UNITED STATES
NUCLEAR REGULATORY COMMISSION
E
I. 8 # , I ^I
Os -
REGloN IV
611 RY AN PLAZA DRIVE, SUITE 1000
.-l
ARLINGTON, TEXAS 76012
".,
o
lg
'
%,/
+....
July 23, 1980
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 80-15
50-446/Rpt. 80-15
Texas Utilities Generating Company
ATTN:
Mr..R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
>
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. R. G. Taylor, during June 1980, of activities authorized by NRC Construction
Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units No.1 and 2,
and to the discussion of our findings with Mr. R. G. Tolson and other members
of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Part 50, Title 10, of the Code of Federal
1
Regulations. One apparent item of noncompliance, which is discussed in para-
l
graph 6 of the enclosed inspection report, was forwarded to you by our letter
dated June 23, 1980. A second apparent item of noncompliance and references to
the pertinent requirements are identified in the enclosed Notice of Violation
l
and in paragraph 6 of the enclosed inspection report.
'
This notice is sent to you pursuant to the provisions of Section 2.201 of the
,
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
I
Section 2.201 requires you to submit to this office, within_30 days of your
receipt of $his notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance; and
(3)
the date when full compliance will be achieved.
i
~ 8 0'O 915 0 337
-
@
.
.
Texas Utilities Generating Company
2
July 23, 1980
One new unresolved item is identified in paragraph 6 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part'2,
Title 10, Code of. Federal Regulations, a copy of this letter and the enclosed
inspection report will.be placed in the NRC's Public Document Room. - If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of .this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary .information identified is contained in an
enclosure to the applicat1on, since the application without the enclosure will
also be placed in the Public. Document Room.
If we do not hear from you in this
regard within the specified period, the report will be. placed in the Public
Document Room.-
-
s
"
.
,,
.
. Should you have any questions concerning this inspection, we 'will be pleased
to discuss them with you.
Sincerely,
_
w
W. C. Seidlih Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
"
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-445/80-15
50-446/80-15
cc: w/ enclosures
Texas Utilities Generating Company
-ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
I
Dallas, Texas 75201
.
4
.
_~