ML19350E905

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-312/81-15 on 810401-30 & Notice of Violation
ML19350E905
Person / Time
Site: Rancho Seco
Issue date: 06/08/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19350E906 List:
References
NUDOCS 8106230637
Download: ML19350E905 (2)


See also: IR 05000312/1981015

Text

o

o^

.

'o

UNITED STATES

" , ,

8"

NUCLEAR REGULATORY COMMISSION

o

M-

E

REGION V

'b '

W90 N. CAL.lFORNIA BOULEVARD

o

SulTE 202, WALNUT CREE K PLAZA

+,..e

WALNUT CREEK, CALIFORNIA 94396

June 8, 1981

un i g

j@p

b

Docket No. 50-312

s

I.T h

F $21

pNgeA h

Sacrvnento Municipal Utility District

.g

P. O. Box 15830

A.Ay

Sacramento, California 95813

c,

h

Attention: Mr. John Mattimoe

4

W

Assistant General Manag,er & Chief Engineer

Gentlemen:

Subject:

NRC Inspection of Rancho Seco

This refers to the inspection conducted by Messrs. H. Canter and J. O'Brien

of this office on April 1 through 30, 1981 of activities authorized by NRC

(License) No. OPR-54, and to the discussion of our findings held by Messrs.

H. Canter and J. O'Brien with Mr. P. Oubre' and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser-

vations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC'c Public

Document Room.

If this report contains any information that you believe to be exenpt

from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within ten (10) days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within 25 days from the date

'

of this letter a written application to this office to withhold such infor- tion.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established. Consistent with section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons on the basis which it is claimed

that the information should be withheld from public disclosure. This section

IW

.s

8106230 &

<

. . .

r

,

,

.

.

d

. Sacramento Muni ipal Utility District

-2-

June 8, 1981

,

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we

do'not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sinc

y

/

hief

f

,

eactor perations Projects Branch

--

Enclosure:

_

IE Inspection Report

No. 50-312/81-15

cc w/o enclosure:

R. J. Rodriquez, SMUD

L. G. Schwieger, SMUD

l

I