Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20004E759 + (15:43:11, 23 December 2024)
- ML20004E758 + (15:43:11, 23 December 2024)
- 05000245/LER-1981-009-03, /03L-0:on 810511,during Main Steam Line High Radiation Functional Test,Subchannel B Found to Trip Outside Acceptable Trip Setpoint Band.Caused by Instrument Setpoint Drift.Subchannel Recalibr & Tested + (15:43:13, 23 December 2024)
- 05000245/LER-1981-009, Forwards LER 81-009/03L-0 + (15:43:18, 23 December 2024)
- 05000338/LER-1981-028-03, /03L-0:on 810511,component Cooling Pipe Support & Snubber Removed Per Design Change 80-S46.Caused by Snubber Listed in Both Units 1 & 2 Tech Specs Although Installed on Unit 2 Piping of Common Sys.Snubber Deleted from Tech S + (15:43:20, 23 December 2024)
- IR 05000219/1981001 + (15:43:26, 23 December 2024)
- 05000338/LER-1981-028, Forwards LER 81-028/03L-0 + (15:43:28, 23 December 2024)
- ML20004E750 + (15:43:31, 23 December 2024)
- 05000272/LER-1981-047-03, /03L-0:on 810513,containment Air Lock Leak Rate Exceeded Design Pressure Tech Spec Limit During Sp.Caused by Outer Door Seal Not Holding Pressure.Seals Repaired & Tested + (15:43:32, 23 December 2024)
- ML20004E748 + (15:43:34, 23 December 2024)
- 05000272/LER-1981-047, Forwards LER 81-047/03L-0.Detailed Event Analysis Encl + (15:43:35, 23 December 2024)
- ML20004E745 + (15:43:36, 23 December 2024)
- 05000261/LER-1981-013-03, Determined Containment Isolation Valves Not Tested in Required Manner.Seven of Eight Valves Functioning as Designed.Eighth Valve Tested & Shown Operable.Test Undergoing Revision + (15:43:38, 23 December 2024)
- ML20004E742 + (15:43:39, 23 December 2024)
- 05000261/LER-1981-013, Forwards Updated LER 81-013/03L-1 + (15:43:41, 23 December 2024)
- 05000311/LER-1981-023-01, /01T-0:on 810522,main Steam Isolation Valves Failed to Close within Required 5-s During Startup Test. Caused by Design Error.Design Change Developed to Allow for Proper Interaction of Hydraulic & Steam Closing Subsys + (15:43:42, 23 December 2024)
- ML20004E738 + (15:43:44, 23 December 2024)
- 05000311/LER-1981-023, Forwards LER 81-023/01T-0.Detailed Event Analysis Encl + (15:43:45, 23 December 2024)
- IR 05000271/1980019 + (15:43:50, 23 December 2024)
- 05000331/LER-1981-019-01, /01T-0:on 810526,found Tech Spec Surveillance Requirements for Determining River Water Supply Sys Pump TDH Not Being Met.Caused by Limits on Nameplate Data Being Too Stringent for Normal Operation + (15:43:51, 23 December 2024)
- ML20004E733 + (15:43:53, 23 December 2024)
- ML20004E732 + (15:43:54, 23 December 2024)
- ML20004E730 + (15:43:58, 23 December 2024)
- ML20004E729 + (15:43:59, 23 December 2024)
- ML20004E727 + (15:44:00, 23 December 2024)
- ML20004E726 + (15:44:01, 23 December 2024)
- ML20004E725 + (15:44:02, 23 December 2024)
- ML20004E724 + (15:44:03, 23 December 2024)
- ML20004E722 + (15:44:04, 23 December 2024)
- ML20004E721 + (15:44:06, 23 December 2024)
- ML20004E719 + (15:44:07, 23 December 2024)
- 05000272/LER-1981-054-01, /01T-0:on 810521,vendor Advised That Regulatory Requirements Could Be Violated by Failure of Vol Control Tank Level Control Sys & Subsequent Loss of Suction to Centrifugal Charging Pump W/Failure of Remaining Pump + (15:44:08, 23 December 2024)
- ML20004E717 + (15:44:09, 23 December 2024)
- 05000272/LER-1981-054, Forwards LER 81-054/01T-0.Detailed Event Analysis Encl + (15:44:11, 23 December 2024)
- ML20004E714 + (15:44:13, 23 December 2024)
- ML20004E713 + (15:44:14, 23 December 2024)
- ML20004E712 + (15:44:15, 23 December 2024)
- IR 05000461/1981007 + (15:44:18, 23 December 2024)
- ML20004E709 + (15:44:19, 23 December 2024)
- A01184, Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA + (15:44:20, 23 December 2024)
- ML20004E706 + (15:44:23, 23 December 2024)
- ML20004E705 + (15:44:25, 23 December 2024)
- ML20004E704 + (15:44:26, 23 December 2024)
- ML20004E702 + (15:44:27, 23 December 2024)
- A01698, Forwards Info Re SEP Topics VI-2.D & VI-3,concerning Mass & Energy Release for Postulated Pipe Breaks Inside Containment & Containment Pressure & Heat Removal Capability, Respectively.Addl Details Proprietary to GE + (15:44:30, 23 December 2024)
- ML20004E698 + (15:44:32, 23 December 2024)
- IR 05000346/1981009 + (15:44:33, 23 December 2024)
- ML20004E695 + (15:44:34, 23 December 2024)
- ML20004E692 + (15:44:35, 23 December 2024)
- ML20004E689 + (15:44:36, 23 December 2024)
- ML20004E688 + (15:44:37, 23 December 2024)