 2024)
- 05000368/LER-1980-065, Forwards LER 80-065/03L-0 + (15:49:38, 24 December 2024)
- 05000312/LER-1980-039-01, /01T-0:on 800813,while Proceeding to Cold Shutdown,Reactor Protection Sys Was Placed in Shutdown Bypass Mode & Nuclear Overpower Trip Setpoint Not Reduced to Less than 5% of Rated Power.Caused by Personnel Error + (15:49:40, 24 December 2024)
- 05000368/LER-1980-066-03, /03L-0:on 800811,during Mode 1 operation,hi-hi Containment Pressure Trip Was Received on Plant Protective Sys Channel D.Other Channels Reported Normal Pressures. Caused by Power Supply Failure on Bistable Card + (15:49:42, 24 December 2024)
- ML19344F434 + (15:49:43, 24 December 2024)
- 05000312/LER-1980-039, Forwards LER 80-039/01T-0 + (15:49:45, 24 December 2024)
- 05000368/LER-1980-066, Forwards LER 80-066/03L-0 + (15:49:46, 24 December 2024)