ML20004E748
| ML20004E748 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 03/25/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Finfrock I JERSEY CENTRAL POWER & LIGHT CO. |
| Shared Package | |
| ML20004E743 | List: |
| References | |
| NUDOCS 8106150165 | |
| Download: ML20004E748 (2) | |
See also: IR 05000219/1981001
Text
~
.
.
.
f "Uu
O
UNITED STATES
%j
N/
NUCLEAR REGULATORY COMMISSION
L
E
REGICN I
Q,
4
631 PARK AVENUE
%*****,@
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket No. 50-219
MAR 25 W
Jersey Central Power and Light Company
ATTN: Mr. Ivan R. Finfrock, Jr.
Vice Presi. dent
P. O. Box 388
Forked River, New Jersey 08731
Centlemen:
Subject:
Inspection 50-219/81-01
This refers to the routine inspection conducted by Mr. J. A. Thomas of this
office on January 5-31, 1981 at the Oyster Creek Nuclear Generating Station,
Forked River, New Jersey of activities authorized by NRC License No. OPR-16 and
to the discussions of our findings held by Mr. Thomas with Mr. J. T. Carroll and
other members of your staff periodically during this inspecticn.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix
A.
,
Item A in the Notice of Violation enclosed with this letter was identified
during a previous inspection of your licensed activities on May 2-30, 1980 and
was documented in the enclosure to our letter dated August 11, 1980.
Your
letter to this office dated September 3, 1980 stated:
"This occurrence will be
discussed with the Operations personnel as an example of the problems that can
occur when alarms are not promptly followed up avi corrected.
This material and
a directive memo from the Operations Supervisor w1',1 be promulgated to all
Operations personnel."
From our January 5-31, 1981 inspection it appears that
the stated corrective actions were not effective since this item has recurred.
Recurrent and uncorrected items of noncompliance are given additional weight in
the consideratio" and selection of appropriate enforcement action.
Therefore,
in your response to this letter, you should give particular attention to those
actions taken or planned to ensure that identified items of noncompliance will
be completely corrected and will not recur.
8106150 h
.
.
.
.-.
. . .
. .
,
___
.
.
-
Jersey Central Power and Light
MAR 251981
Company
2
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we'do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.
.
1o
Brunner, Acting Director,
Division of Resident and Project
In'spection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-219/81-01
cc w/encis:
M. Laggart, Licensing Supervisor
J. Knubel, BWR Licensing Manager