ML20004E698
| ML20004E698 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/08/1981 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20004E696 | List: |
| References | |
| NUDOCS 8106150072 | |
| Download: ML20004E698 (2) | |
Text
@
o w
I NtC1.FAR OI'ERATIONS e
MANAGER
( N.RAC )
11FFliTY MANAGFRS H
(2)
(ORC)
C;g t------
- - ~ ~ -
6n Q
MANAGEMt.NT SERVICES h
NUCl. EAR OFFRATIONS ON SITF. SAFETT AND CROIT (OPC)
STAFF ASSISTATT FRITiltMANCF CRP. I FAf1FR(ORC 1 I
~
l
~ ~'
SHIFT' FERfDPMANCE
~
FNGINEF.RS 01MPLIANCE Otf1ACF OF FIC F.
ENGINFER(S)
SOlFDt11 NC SLIPERVISOR l
i~
"' DII FF Oll EF Ot t EF
~SECITRITV MUCLEAR DAY W4TCH FNCR'S, RADIOll)CICAL TEC11NICAl.
MAINTENANCE StrFERVISOR TRAINING WATCH ENG'R.
3 FNCINFFRioRC)
(SRO){
EN#' ' " '.
- FNCINEER STAFF (SRO) (ORC)
(ORC)
(ORC)
OPERATINC T FOtNIC AI.
~
' - - ~ '
FUFFRVIMOR(S
%TAFF (RO)
TEGINICAL TFCitNICAl, I
I I
STAFF STAFF PILCRIM l NtCI. EAR HEALT11
- g. %1E j
STATION ORGANIZATION PIANT rHYSICS Al#RA
%\\NACFMENT m
l i
RF.ACTUR t HDilCAL 3 STR.6 MAINTIN ANCE OPER AWR (S)
ENCR.(S) 73"R.
ENGINEFR ENCINEER FNCRS.
CONTROL StfPF RYi noR(S)
I"OI SU'FFVISOR(S) 7
~
~
NilCLF.AR At!RILIARY FHYSICS AtARA FIANT NUCLEAR CHEMICAL NICLFAR
,s1PF RATD_R(S),.
TFCH.tS)
T0089 ATTFND-IS '
& CLFRKS,
,. ANIC_,
i 4
i 01DE: NSRAC - MF.MBER OF NSRAC ORC
- MEMBFR OF ORC RO
- NRC RFACTOR f1FFRATnt I,1CENsF.
- NRC SFNIOR RFAC111R of FP ATT1R 1.lCFN%F O
riCi3E A.2.2 O
i 23 en Cicansim rica W
2 10 7/ loc,s a
~
6.)
REVIEW AND AUDIT t..
OPERATIONS REVIEW COKMITTEE (ORC) 1.
FUNCTION The ORC shall function to advise the Nuclear Operations Manager on all mattern related to nuclear safety.
2.
COMPOSITION
~
The ORC shall be composed of the:
Chairman:
Deputy Nuclear Operations Managers Member:
Management Services Group Leader I
Member:
Day Watch Engineer l
Member:
Chief Technical Engineer Member:
Chief Maintenance Engineer Merber:
Chief Radiological Engineer Member:
On Site Safety and Performance Grcup Leader l
3.
ALTERNATES Alternate members shall be appointed in writing by the ORC Chairms.n to serve on a temporary basis; however, no more than two alternates shall participate in an ORC quorum at any one time.
s 4.
MfETING FREQUENCY The OkC shall meet at least once per calendar month and as convened by the ORC Chairman.
5.
QUORUM A quorum of the ORC shall consist of the Chairman and majority of members including alternates.
6.
RESPONSIBILIT'ZS The ORC shall be responsible for:
Review of 1) all procedures required by Specification 6.8 a.
and changes thereto, 2) any other proposed procedures or changes thereto that affect nuclear safety, Review of all proposed tests and experiments that af f ect nuclear b.
safs:y.
Review of all proposed changes to the Technical Specifications.
c.
Review of all proposed changes or modifications to plant systems d.
or equipment that affect nuclear safety, Investigation of all violations of the Technical Specifications anc e.
'.all prepare and forward a report covering evaluation and recom-mendations to prevent recurrence to the Nuclear Operations Manager and to the NSRAC Chairman.
aw