Text
m
~
,e COLLEGE OF ENGINEERING f
5 3 l1
.gg VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY
~ -.;
Blacksburg, Virginia 24061 Ne=tia.ur:vmox Ax =usu L.seen. rent March 19, 1930 Mr. Steve Ra=cs Division of Operating Reactors 1*.S.
- uclear Regulatory Cc==ission k'ashington, D.C.
20555
Dear Mr. Ra=os:
Inclosed are two copies of the Preliminary Safety Analysis Report for the VPI & SU reactor (License R-62).
This document was prepared for opera-tion at a =ax1=um power level of 500 kw.
The PSAR has been reviewed and-approved by both the Reactor Safety Co=mittee and the Radiation Safety Coc-ittee.
tie would appreciate your reviewing the PSAR at your earliest convenience so that we can proceed with all the required construction work. Our tenta-tive schedule for construction is as follows:
April 1, 1980: Start installation of cooling tower May 1, 1980 : Start installation of new heat exchanger June 1, 1980 : Start modification of primary coolant syste=
Enclosed also are two preliminary copies of our E=ergency Plan which has also been raviewed by the Reactor Safety Co-Jttee and the ?adiation Safety Co-J t t e e.
Thanks for your cooperation.
Sincerely yours, "A
<c.
. /; ~
.~ n i
T. F. Parkinsen, Director Nuclear Reactor Laboratory TFP/fbl cc:
- a. P. Curtner, Reactor Supervisor f
R. E. :' iller, Chair =an, 2eactor Safety Coc=ittee t'