Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345E260 + (14:26:01, 24 December 2024)
- ML19345E259 + (14:26:01, 24 December 2024)
- ML19345E257 + (14:26:02, 24 December 2024)
- ML19345E256 + (14:26:04, 24 December 2024)
- ML19345E254 + (14:26:04, 24 December 2024)
- ML19345E253 + (14:26:05, 24 December 2024)
- ML19345E250 + (14:26:06, 24 December 2024)
- ML19345E246 + (14:26:09, 24 December 2024)
- ML19345E245 + (14:26:10, 24 December 2024)
- ML19345E242 + (14:26:10, 24 December 2024)
- 05000324/LER-1980-089-03, /03L-0:on 801120,emergency Recirculation Fan 18-14-3450 Would Not Start During Control Bldg Emergency Filters Ventilation Sys Functional Test.Caused by Fan Motor Thermal Overloads Tripping.Thermal Overloads Reset + (14:26:12, 24 December 2024)
- ML19345E240 + (14:26:13, 24 December 2024)
- 05000324/LER-1980-089, Forwards LER 80-089/03L-0 + (14:26:14, 24 December 2024)
- ML19345E235 + (14:26:15, 24 December 2024)
- ML19345E229 + (14:26:16, 24 December 2024)
- ML19345E230 + (14:26:16, 24 December 2024)
- ML19345E227 + (14:26:17, 24 December 2024)
- ML19345E226 + (14:26:18, 24 December 2024)
- ML19345E221 + (14:26:19, 24 December 2024)
- ML19345E222 + (14:26:19, 24 December 2024)
- ML19345E220 + (14:26:20, 24 December 2024)
- ML19345E219 + (14:26:21, 24 December 2024)
- ML19345E218 + (14:26:21, 24 December 2024)
- ML19345E216 + (14:26:22, 24 December 2024)
- ML19345E217 + (14:26:22, 24 December 2024)
- ML19345E215 + (14:26:23, 24 December 2024)
- ML19345E214 + (14:26:24, 24 December 2024)
- ML19345E213 + (14:26:24, 24 December 2024)
- ML19345E212 + (14:26:25, 24 December 2024)
- ML19345E211 + (14:26:26, 24 December 2024)
- ML19345E210 + (14:26:26, 24 December 2024)
- ML19345E209 + (14:26:27, 24 December 2024)
- 05000344/LER-1980-025-03, /03L-0:on 801112,during Periodic Test,Found Vital Preferred 120 Volts Ac Instrument Buses Y11,Y13 & Y24 Powered from Same Emergency Power Source Train.Caused by Failure in Determining Alternate Electrical Supply Lineup + (14:26:28, 24 December 2024)
- ML19345E207 + (14:26:29, 24 December 2024)
- 05000344/LER-1980-025, Forwards LER 80-025/03L-0 + (14:26:31, 24 December 2024)
- ML19345E203 + (14:26:32, 24 December 2024)
- ML19345E201 + (14:26:33, 24 December 2024)
- 05000324/LER-1980-069-03, During Testing After Refueling W/Reactor Core Isolation Cooling Turbine Running & Pump at 250 Psig Discharge Pressure,No Flow Indicated on Reactor Core Isolation Cooling Flow 2-E51-FIC-R600 + (14:26:34, 24 December 2024)
- ML19345E199 + (14:26:36, 24 December 2024)
- 05000324/LER-1980-069, Forwards Updated LER 80-069/03L-1 + (14:26:37, 24 December 2024)
- ML19345E193 + (14:26:41, 24 December 2024)
- 05000338/LER-1980-101-03, /03L-0:on 801207 While Operating in Mode 1 at 70% Power,Containment Hihi Pressure Alarm Channel 2 Was Received.Caused by Signal Comparator Card Failing Low Out of Tolerance.New Card Installed + (14:26:43, 24 December 2024)
- 05000339/LER-1980-095-03, /03L-0:on 801202,while Operating in Mode 3,rod Position Indication for Rod Cluster G-13 Differed from Demand Position by Greater than 12 Steps.Caused by Instrument Drift Due to Change in Temp of Control Rod Drive + (14:26:45, 24 December 2024)
- 05000338/LER-1980-101, Forwards LER 80-101/03L-0 + (14:26:46, 24 December 2024)
- ML19345E188 + (14:26:48, 24 December 2024)
- 05000339/LER-1980-095, Forwards LER 80-095/03L-0 + (14:26:49, 24 December 2024)
- 05000339/LER-1980-082-03, /03L-0:on 801125,during Degraded Voltage Test, Breaker 24J1-2 Failed to Open Upon Receiving Undervoltage Test Signal & 2-RS-P-1B Was Inoperable for 3-h.Caused by Stuck Linkage Arm.Linkage Pivot Points Oiled + (14:26:51, 24 December 2024)
- 05000339/LER-1980-082, Forwards LER 80-082/03L-0 + (14:26:53, 24 December 2024)
- 05000317/LER-1980-064-03, /03L-0:on 801121,during Piping Sys Supports Walkdown,Seismic Restraint for Auxiliary Spray Control Valve Found Not Installed.Three Supports Required Redesign & Relocation.Caused by Error During Initial Const + (14:26:55, 24 December 2024)
- 05000325/LER-1980-089-03, /03L-0:on 801120,during Visual Insp of Snubbers on safety-related Sys,Bergan Paterson HSSA3,located on Conventional Svc Water Header anti-siphon Piping Structure, Determined Inoperable.Caused by Excessive Wear on Piston + (14:26:57, 24 December 2024)
- 05000317/LER-1980-064, Forwards LER 80-064/03L-0 + (14:26:58, 24 December 2024)
- 05000325/LER-1980-089, Forwards LER 80-089/03L-0 + (14:27:00, 24 December 2024)