ML19345E212

From kanterella
Jump to navigation Jump to search
Responds to Re Alternate Hot Shutdown Capability. Results of Design Evaluation to Meet 10CFR50 App R Requirements Will Be Provided for Review & Concurrence
ML19345E212
Person / Time
Site: Farley  
Issue date: 12/05/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8012230461
Download: ML19345E212 (1)


Text

Al:bama P;wer Company 600 North 18th Street Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 250-1000 m

F. L CLAYTON, JR.

Senior Vice President Alabama Power

he southern electrc system December 5, 1980 Docket No. 50-348 No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Phillips Building, Room 116 7920 Norfolk Avenue Bethesda, Maryland 20014 Attention: Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 1 & 2 ALTERNATE SHUTDOWN CAPABILITY Gentlemen:

The purpose of this letter is to address the staff position presented in enclosure 1 to your letter of November 5,1980, concerning Farley Unit 2 alternate hot shutdown capability. This capability is one phase of alternate shutdown,Section III.L of 10CFR 50, Appendix R which becomes effective on February 19, 1981. Alabama Power Company will implement for Farley Unit 2 any modifications required for Farley Unit i for Appendix R,Section III.L in accordance with the schedules for implementation specified 10 10CFR 50.48(C)(5). Alabama Power Company will fully comply with provisions of the Farley Unit 2 fuel loading and low power testing license NPF-8 Section 2.C.(11) and provisions of Section 9.0 of the Farley Unit 2 Safety Evaluation Report, Supplement No. 4, related to fire protection.

The results of the design evaluation which will be performed to meet Appendix R alternate shutdown requirements will be provided to the NRC Staff for review and concurrence. Sufficient time will be taken for the evaluation in order to provide a thorough analysis which will ensure that a minimum capability safe shutdown train is provided.

~

If you have any questions, please advise.

Yours very truly, 3

d ^b h F

L. Clayton, g]r.

\\

g7/

RWS:rt cc: 'Mr. R. A. Thomas 3

Mr. G. F. Trowbridge Mr. E. A. Reeves

/D Mr. L. L. Kintner Mr. W. H. Bradford 8012230 g