Text
-
w-e 50-458/80 -Appendix A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted June 9-10, June 24-27, and June 30-July 3, 1980, it appears certain of your activities were not conducted in full compliance with the conditions of your NRC Construction Permit No. CPPR-145 as indicated below:
Failure to Follow Procedures for the Identification of Training Needs Criterion V' of Appendix B 'to :10 CFR 50 requires that activities affect 1ng
. quality. shall.be prescribed by documented procedures of a type appropriate to.the circumstances, and shall be accomplished in accordance with these procedures.
~
Stone-and Webster. Training Procedure-CMM-9.1, " Construction Training Program," requires, in Section 5.5, that each supervisor be responsible for id.entifyings co.nstruction training needs to the Construction Training Supervisoi.
Contrary to the above:
-On June.26, 1980, the IE inspector was informed by the licensee and contractor personnel that supervisors were not identifying training needs to the Construction Training Supervisor.
This is an infraction.