Forwards IE Insp Repts 50-321/80-26 & 50-366/80-26 on 800625-26.No Noncompliance Noted
ML19344F492
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/23/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19344F493 List:
References
NUDOCS 8009150332
Download: ML19344F492 (2)


See also: IR 05000321/1980026

Text

r

  1. / /CL
  1. s .s'o

,

UNITEO STATES

-

8

g

NUCLEAR RERULATORY COMMISSIOP'

o

N

E

REGION 11

'

%~

0,

101 MARIETTA ST N.W SUITE 3100

%*****o

ATLANTA, GEORGIA 3o303

JUL 2 31980

In' Reply Refer To:

80-26

50-366/80

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on June 25

through 26, 1980 of activities authorized by NRC Operating License No. DPR-57 and

License No. lPF-5 for the Hatch Nuclear Plant facility, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

~

One new unreso1ved item resulted from this inspection and is discussed in the

enclosed report. This . item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

j

the report will be placed in the Public Document Room.

l

8009150331

Q

. _

. _ . .

' ' .

,

- Georgia. Power Company

-2-

'

.(

.

'Should you have any questions concerning this letter, we will be glad to discuss

them with you.

_

Sincerely,

ie ,f

.

C. E.

urphy,

Reactor Constructica and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-321

0-26.

and 50-366/80-26

l-

cc w/ enc 1:

'

'

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation

-

l

.

l

I

i

s

i

.-;.

.

4

d . ' = 's_e.p f

->a-.

g

.s

== >e % wgwe ==m h vem meg = vir= =..

    • y=

rW

-

"W**w+

= .

8*

-

-*

-

gp. .

,-

-.

,- ---.

,-6-

-