ML20004E750

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810105-31
ML20004E750
Person / Time
Site: Oyster Creek
Issue date: 03/25/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004E743 List:
References
50-219-81-01, 50-219-81-1, NUDOCS 8106150170
Download: ML20004E750 (1)


Text

.

AV APPENDIX A NOTICE OF VIOLATION Jersey Central Power and Light Company Docket No. 50-219 Oyster Creek Nuclear Generating Station License No. DPR-16 As a result of the inspection conducted on January 5-31, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the follow-ing violation was identified:

A.

Technical Specification Section 6.8.1 states, in part, "Writtsn procedures shall be established, implemented, and maintained...".

Procedure 106, Revision 14, October 24, 1980, Conduct of Operations, Section 4.2.1 states, in part, " Station Procedures shall be followed at all times...".

Section 4.4.7 states, " Alarms and indications are provided to shift operators in order to provide information and warnings. Operators are to believe the alarms and indications provised unless it is verified by other means (i.e.,

another indication or direct observations) to be false."

Procedure 501, Revision 44, December 12, 1980, Annunciators and Alarms, Section 5F/6F.L, " FILTERS EGTS 8 HI DIFF PRESSURE OR HTR CKT FAILURE" alarm states in part, " Start exhaust fan *1-9 and place Standby Gas Treatment System 2 in service as necessary.

Check system 1 filters and heater circuit."

Contrary to the above, on January 26, 1981 at 9:40 a.m. when Standby Gas Treatment System I was started, the " FILTERS EGTS 8 HI DIFF PRESSURE OR HTR CKT FAILURE" alarm annunciated; however, exhaust fan 1-9 was not started, Standby Gas Treatment System 2 was not placed in service, and system 1 filters and heater circuit were not checked.

(Recurrent)

This is a Severity Level V Violat. ion (Supplement I)

Pursuant to the provisions of 10 CFR 2.201, Jersey Central Power and Light Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply including the corrective steps which have been taken and results achieved; corrective steps which will be taken to avoid further violations; and the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Date Eldbpf J. 'Brunner, Acting Director Division of Resident and Project Inspection 810615 0 l70

_