Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350E951 + (00:01:36, 24 December 2024)
- ML19350E950 + (00:01:38, 24 December 2024)
- ML19350E949 + (00:01:39, 24 December 2024)
- ML19350E947 + (00:01:40, 24 December 2024)
- ML19350E945 + (00:01:41, 24 December 2024)
- IR 015000039/1981002 + (00:01:43, 24 December 2024)
- ML19350E943 + (00:01:45, 24 December 2024)
- ML19350E942 + (00:01:47, 24 December 2024)
- ML19350E940 + (00:01:48, 24 December 2024)
- ML19350E939 + (00:01:49, 24 December 2024)
- ML19350E938 + (00:01:50, 24 December 2024)
- IR 05000219/1981006 + (00:02:01, 24 December 2024)
- IR 05000312/1981015 + (00:02:06, 24 December 2024)
- ML19350E935 + (00:02:08, 24 December 2024)
- ML19350E933 + (00:02:09, 24 December 2024)
- ML19350E932 + (00:02:10, 24 December 2024)
- ML19350E931 + (00:02:12, 24 December 2024)
- ML19350E928 + (00:02:13, 24 December 2024)
- IR 05000302/1981004 + (00:02:14, 24 December 2024)
- ML19350E923 + (00:02:16, 24 December 2024)
- IR 05000518/1981007 + (00:02:19, 24 December 2024)
- ML19350E920 + (00:02:20, 24 December 2024)
- ML19350E916 + (00:02:21, 24 December 2024)
- ML19350E913 + (00:02:23, 24 December 2024)
- ML19350E914 + (00:02:23, 24 December 2024)
- ML19350E911 + (00:02:24, 24 December 2024)
- ML19350E909 + (00:02:26, 24 December 2024)
- ML19350E910 + (00:02:26, 24 December 2024)
- ML19350E908 + (00:02:27, 24 December 2024)
- ML19350E907 + (00:02:28, 24 December 2024)
- ML19350E904 + (00:02:29, 24 December 2024)
- ML19350E905 + (00:02:29, 24 December 2024)
- ML19350E902 + (00:02:30, 24 December 2024)
- ML19350E901 + (00:02:31, 24 December 2024)
- ML19350E900 + (00:02:32, 24 December 2024)
- IR 05000327/1981019 + (00:02:35, 24 December 2024)
- AECM-81-207, Interim Deficiency Rept 3 Re Vendor Wiring Problem in Size 3 Starters,Initially Reported 801111.Klockner-Moeller Will Inspect Each safety-related Starter Breaker for Power Cable Damage.Final Rept Expected by 811015 + (00:02:36, 24 December 2024)
- ML19350E896 + (00:02:39, 24 December 2024)
- IR 05000259/1980036 + (00:02:40, 24 December 2024)
- ML19350E893 + (00:02:42, 24 December 2024)
- ML19350E891 + (00:02:43, 24 December 2024)
- ML19350E890 + (00:02:44, 24 December 2024)
- ML19350E889 + (00:02:46, 24 December 2024)
- ML19350E887 + (00:02:47, 24 December 2024)
- ML19350E885 + (00:02:48, 24 December 2024)
- 05000311/LER-1981-017-03, /03L-0:on 810515,Action Statement 3.4.9.3 Was Entered When Control Operator Noticed Higher than Normal Temp on Pressurizer Power Operated Relief Valve Outlet Line. Caused by Leakage of Valve 2PR1.Valve Will Be Repaired + (00:02:50, 24 December 2024)
- ML19350E882 + (00:02:51, 24 December 2024)
- AECM-81-196, Final Deficiency Rept Re Incorrectly Ordered Throttling Valves for RHR Sys,Initially Reported 800912.Deficiency Found Reportable.Constructor Is Tracking Deficiency & Verifying Corrective Actions + (00:02:52, 24 December 2024)
- 05000311/LER-1981-017, Forwards LER 81-017/03L-0.Detailed Event Analysis Encl + (00:02:54, 24 December 2024)
- ML19350E878 + (00:02:55, 24 December 2024)
- IR 05000266/1981008 + (00:02:57, 24 December 2024)
- ML19350E874 + (00:02:59, 24 December 2024)