Forwards IE Insp Rept 50-346/81-09 on 810421.No Noncompliance Noted
ML20004E692
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/06/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20004E693 List:
References
NUDOCS 8106150067
Download: ML20004E692 (2)


See also: IR 05000346/1981009

Text

r

1

T l (./

-

.pe

UNITED STATES

E' "

NUCLEAR REGULATORY COMMISSION

,,9

' * ' '

e

/.r

REGION 111

Y

'#

799 ROOSEVELT ROAD

g*

GLEN ELLYN,ILLINolS 6o137

.....

MM

e ;99;

' C

t--

0).

Docket No. 50-346

S'N

fJN

{f

'

g

Toledo Edison Company

'

f

.

WIU

ATTN:

Mr. Richard P. Crouse

u

1E

JUN J o 193;

7,

Vice President

,

Nuclear

Q u. , %, %

Edison Plaza

y))

co w n w

300 Madison Avenue

p

,

Toledo, OH 43652

g,

-

s

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin

of this office on April 21, 1981, at your corporate office, of activities

at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC License

No. NPF-3 and to the discussion of our findings with Mr. C. Domeck and

others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordante with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the hTC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a?(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

,

'

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

l

81061500N

Q

.

Toledo Edison Company

-2-

MAY

6 198!

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations _ listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inrpection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

. f J-16r"k- - &

C. E. Norelius, Acting Director

Division of Engineering and Technical

Inspection

Enclosure:

IE Inspection

Report No. 50-346/81-09

cc w/ encl:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

.

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio

.- -

,,

,-

,

. . . - . .

. - , . .

, .

.-.

- . _ -

- ..

.-