ML19344F512

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800609-10,24-27 & 30 & 0703
ML19344F512
Person / Time
Site: River Bend 
Issue date: 07/25/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19344F502 List:
References
50-458-80-06, 50-458-80-6, NUDOCS 8009150352
Download: ML19344F512 (2)


Text

-

w-e 50-458/80 -Appendix A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted June 9-10, June 24-27, and June 30-July 3, 1980, it appears certain of your activities were not conducted in full compliance with the conditions of your NRC Construction Permit No. CPPR-145 as indicated below:

Failure to Follow Procedures for the Identification of Training Needs Criterion V' of Appendix B 'to :10 CFR 50 requires that activities affect 1ng

. quality. shall.be prescribed by documented procedures of a type appropriate to.the circumstances, and shall be accomplished in accordance with these procedures.

~

Stone-and Webster. Training Procedure-CMM-9.1, " Construction Training Program," requires, in Section 5.5, that each supervisor be responsible for id.entifyings co.nstruction training needs to the Construction Training Supervisoi.

Contrary to the above:

-On June.26, 1980, the IE inspector was informed by the licensee and contractor personnel that supervisors were not identifying training needs to the Construction Training Supervisor.

This is an infraction.

80091 50 3 1

-,