ML20004E692
| ML20004E692 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/06/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20004E693 | List: |
| References | |
| NUDOCS 8106150067 | |
| Download: ML20004E692 (2) | |
See also: IR 05000346/1981009
Text
r
1
T l (./
-
.pe
UNITED STATES
E' "
NUCLEAR REGULATORY COMMISSION
,,9
' * ' '
e
/.r
REGION 111
Y
'#
799 ROOSEVELT ROAD
g*
GLEN ELLYN,ILLINolS 6o137
.....
MM
e ;99;
' C
t--
0).
Docket No. 50-346
S'N
fJN
{f
'
g
Toledo Edison Company
'
f
.
WIU
ATTN:
Mr. Richard P. Crouse
u
1E
JUN J o 193;
7,
Vice President
,
Nuclear
Q u. , %, %
Edison Plaza
y))
co w n w
300 Madison Avenue
p
,
Toledo, OH 43652
g,
-
s
Gentlemen:
This refers to the special safety inspection conducted by Mr. I. T. Yin
of this office on April 21, 1981, at your corporate office, of activities
at Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC License
No. NPF-3 and to the discussion of our findings with Mr. C. Domeck and
others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordante with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the hTC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a?(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
,
'
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
l
81061500N
Q
.
Toledo Edison Company
-2-
MAY
6 198!
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations _ listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inrpection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
. f J-16r"k- - &
C. E. Norelius, Acting Director
Division of Engineering and Technical
Inspection
Enclosure:
IE Inspection
Report No. 50-346/81-09
cc w/ encl:
T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
AE0D
Resident Inspector, RIII
Local PDR
.
Harold W. Kohn, Power
Siting Commission
Helen W. Evans, State of Ohio
.- -
,,
,-
,
. . . - . .
. - , . .
, .
.-.
- . _ -
- ..
.-