Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005A450 + (15:09:40, 23 December 2024)
- ML20005A449 + (15:09:41, 23 December 2024)
- ML20005A448 + (15:09:42, 23 December 2024)
- 05000259/LER-1981-030, Forwards LER 81-030/01T-0 + (15:09:43, 23 December 2024)
- ML20005A445 + (15:09:44, 23 December 2024)
- ML20005A444 + (15:09:45, 23 December 2024)
- ML20005A443 + (15:09:46, 23 December 2024)
- GO2-81-148, Interim Deficiency Rept Re Control Room Balance of Plant Panel Quality & Seismic Class,Initially Reported on 810520. GE Evaluating Condition & Will Provide Review Results by 810705.Final Rept Will Be Provided by 810720 + (15:09:47, 23 December 2024)
- ML20005A441 + (15:09:47, 23 December 2024)
- ML20005A438 + (15:09:50, 23 December 2024)
- ML20005A437 + (15:09:51, 23 December 2024)
- ML20005A435 + (15:09:52, 23 December 2024)
- ML20005A436 + (15:09:52, 23 December 2024)
- RBG-10618, Final Deficiency Rept Re Overturning of Primary Shield Wall During Const Movement.Base Plate Is Being Reworked to Restore to Original Design Conditions.Attachments to Base Plate Will Be Replaced + (15:09:53, 23 December 2024)
- ML20005A433 + (15:09:55, 23 December 2024)
- ML20005A432 + (15:09:56, 23 December 2024)
- ML20005A431 + (15:09:56, 23 December 2024)
- ML20005A430 + (15:09:58, 23 December 2024)
- ML20005A429 + (15:10:01, 23 December 2024)
- ML20005A428 + (15:10:02, 23 December 2024)
- ML20005A425 + (15:10:03, 23 December 2024)
- ML20005A427 + (15:10:03, 23 December 2024)
- 05000269/LER-1980-040-01, /01T-0:on 801226,removable Instrument Assembly 40 Count Rate Increased,Apparently Due to Leak in once-through Steam Generator Tube.Caused by High Cycle Fatigue.Tube Replaced.Leak Procedure Implemented + (15:10:05, 23 December 2024)
- 05000364/LER-1981-019-03, /03L-0:on 810526,plant Vent Stack Effluent Monitor R-29B Was Declared Inoperable Due to Pump Trip. Caused by Dirty Filter.Filter Was Replaced.Frequency for Performing Preventative Maint on Filter Will Be Evaluated + (15:10:07, 23 December 2024)
- ML20005A422 + (15:10:08, 23 December 2024)
- 05000269/LER-1980-040, Forwards LER 80-040/01T-0.Detailed Event Analysis Encl + (15:10:09, 23 December 2024)
- ML20005A419 + (15:10:10, 23 December 2024)
- ML20005A417 + (15:10:11, 23 December 2024)
- 05000364/LER-1981-019, Forwards LER 81-019/03L-0 + (15:10:12, 23 December 2024)
- ML20005A413 + (15:10:13, 23 December 2024)
- ML20005A412 + (15:10:14, 23 December 2024)
- PNO-II-81-044, on 810619,generator Tripped.Caused by Main Transformer C Failure Probably Due to Damage from Internal Fault.Transformer Replaced + (15:10:16, 23 December 2024)
- ML20005A410 + (15:10:17, 23 December 2024)
- ML20005A409 + (15:10:18, 23 December 2024)
- PNO-I-81-070, on 810621,22 & 23,noble Gas Released.First Two Events Probably Caused by Leaking Drain Isolation Valve on Mechanical Compressor B.Valves on Compressors a & B Replaced.Last Release Under Investigation + (15:10:20, 23 December 2024)
- ML20005A407 + (15:10:20, 23 December 2024)
- ML20005A406 + (15:10:21, 23 December 2024)
- PNO-I-81-069, on 810619-22,radioactive Water Was Released Through Storm Drain Sys to Unrestricted Area.Cause Not Stated.Storm Drain Sys Sealed,Flushed & Cleaned + (15:10:23, 23 December 2024)
- ML20005A403 + (15:10:24, 23 December 2024)
- ML20005A404 + (15:10:24, 23 December 2024)
- ML20005A402 + (15:10:25, 23 December 2024)
- ML20005A401 + (15:10:25, 23 December 2024)
- ML20005A400 + (15:10:26, 23 December 2024)
- ML20005A399 + (15:10:27, 23 December 2024)
- ML20005A397 + (15:10:28, 23 December 2024)
- ML20005A396 + (15:10:28, 23 December 2024)
- ML20005A394 + (15:10:29, 23 December 2024)
- ML20005A393 + (15:10:30, 23 December 2024)
- ML20005A391 + (15:10:31, 23 December 2024)
- ML20005A392 + (15:10:31, 23 December 2024)
- ML20005A389 + (15:10:32, 23 December 2024)