ML19350E905
| ML19350E905 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 06/08/1981 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| Shared Package | |
| ML19350E906 | List: |
| References | |
| NUDOCS 8106230637 | |
| Download: ML19350E905 (2) | |
See also: IR 05000312/1981015
Text
o
o^
.
'o
UNITED STATES
" , ,
8"
NUCLEAR REGULATORY COMMISSION
o
M-
E
REGION V
'b '
W90 N. CAL.lFORNIA BOULEVARD
o
SulTE 202, WALNUT CREE K PLAZA
+,..e
WALNUT CREEK, CALIFORNIA 94396
June 8, 1981
un i g
j@p
b
Docket No. 50-312
s
I.T h
F $21
pNgeA h
Sacrvnento Municipal Utility District
.g
P. O. Box 15830
A.Ay
Sacramento, California 95813
c,
h
Attention: Mr. John Mattimoe
4
W
Assistant General Manag,er & Chief Engineer
Gentlemen:
Subject:
NRC Inspection of Rancho Seco
This refers to the inspection conducted by Messrs. H. Canter and J. O'Brien
of this office on April 1 through 30, 1981 of activities authorized by NRC
(License) No. OPR-54, and to the discussion of our findings held by Messrs.
H. Canter and J. O'Brien with Mr. P. Oubre' and other members of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC'c Public
Document Room.
If this report contains any information that you believe to be exenpt
from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within ten (10) days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within 25 days from the date
'
of this letter a written application to this office to withhold such infor- tion.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons on the basis which it is claimed
that the information should be withheld from public disclosure. This section
IW
.s
8106230 &
<
. . .
r
,
,
.
.
d
. Sacramento Muni ipal Utility District
-2-
June 8, 1981
,
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we
do'not hear from you in this regard within the specified periods noted above,
the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sinc
y
/
hief
f
,
eactor perations Projects Branch
--
Enclosure:
_
IE Inspection Report
No. 50-312/81-15
cc w/o enclosure:
R. J. Rodriquez, SMUD
L. G. Schwieger, SMUD
l
I