ML19350E923
| ML19350E923 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/26/1981 |
| From: | Baynard P, Poole D FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19350E924 | List: |
| References | |
| 3-051-47, 810626, CS-81-116, NUDOCS 8106230661 | |
| Download: ML19350E923 (3) | |
Text
-
p e
" aerea Js 1
r4 9
- l M
-)).
, 3 j x.[R y]5 M
M,o u r. f' May 26, 1981 3-0 3-a-2 com CS-81-116
- 3-051-47 O
V Mr. J. P. O'Reilly, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta St., Suite 3100 Atlanta, GA 30303
Subject:
Docket No. 50-302 License No. DPR-72 Ref: RII:TCM 50-302/81-04
Dear Mr. O'Reilly:
Wr. offer the following response to the violation listed in the referenced inspection report.
NOTICE OF VIOLATION 10 CFR 71.5(b) requires that "the licensee comply with the applicable requirements of.. 49 CFR Parts 170-169." 49 CFR 173.393(j)(3) requires that rad ation levels shall not exceed ten millirem per hour at any point two meters (six feet) from the vertical planes projected by the outer lateral surface of the car or vehicle.
Contrary to the above, on Februar,7 10, 1981, one shipment of radioactive waste (AS 24614) was delivered to the Chem-Nuclear Services, Inc., of Barnwell, South Carolina burial site with radiation levels of 16 mR/hr at two meters from the vertical plane projected by the outer lateral surfaces of the vehicle.
Response: We agree with the violation as stated, however, it is our con-tention that this incident resulted from an instrument malfunction and not from deficien ies in our Waste Shipping Program.
All dose race instruments in use at this facility have been evaluated for geotropism. Those instruments exhibiting geotropic response have been labeled, and are procedurally governed to be used in the same orientation aoenoMI General Office 3201 Thirty rourtn street soutn. P O Box 14042, St Petersburg, F!onda 33733 e 813-866-5151
r
. l, J. P. O'Reilly Ref. RII:TCM/81 -May 26, 1981 as was used during calibration. The use of at least two (2) different radiation detection devices to perform the final vehicle e.it dose rate surveys on all radioactive shipment is now required by procedure.
An enhancement of compliance with the design criteria of the cask, by controlling the maximum radiation dose rates (hot spots) of the cask contents, has been instituted.
Full compliance has been achieved and no further corrective action is deemed necessary at this time.
Should there be further questions, please contact us.
Very truly yours, FLORIDA POWER CORPORATION 5'
Nuclear Plant Manager Patsy Y. Baynard Manager Nuclear Support Services JC/rc
-~_
STATE & FLORIDA COUNTY & PINELLAS P. Y. Bayntrd states that she is the Manager, Nuclear Support Services, of Florida Power Corporation; that she is authorized on the part of the said company to sign and file with the Nuclear Regulatory Comission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of her knowledge, infomation and belief.
QL..
78~ u d P.gYDBaynarp#
Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 26th day of May 1981.
'5
~[
- g. ;," ~
f,,
..c g
Notary Public Notary Public, State of Florida at Large, My Commission Expires: May 29, 1984
..r.